Rts Shearing Llc
Dba Rts Shearing Llc

CAGE Code: 5ABY7

NCAGE Code: 5ABY7

Status: Active

Type: Commercial Supplier

Dun & Bradstreet (DUNS): 845302343

Summary

Rts Shearing Llc, Dba Rts Shearing Llc is an Active Commercial Supplier with the Cage Code 5ABY7 and is tracked by Dun & Bradstreet under DUNS Number 845302343..

Address

2511 17Th St Se
Jamestown ND 58401-5974
United States

Points of Contact

No Points of Contact...

Related Information

Associated CAGE Codes People who viewed this 'CAGE Code' also viewed...

CAGE Code FAQ Frequently Asked Questions (FAQ) for CAGE 5ABY7

What is CAGE Code 5ABY7?
5ABY7 is the unique identifier used by NATO Organizations to reference the physical entity known as Rts Shearing Llc Dba Rts Shearing Llc located at 2511 17Th St Se, Jamestown ND 58401-5974, United States.
Who is CAGE Code 5ABY7?
5ABY7 refers to Rts Shearing Llc Dba Rts Shearing Llc located at 2511 17Th St Se, Jamestown ND 58401-5974, United States.
Where is CAGE Code 5ABY7 Located?
CAGE Code 5ABY7 is located in Jamestown, ND, USA.

Contracting History for CAGE 5ABY7 Contracting History for CAGE 5ABY7 Most Recent 25 Records

140FS223P0128
Nd Arrowwood Nwr Gravel-Delivery And Spread Of Class 5 Gravel
25 Aug 2023
Fws, Sat Team 2
Department Of The Interior (Doi)
$48,938.40
W9128F21C0049
Jenny Granner Bank Stabilization
30 Aug 2021
W071 Endist Omaha
Department Of Defense (Dod)
$905,321.09
W912ES16C0010
Add Concrete Keyways To The Slabs Of The Drawdown Control Structure To Increase The Structure's Resistance To Shear Forces.
14 Jun 2018
W07v Endist St Paul
Department Of Defense (Dod)
$9,087,362.31
W912ES16C0010
This Contract Is Modified To: 1) Change The Width Of All Of The Field Approaches From 20-Feet To 50-Feet At The Toe Of The Approach; 2) Build New Field Accesses Located In The Vicinity Of Sta E86+50 On Both Left And Right Side Of The Embankment; 3) Extend The Contract Completion Date By 30 Days To 27 September 2019 Due To High Water Conditions In June 2019.
8 Jul 2019
W07v Endist St Paul
Department Of Defense (Dod)
$9,087,362.31
W912ES16C0010
Igf::Ot::Igf Remove Unsatisfactory Materials In The Footprint Of The Drawdown Structure And Replace With Impervious Fill.
9 Apr 2018
W07v Endist St Paul
Department Of Defense (Dod)
$9,087,362.31
W912ES16C0010
This Contract Is Modified To 1- Furnish And Install A 12-Inch (Minimum) Tall, 48-Inch Diameter Riser To The Gauge Well Located In The Vicinity Of Sta D 23+30, 10-Feet Left Of Control Line D.
10 Feb 2020
W07v Endist St Paul
Department Of Defense (Dod)
$9,087,362.31
W912ES16C0010
This Contract Is Modified To: 1) Repair The Breach Cut Slope On The Old Embankment Where It Was Damaged By Sustained High Water In The Pomme De Terre Channel. 2) Change The Abutment Walls At The Service Spillway. 3) Extend The Contract Required Completion Date By 31 Days To Account For High Water In The Minnesota River Which Prevented The Contractor From Completing Critical Path Activities.
26 Aug 2019
W07v Endist St Paul
Department Of Defense (Dod)
$9,087,362.31
W912ES16C0010
This Contract Is Modified To 1) Restore The Seeding To The Area Tilled Up By The Adjacent Farmer 2) Add 22 Wilderness Management Area Signs Along The Property Line To Prevent Future Incursions 3) Extend The Contract Required Completion Date By 39 Days To Account For High Water In The Minnesota River Which Prevented The Contractor From Completing Critical Path Activities From The Period 1 November To 9 December 2019.
14 Jan 2020
W07v Endist St Paul
Department Of Defense (Dod)
$9,087,362.31
W912ES16C0010
This Contract Is Modified To Extend The Contract By 49 Days To Account For High Water In The Minnesota River System In September And October 2019.
21 Nov 2019
W07v Endist St Paul
Department Of Defense (Dod)
$9,087,362.31
W912ES16C0010
This Contract Is Modified To: Place Approximately 410 Ton Of Bedding And 1,110 Tons Of Riprap On The West Slope Of The Fish Passage West Embankment, In Order To Protect It From Erosion During High Water Events.
13 Feb 2020
W07v Endist St Paul
Department Of Defense (Dod)
$9,087,362.31
W9128F22P0095
Gravel
12 Sep 2022
W071 Endist Omaha
Department Of Defense (Dod)
$113,883.75
W912ES16C0010
This Contract Is Modified To Adjust The Contract Quantities To The Actual Final Quantities For Multiple Clins.
7 May 2021
W07v Endist St Paul
Department Of Defense (Dod)
$9,250,632.77
W912ES16C0010
Remove And Dispose Of Existing Riprap Placed Beloew The Main Spillway For Marsh Lake Dam And Along The East Bank Of The Minnesota River, Change The Installation Of The Fish Passage Orifice Line To Increase The Depth Of Bury And Encase In 2 Inch Schedule 80 Pvc Duct.
29 Apr 2019
W07v Endist St Paul
Department Of Defense (Dod)
$9,087,362.31
W912ES16C0010
Extend The Contract Completion Date By 33 Days To Account For High Water In The Minnesota River Between 1 August Thru 2 September 2019 Which Prevented The Contractor From Completing Critical Path Activities
4 Oct 2019
W07v Endist St Paul
Department Of Defense (Dod)
$9,087,362.31
W912ES16C0010
Adjust Estimated Contract Quantities For Clin 1008Ab Removal Of Unsatisfactory Material At The Pomme De Terre Crossing To Actual Quantities; Extend The Contract By 58 Days As A Result Of High Water Which Disrupted Critical Path Activities In The Months Of April And May 2019.
13 Jun 2019
W07v Endist St Paul
Department Of Defense (Dod)
$9,087,362.31
W912ES16C0010
Revise The Scope Of Work To (1) Eliminate The Rock Riffles, Toe Wood Structures And Channel Plugs North Of The Embankment; (2) Delete The Requirement To Remove The Embankment Between Stations D 57+67 And D 98+40; (3) Revise The Orientation Of The Channel Restoration Through The Embankment; (4) Add Boulders At The West End Of The East Parking Lot; (5) Add Type 3 Barricades On The Embankment Road.
26 Mar 2019
W07v Endist St Paul
Department Of Defense (Dod)
$9,087,362.31