Micro Craft Inc
CAGE Code: 5A517
NCAGE Code: 5A517
Status: Active
Type: Manufacturer
Dun & Bradstreet (DUNS): 826534286
Summary
Micro Craft Inc is an Active Manufacturer with the Cage Code 5A517 and is tracked by Dun & Bradstreet under DUNS Number 826534286..
Address
207 Big Springs Ave
Tullahoma TN 37388-3390
United States
Points of Contact
Related Information
People who viewed this 'CAGE Code' also viewed...
Jacobs Technology Inc. Arnold Lakeside Club Amazon Finance Llc University Of Tennessee Dale Sports Co Div Of Pdk Inc Aerospace Center Support Kc Co Inc E C Knox Washingtons Innovative Technologies Micro Craft Technology A Joint Tennessee Apparel Corp Tennessee Apparel Corp Olg Services, Llc Systems Integration/Modeling & Tennessee Apparel Corp Bryan Oil Inc Worth Inc. Barton, Karen Rmg Inc Tullahoma Industries, Llc
Frequently Asked Questions (FAQ) for CAGE 5A517
- What is CAGE Code 5A517?
- 5A517 is the unique identifier used by NATO Organizations to reference the physical entity known as Micro Craft Inc located at 207 Big Springs Ave, Tullahoma TN 37388-3390, United States.
- Who is CAGE Code 5A517?
- 5A517 refers to Micro Craft Inc located at 207 Big Springs Ave, Tullahoma TN 37388-3390, United States.
- Where is CAGE Code 5A517 Located?
- CAGE Code 5A517 is located in Tullahoma, TN, USA.
- How Many NSNs Does CAGE Code 5A517 Supply?
- CAGE Code 5A517 has been assigned as an approved source for 1 NSNs (National Stock Numbers and NATO Stock Numbers).
Contracting History for CAGE 5A517 Most Recent 25 Records
- FA910122PB025
- Design And Fabricate An Agard B/C Configuration Model For Pwt 4T And Vkf Tunnel A
- 30 Jun 2022
- Design And Fabricate An Agard B/C Configuration Model For Pwt 4T And Vkf Tunnel A
- Fa9101 Aedc Pkp Procrmnt Br
- Department Of Defense (Dod)
- $128,239.12
- Department Of Defense (Dod)
- 80LARC21F0071
- 30Ft Drop Tower Beams
- 2 Sep 2021
- 30Ft Drop Tower Beams
- Nasa Langley Research Center
- National Aeronautics And Space Administration (Nasa)
- $112,458.00
- National Aeronautics And Space Administration (Nasa)
- 80LARC21F0071
- 30Ft Drop Tower Beams
- 20 Jan 2021
- 30Ft Drop Tower Beams
- Nasa Langley Research Center
- National Aeronautics And Space Administration (Nasa)
- $112,458.00
- National Aeronautics And Space Administration (Nasa)
- 80LARC18FW001
- Aerospace Hardware For Exploration Mission To Moon And Mars Support) For Machining And Fabrication Efforts In Support Of Our Research And Development Programs. A Brief Description Of Requirements Are As Follows:Furnish All Personnel, Facilities, Services, Equipment, Supplies, Materials, And Transportation Must Meet Strict Research Schedules Work To Specifications Such As (But Not Limited To) Government-Furnished Drawings, Sketches, Or Written Narratives The Contractor Shall Conform To Various Nasa And Industry Standards/Codes As Specified In Task Orders. Such Standards/Codes Include (But Not Limited To) All Applicable Internal/External Langley Management System Documents. Perform Accurate Machining And Handwork For Precision Tolerances, Fits, And Finishes. Dimensional Tolerances Will Vary With Hardware And May Range From General (+/- .020 Inches, 125 Rms) To Tight (+/- .0001 Inches, 4 Rms) Constraints Depending On The Nature Of The Work Manufacture, Repair, Rework, Or Modify Research And Facility Hardware To Include, But Not Be Limited To; Structural Members And Assemblies Modification Of Aerospace And Aeronautical Models Two Hour Response Time On Urgent Delivery Orders Three Day Response (Or Less If Required) On Requests For Quotes General Fabrication And Precision Machining Quality Management System The Contractor Shall Inspect All Completed Tasks Prior To Delivery To The Government To Ensure Compliance With The Task Order And Specified Standard. The Contractor Shall Furnish A Final Inspection Report With Completed Tasks.
