Mtfa Architecture, P.L.L.C.
CAGE Code: 5ABS9
NCAGE Code: 5ABS9
Status: Active
Type: Commercial Supplier
Dun & Bradstreet (DUNS): 829063713
Summary
Mtfa Architecture, P.L.L.C. is an Active Commercial Supplier with the Cage Code 5ABS9 and is tracked by Dun & Bradstreet under DUNS Number 829063713..
Address
3200 Lee Hwy
Arlington VA 22207-3744
United States
Points of Contact
No Points of Contact...
Related Information
People who viewed this 'CAGE Code' also viewed...
Applied Chaos Technology Corp Eagle Tractor Mowing Co Arinc Research Corp Brokey Florence A Proserv Television Research Partners Llc Stellacom Inc Bruning Inc Hardin Electronics Federal Lock & Safe Inc Visitech Enterprises, Inc. Reprographic Products Group, Inc. Quantel Wallace Computer Services Swain Roofing Of Arlington Inc Leads Corporation Adkins And Associates Dba Am Multigraphics Tempories Inc Kelly Services
Frequently Asked Questions (FAQ) for CAGE 5ABS9
- What is CAGE Code 5ABS9?
- 5ABS9 is the unique identifier used by NATO Organizations to reference the physical entity known as Mtfa Architecture, P.L.L.C. located at 3200 Lee Hwy, Arlington VA 22207-3744, United States.
- Who is CAGE Code 5ABS9?
- 5ABS9 refers to Mtfa Architecture, P.L.L.C. located at 3200 Lee Hwy, Arlington VA 22207-3744, United States.
- Where is CAGE Code 5ABS9 Located?
- CAGE Code 5ABS9 is located in Arlington, VA, USA.
Contracting History for CAGE 5ABS9 Most Recent 25 Records
- N0017823FD210
- A&E Services For Ee, Se, And Fpe Services
- 15 Sep 2023
- A&E Services For Ee, Se, And Fpe Services
- Nswc Dahlgren
- Department Of Defense (Dod)
- $568,586.89
- Department Of Defense (Dod)
- N0017823FD211
- A&E And Planning Spt Scv
- 20 Sep 2023
- A&E And Planning Spt Scv
- Nswc Dahlgren
- Department Of Defense (Dod)
- $1,059,477.14
- Department Of Defense (Dod)
- N0017823FD209
- A-E Services
- 7 Sep 2023
- A-E Services
- Nswc Dahlgren
- Department Of Defense (Dod)
- $242,217.41
- Department Of Defense (Dod)
- 140P3023F0133
- Perform Title I Architect/Engineer (A/E) Services For Comprehensive Condition Assessment For Repair Engineers Tower Water Control Structure At Widewater For The Chesapeake & Ohio Canal Historical Park.
- 14 Sep 2023
- Perform Title I Architect/Engineer (A/E) Services For Comprehensive Condition Assessment For Repair Engineers Tower Water Control Structure At Widewater For The Chesapeake & Ohio Canal Historical Park.
- Ncr Regional Contracting(30000)
- Department Of The Interior (Doi)
- $129,195.15
- Department Of The Interior (Doi)
- 140P3023F0134
- Perform Title I And Ii A/E Services For Exterior Envelope And Drainage Repairs At The Cushwa Warehouse And Williamsport Power Generating Station For The Chesapeake & Ohio Canal Historical Park.
- 22 Sep 2023
- Perform Title I And Ii A/E Services For Exterior Envelope And Drainage Repairs At The Cushwa Warehouse And Williamsport Power Generating Station For The Chesapeake & Ohio Canal Historical Park.
- Ncr Regional Contracting(30000)
- Department Of The Interior (Doi)
- $346,866.42
- Department Of The Interior (Doi)
- 47PM0123F0024
- Vendor/Entity Change
- 13 Nov 2023
- Vendor/Entity Change
- Pbs R11 Construction Services Divsion Center 1
- General Services Administration (Gsa)
- $353,555.92
- General Services Administration (Gsa)
- 47PM0123F0024
- Create Admin Mod To Correct Pegasys Vendor Code
- 15 Dec 2023
- Create Admin Mod To Correct Pegasys Vendor Code
- Pbs R11 Construction Services Divsion Center 1
- General Services Administration (Gsa)
- $353,555.92
- General Services Administration (Gsa)
- 47PM0123F0024
- A_E Replace Moveable Bollards At Loading Dock In Dot Hq
- 31 Jul 2023
- A_E Replace Moveable Bollards At Loading Dock In Dot Hq
- Pbs Ncr Capital Construction Ctr 1
- General Services Administration (Gsa)
- $353,555.92
- General Services Administration (Gsa)
- 47PM0323F0036
- Replace The Existing Playground Equipment That Accommodates Infants/Toddlers And Provide An Alternative Surface That Meets The Requirements For Care Center That Does Absorb So Much Heat During The Summer Months.
- 20 Jul 2023
- Replace The Existing Playground Equipment That Accommodates Infants/Toddlers And Provide An Alternative Surface That Meets The Requirements For Care Center That Does Absorb So Much Heat During The Summer Months.