- 24 Oct 2017
- Aerospace Hardware For Exploration Mission To Moon And Mars Support) For Machining And Fabrication Efforts In Support Of Our Research And Development Programs. A Brief Description Of Requirements Are As Follows:Furnish All Personnel, Facilities, Services, Equipment, Supplies, Materials, And Transportation Must Meet Strict Research Schedules Work To Specifications Such As (But Not Limited To) Government-Furnished Drawings, Sketches, Or Written Narratives The Contractor Shall Conform To Various Nasa And Industry Standards/Codes As Specified In Task Orders. Such Standards/Codes Include (But Not Limited To) All Applicable Internal/External Langley Management System Documents. Perform Accurate Machining And Handwork For Precision Tolerances, Fits, And Finishes. Dimensional Tolerances Will Vary With Hardware And May Range From General (+/- .020 Inches, 125 Rms) To Tight (+/- .0001 Inches, 4 Rms) Constraints Depending On The Nature Of The Work Manufacture, Repair, Rework, Or Modify Research And Facility Hardware To Include, But Not Be Limited To; Structural Members And Assemblies Modification Of Aerospace And Aeronautical Models Two Hour Response Time On Urgent Delivery Orders Three Day Response (Or Less If Required) On Requests For Quotes General Fabrication And Precision Machining Quality Management System The Contractor Shall Inspect All Completed Tasks Prior To Delivery To The Government To Ensure Compliance With The Task Order And Specified Standard. The Contractor Shall Furnish A Final Inspection Report With Completed Tasks.
- Nasa Langley Research Center
- National Aeronautics And Space Administration (Nasa)
- $6,507.54
- National Aeronautics And Space Administration (Nasa)
- 80LARC19FW070
- Commercial Hardware And Credit Card Charge
- 9 Aug 2019
- Commercial Hardware And Credit Card Charge
- Nasa Langley Research Center
- National Aeronautics And Space Administration (Nasa)
- $45,464.46
- National Aeronautics And Space Administration (Nasa)
- 80NSSC19P1883
- Manufacture Of Test Hardware
- 20 Aug 2019
- Manufacture Of Test Hardware
- Nasa Shared Services Center
- National Aeronautics And Space Administration (Nasa)
- $43,675.41
- National Aeronautics And Space Administration (Nasa)
- 80LARC18FW040
- Commercial Hardwareand Credit Card Fee - Electronics Circuitry
- 12 Mar 2018
- Commercial Hardwareand Credit Card Fee - Electronics Circuitry
- Nasa Langley Research Center
- National Aeronautics And Space Administration (Nasa)
- $29,360.15
- National Aeronautics And Space Administration (Nasa)
- 80LARC18FW044
- Forward Rings
- 20 Apr 2018
- Forward Rings
- Nasa Langley Research Center
- National Aeronautics And Space Administration (Nasa)
- $89,106.33
- National Aeronautics And Space Administration (Nasa)
- 80LARC18D0008
- The Reliance Consolidated Models V (Recom V) Effort Is A Consolidation Of Design And/Or Fabrication Of Aerospace Model Systems And Developmental Test Hardware Used For Spaceflight, Flight, Spaceflight Development, And Ground-Based Tests Supporting
- 15 Sep 2020
- The Reliance Consolidated Models V (Recom V) Effort Is A Consolidation Of Design And/Or Fabrication Of Aerospace Model Systems And Developmental Test Hardware Used For Spaceflight, Flight, Spaceflight Development, And Ground-Based Tests Supporting
- Nasa Langley Research Center
- National Aeronautics And Space Administration (Nasa)
- $0.00
- National Aeronautics And Space Administration (Nasa)
- 80LARC17FW039
- Strongback, Labyrinth Seal, Labyrinth Shim
- 8 Sep 2017
- Strongback, Labyrinth Seal, Labyrinth Shim
- Nasa Langley Research Center
- National Aeronautics And Space Administration (Nasa)
- $98,933.00
- National Aeronautics And Space Administration (Nasa)
- 80LARC17F0004
- Igf::Ot::Igf Brackets&Interface Closeouts
- 27 Jun 2017
- Igf::Ot::Igf Brackets&Interface Closeouts
- Nasa Langley Research Center
- National Aeronautics And Space Administration (Nasa)
- $0.00
- National Aeronautics And Space Administration (Nasa)
- NNL17AA07D
- "Igf::Ot::Igf"Title: Design And Fabrication Of The Ground Wind Loads Model The Contractor Shall Complete The Design, Analysis, And Fabrication Of The Wind Loads Model-Aeroelastic Research Model (Gwl-Arm). The Contractor Shall Design The Model To Be Pedestal Mounted. The Mounting Pedestal Is Considered Part Of The Model And Will Be Designed, Analyzed, And Fabricated By The Contractor. The Contractors Design Of The Launch Vehicle Portion Of The Model Shall Include Protuberances For Each Of The Two Configurations, Cargo And Capsule. Some Protuberances May Be Used For Both Configurations. The Contractor Shall Design The Model With Provisions For Thirty-Two (32) Unsteady Pressure Transducers For Each Configuration. The Contractor Shall Design The Model To Allow For Testing Of Two Primary Configurations, Cargo And Capsule. Approximately Eighty-Five (85) Percent (Lower Portion) Of The Model Structure Will Be Common For The Two Configurations. The Upper Approximately Fifteen (15) Percent Of The Model With Be Unique To Each Configuration. A Joint Will Be Design At This Point To Allow Relatively Easy Changes Between The Two Configurations. The Model Will Have A Length (Geometric) Scale Of Six (6)-Percent Of Full-Scale.
- 8 Jun 2017
- "Igf::Ot::Igf"Title: Design And Fabrication Of The Ground Wind Loads Model The Contractor Shall Complete The Design, Analysis, And Fabrication Of The Wind Loads Model-Aeroelastic Research Model (Gwl-Arm). The Contractor Shall Design The Model To Be Pedestal Mounted. The Mounting Pedestal Is Considered Part Of The Model And Will Be Designed, Analyzed, And Fabricated By The Contractor. The Contractors Design Of The Launch Vehicle Portion Of The Model Shall Include Protuberances For Each Of The Two Configurations, Cargo And Capsule. Some Protuberances May Be Used For Both Configurations. The Contractor Shall Design The Model With Provisions For Thirty-Two (32) Unsteady Pressure Transducers For Each Configuration. The Contractor Shall Design The Model To Allow For Testing Of Two Primary Configurations, Cargo And Capsule. Approximately Eighty-Five (85) Percent (Lower Portion) Of The Model Structure Will Be Common For The Two Configurations. The Upper Approximately Fifteen (15) Percent Of The Model With Be Unique To Each Configuration. A Joint Will Be Design At This Point To Allow Relatively Easy Changes Between The Two Configurations. The Model Will Have A Length (Geometric) Scale Of Six (6)-Percent Of Full-Scale.