- Pbs Ncr Capital Construction Ctr 3
- General Services Administration (Gsa)
- $92,927.93
- General Services Administration (Gsa)
- 47PM0923F0061
- Court Hardening Tech Study
- 6 Sep 2023
- Court Hardening Tech Study
- Pbs Ncr Oper&Maintenance Center 3
- General Services Administration (Gsa)
- $522,311.71
- General Services Administration (Gsa)
- 47PM0323F0009
- Design Roof Anchorage System For Epa Bldgs
- 6 Jul 2023
- Design Roof Anchorage System For Epa Bldgs
- Pbs Ncr Capital Construction Ctr 3
- General Services Administration (Gsa)
- $594,749.62
- General Services Administration (Gsa)
- N0017822FD449
- Labor A-E Services
- 1 Aug 2022
- Labor A-E Services
- Nswc Dahlgren
- Department Of Defense (Dod)
- $264,284.60
- Department Of Defense (Dod)
- N0017822FD456
- Labor For Architectural Engineering
- 14 Jun 2023
- Labor For Architectural Engineering
- Nswc Dahlgren
- Department Of Defense (Dod)
- $555,673.60
- Department Of Defense (Dod)
- 140P3022F0121
- Title I Architect/Engineer (A/E) Services To Conduct Condition Assessment And Crack Monitoring On The World War Ii Memorial Located In Washington, D.C.
- 7 Sep 2022
- Title I Architect/Engineer (A/E) Services To Conduct Condition Assessment And Crack Monitoring On The World War Ii Memorial Located In Washington, D.C.
- Ncr Regional Contracting(30000)
- Department Of The Interior (Doi)
- $320,219.53
- Department Of The Interior (Doi)
- 140P3022F0103
- P00002: No Cost Time Extension (Ncte) Extend The Task Order Period Of Performance From The Previous End Date Of 11/14/2023 To A New Task Order End Date Of 2/12/2024 At No Additional Cost To The Government. The Additional Time Is Required Due To Delay
- 22 Dec 2023
- P00002: No Cost Time Extension (Ncte) Extend The Task Order Period Of Performance From The Previous End Date Of 11/14/2023 To A New Task Order End Date Of 2/12/2024 At No Additional Cost To The Government. The Additional Time Is Required Due To Delay
- Ncr Regional Contracting(30000)
- Department Of The Interior (Doi)
- $143,742.27
- Department Of The Interior (Doi)
- 140P3022F0103
- Title I & Ii Architect/Engineer (Ae) Services To Prepare Construction Documents For Dogwood Trail And Culvert Rehabilitation.
- 5 Sep 2023
- Title I & Ii Architect/Engineer (Ae) Services To Prepare Construction Documents For Dogwood Trail And Culvert Rehabilitation.
- Ncr Regional Contracting(30000)
- Department Of The Interior (Doi)
- $143,742.27
- Department Of The Interior (Doi)
- 140P3022F0101
- Mod P00002: Incorporate Far 52.204-27 Clause In Accordance With Doi Guidance
- 7 Jun 2023
- Mod P00002: Incorporate Far 52.204-27 Clause In Accordance With Doi Guidance
- Ncr Regional Contracting(30000)
- Department Of The Interior (Doi)
- $171,803.90
- Department Of The Interior (Doi)
- 140P3022F0101
- Mod P00003: Ncte
- 26 Sep 2023
- Mod P00003: Ncte
- Ncr Regional Contracting(30000)
- Department Of The Interior (Doi)
- $171,803.90
- Department Of The Interior (Doi)
- 140P3022F0101
- Mod P00001: Provide A Ncte Due To Delays In Project Directly Resulting From Resubmission Of Deliverables And Review Times Requires By Nps, Md Shpo, Md Doe, And Usace.
- 7 Jun 2023
- Mod P00001: Provide A Ncte Due To Delays In Project Directly Resulting From Resubmission Of Deliverables And Review Times Requires By Nps, Md Shpo, Md Doe, And Usace.
- Ncr Regional Contracting(30000)
- Department Of The Interior (Doi)
- $171,803.90
- Department Of The Interior (Doi)
- N0017822FD458
- Labor For Facilities Data A-E Services
- 12 Sep 2022
- Labor For Facilities Data A-E Services
- Nswc Dahlgren
- Department Of Defense (Dod)
- $329,865.09
- Department Of Defense (Dod)
- N0017822FD410
- Minimum Obligation
- 12 Jan 2022
- Minimum Obligation
- Nswc Dahlgren
- Department Of Defense (Dod)
- $500.00
- Department Of Defense (Dod)
- 47PM0122F0014
- No Cost Time Extention
- 7 Dec 2022
- No Cost Time Extention
- Pbs Ncr Capital Construction Ctr 1
- General Services Administration (Gsa)
- $192,198.27
- General Services Administration (Gsa)
- 47PM0122F0014
- Ae Services Feasibility Study - Lbj Child Care Center, Option 1 - Design Phase Services
- 12 Sep 2023
- Ae Services Feasibility Study - Lbj Child Care Center, Option 1 - Design Phase Services
- Pbs Ncr Capital Construction Ctr 1
- General Services Administration (Gsa)
- $660,179.78
- General Services Administration (Gsa)
- 47PM0122F0014
- A/E Feasibility Study For The Department Of Education Lbj Child Care Center
- 28 Jun 2022
- A/E Feasibility Study For The Department Of Education Lbj Child Care Center
- Pbs Ncr Capital Construction Ctr 1
- General Services Administration (Gsa)
- $192,198.27
- General Services Administration (Gsa)
- 47PM0122F0014
- To Extended The Contract Completion Date Ending On 01/31/2025.
- 3 Jan 2024
- To Extended The Contract Completion Date Ending On 01/31/2025.
- Pbs R11 Construction Services Divsion Center 1
- General Services Administration (Gsa)
- $660,179.78
- General Services Administration (Gsa)