- Nasa Langley Research Center
- National Aeronautics And Space Administration (Nasa)
- $325,897.00
- National Aeronautics And Space Administration (Nasa)
- 80NSSC23PC148
- A Volute Assembly For The Waterflow Facility Manufactured
- 14 Aug 2023
- A Volute Assembly For The Waterflow Facility Manufactured
- Nasa Shared Services Center
- National Aeronautics And Space Administration (Nasa)
- $123,868.89
- National Aeronautics And Space Administration (Nasa)
- 80LARC18D0008
- The Reliance Consolidated Models V (Recom V) Effort Is A Consolidation Of Design And/Or Fabrication Of Aerospace Model Systems And Developmental Test Hardware Used For Spaceflight, Flight, Spaceflight Development, And Ground-Based Tests Supporting Nasa Langley Research Center (Larc). This Contract May Be Used To Support Other Nasa Centers That Require Work Within The Scope Of The Recom V Performance Work Statement (Pws). Market Research Was Conducted In Order To Determine The Level Of Existing Small Business Capabilities. A Sources-Sought Synopsis Was Issued On January 19, 2018 Seeking Capability Statements From Potential Sources Under North American Industrial Classification System (Naics) 541715, Research And Development In Physical, Engineering, And Life Sciences With A Size Standard Of 1,500 Employees. Based On The Responses Received, The Contracting Officer, With The Concurrence Of The Small Business Specialist, Determined That An Adequate Number Of Small Business Concerns Existed To Allow The Larc Procurement To Be Conducted As A Total Small Business Set Aside. The Recom V Procurement Was Solicited As A Multiple-Award Indefinite Delivery, Indefinite Quantity (Idiq) Effort With A 5-Year Period Of Performance. The Government Intended To Award Up To Four (4) Contracts As A Result Of The Solicitation However, Reserved The Right To Award More Or Less For Offeror(S) Determined By The Ssa To Represent The Best Value To The Government. Delivery Orders Issued Against Awarded Contracts Will Be Awarded On A Firm-Fixed Price (Ffp) Or Cost-Plus-Fixed Fee (Cpff) Basis. The Government Will Order Through The Issuance Of Delivery Orders A Minimum Quantity Of Work Of $25,000 Per Contract Under This Contract. The Total Maximum Cumulative Value Of The Indefinite Delivery/Indefinite Quantity (Idiq) Contracts Is $9.5M.
- 4 Aug 2021
- The Reliance Consolidated Models V (Recom V) Effort Is A Consolidation Of Design And/Or Fabrication Of Aerospace Model Systems And Developmental Test Hardware Used For Spaceflight, Flight, Spaceflight Development, And Ground-Based Tests Supporting Nasa Langley Research Center (Larc). This Contract May Be Used To Support Other Nasa Centers That Require Work Within The Scope Of The Recom V Performance Work Statement (Pws). Market Research Was Conducted In Order To Determine The Level Of Existing Small Business Capabilities. A Sources-Sought Synopsis Was Issued On January 19, 2018 Seeking Capability Statements From Potential Sources Under North American Industrial Classification System (Naics) 541715, Research And Development In Physical, Engineering, And Life Sciences With A Size Standard Of 1,500 Employees. Based On The Responses Received, The Contracting Officer, With The Concurrence Of The Small Business Specialist, Determined That An Adequate Number Of Small Business Concerns Existed To Allow The Larc Procurement To Be Conducted As A Total Small Business Set Aside. The Recom V Procurement Was Solicited As A Multiple-Award Indefinite Delivery, Indefinite Quantity (Idiq) Effort With A 5-Year Period Of Performance. The Government Intended To Award Up To Four (4) Contracts As A Result Of The Solicitation However, Reserved The Right To Award More Or Less For Offeror(S) Determined By The Ssa To Represent The Best Value To The Government. Delivery Orders Issued Against Awarded Contracts Will Be Awarded On A Firm-Fixed Price (Ffp) Or Cost-Plus-Fixed Fee (Cpff) Basis. The Government Will Order Through The Issuance Of Delivery Orders A Minimum Quantity Of Work Of $25,000 Per Contract Under This Contract. The Total Maximum Cumulative Value Of The Indefinite Delivery/Indefinite Quantity (Idiq) Contracts Is $9.5M.
- Nasa Langley Research Center
- National Aeronautics And Space Administration (Nasa)
- $0.00
- National Aeronautics And Space Administration (Nasa)
- 80LARC18F0198
- This Is A Dummy Delivery Order For $25,000 Used As A Place Holder Until First Order Is Placed.
- 26 Sep 2018
- This Is A Dummy Delivery Order For $25,000 Used As A Place Holder Until First Order Is Placed.
- Nasa Langley Research Center
- National Aeronautics And Space Administration (Nasa)
- $25,000.00
- National Aeronautics And Space Administration (Nasa)
- NNL16AA15Z
- Blanket Purchase Agreement For General And Precision Machining. Nasa/Langley Is Issuing This Sources Sought Synopsis To Determine The Potential Of Small Businesses Capable Of Meeting Nasa/Langleys Requirements (I.E. Aerospace Hardware For Exploration
- 11 Sep 2020
- Blanket Purchase Agreement For General And Precision Machining. Nasa/Langley Is Issuing This Sources Sought Synopsis To Determine The Potential Of Small Businesses Capable Of Meeting Nasa/Langleys Requirements (I.E. Aerospace Hardware For Exploration
- Nasa Langley Research Center
- National Aeronautics And Space Administration (Nasa)
- $0.00
- National Aeronautics And Space Administration (Nasa)
- 80LARC20FW097
- Inflation System Power Supply (Isps) Enclosure Components For The Low Earth Orbit Flight Test Of An Inflatable Detector (Loftid) Project
- 5 Mar 2020
- Inflation System Power Supply (Isps) Enclosure Components For The Low Earth Orbit Flight Test Of An Inflatable Detector (Loftid) Project
- Nasa Langley Research Center
- National Aeronautics And Space Administration (Nasa)
- $10,904.61
- National Aeronautics And Space Administration (Nasa)
- 80NSSC19P1883
- Manufacture Of Test Hardware
- 2 Dec 2019
- Manufacture Of Test Hardware
- Nasa Shared Services Center
- National Aeronautics And Space Administration (Nasa)
- $43,675.41
- National Aeronautics And Space Administration (Nasa)
- 80LARC18FW056
- Drawing And Credit Card Fee
- 3 May 2018
- Drawing And Credit Card Fee
- Nasa Langley Research Center
- National Aeronautics And Space Administration (Nasa)
- $35,712.16
- National Aeronautics And Space Administration (Nasa)
- 80LARC17F0004
- Igf::Ot::Igf Brackets&Interface Closeouts
- 28 Jul 2017
- Igf::Ot::Igf Brackets&Interface Closeouts
- Nasa Langley Research Center
- National Aeronautics And Space Administration (Nasa)
- $0.00
- National Aeronautics And Space Administration (Nasa)
- 80LARC19FW022
- Hardware And Inspections, Credit Card Fees
- 12 Apr 2019
- Hardware And Inspections, Credit Card Fees
- Nasa Langley Research Center
- National Aeronautics And Space Administration (Nasa)
- $47,757.80
- National Aeronautics And Space Administration (Nasa)
- 80LARC20FW039
- Metals, Plates, Sheets, Strips, Foils, And/Or Wires
- 20 Nov 2019
- Metals, Plates, Sheets, Strips, Foils, And/Or Wires
- Nasa Langley Research Center
- National Aeronautics And Space Administration (Nasa)
- $17,233.96
- National Aeronautics And Space Administration (Nasa)
- 80LARC20FW111
- Hardware Fabrication For Strut Tooling
- 30 Sep 2020
- Hardware Fabrication For Strut Tooling
- Nasa Langley Research Center
- National Aeronautics And Space Administration (Nasa)
- $10,441.00
- National Aeronautics And Space Administration (Nasa)
- 80LARC20FW012
- Telescope Mount Bracket
- 21 Oct 2019
- Telescope Mount Bracket
- Nasa Langley Research Center
- National Aeronautics And Space Administration (Nasa)
- $7,764.00
- National Aeronautics And Space Administration (Nasa)
- 80LARC21F0032
- Mach Subassembly Components
- 30 Nov 2020
- Mach Subassembly Components
- Nasa Langley Research Center
- National Aeronautics And Space Administration (Nasa)
- $9,990.00
- National Aeronautics And Space Administration (Nasa)
Supply Items Approved for CAGE 5A517 Page 1 of 1
- 4E19020-101A
- RNCC: 5 | RNVC: 2 | DAC: 5