Valdez Construction Inc
CAGE Code: 57RJ6
NCAGE Code: 57RJ6
Status: Active
Type: Commercial Supplier
Dun & Bradstreet (DUNS): 779975643
Summary
Valdez Construction Inc is an Active Commercial Supplier with the Cage Code 57RJ6 and is tracked by Dun & Bradstreet under DUNS Number 779975643..
Address
499 Ne Midway Blvd
Ste 2
Oak Harbor WA 98277-2615
United States
Points of Contact
Related Information
People who viewed this 'CAGE Code' also viewed...
Quality Landscaping Aire-Tech Enterprises Div Of Copper Kettle Diving Supply Inc Pony Mailing & Business Center Slaughter Diana Marie Ncw Respiratory Care Inc Island Construction Inc. Oak Harbor Ace Hardware Jims Refrigeration C And S Cleaning Photo Mill Inc Rad-Ware Nicolo Bruno Ayling And Reichert Company Carpet Specialists Industrial Power Splicing North Sound Painters Trouble Shooters Inc Carroll & Company Z-Go Sign Co
Frequently Asked Questions (FAQ) for CAGE 57RJ6
- What is CAGE Code 57RJ6?
- 57RJ6 is the unique identifier used by NATO Organizations to reference the physical entity known as Valdez Construction Inc located at 499 Ne Midway Blvd, Ste 2, Oak Harbor WA 98277-2615, United States.
- Who is CAGE Code 57RJ6?
- 57RJ6 refers to Valdez Construction Inc located at 499 Ne Midway Blvd, Ste 2, Oak Harbor WA 98277-2615, United States.
- Where is CAGE Code 57RJ6 Located?
- CAGE Code 57RJ6 is located in Oak Harbor, WA, USA.
Contracting History for CAGE 57RJ6 Most Recent 25 Records
- N4425520F4102
- Repair&Improve Jim Creek Wheeler Mtn. Drainage System
- 20 May 2020
- Repair&Improve Jim Creek Wheeler Mtn. Drainage System
- Navfac Northwest
- Department Of Defense (Dod)
- $284,706.04
- Department Of Defense (Dod)
- N4425518C7003
- Removal Of Existing Equipment
- 28 Sep 2018
- Removal Of Existing Equipment
- Navfac Northwest
- Department Of Defense (Dod)
- $227,040.79
- Department Of Defense (Dod)
- N4425518F4447
- Renovations For Port Ops, Building 2110, Nse
- 19 Aug 2020
- Renovations For Port Ops, Building 2110, Nse
- Navfac Northwest
- Department Of Defense (Dod)
- $795,919.00
- Department Of Defense (Dod)
- N4425518F4447
- Igf::Ot::Igf X007 Renovations For Port Ops, Building 2110, Nse
- 21 Sep 2018
- Igf::Ot::Igf X007 Renovations For Port Ops, Building 2110, Nse
- Navfac Northwest
- Department Of Defense (Dod)
- $795,919.00
- Department Of Defense (Dod)
- 140P8319P0008
- Design-Build Contract To Replace On-Site Sewage System (Oss) At Heart O' The Hills Campground, Olympic Np. Modification #3 Adds Custom-Built Control Panel And Extends The Performance Period Due To Production Lead-Time.
- 3 Sep 2019
- Design-Build Contract To Replace On-Site Sewage System (Oss) At Heart O' The Hills Campground, Olympic Np. Modification #3 Adds Custom-Built Control Panel And Extends The Performance Period Due To Production Lead-Time.
- Pwr Olym Mabo(83000)
- Department Of The Interior (Doi)
- $227,238.88
- Department Of The Interior (Doi)
- N4425519F4058
- Igf::Ot::Igf X011 Replace Culvert W-172 With Fish Passage Culvert P00001 - Correct Vendor Address
- 15 Jan 2019
- Igf::Ot::Igf X011 Replace Culvert W-172 With Fish Passage Culvert P00001 - Correct Vendor Address
- Navfac Northwest
- Department Of Defense (Dod)
- $94,260.79
- Department Of Defense (Dod)
- 0009
- Igf::Ot::Igf Task Order To Provide Perimeter Security Fence Repairs, Nosc Portland, Oregon.
- 8 May 2017
- Igf::Ot::Igf Task Order To Provide Perimeter Security Fence Repairs, Nosc Portland, Oregon.
- Navfac Northwest
- Department Of Defense (Dod)
- $372,760.11
- Department Of Defense (Dod)
- N4425519F4058
- P000002 - Replace Culvert W-172 With Fish Passage Culvert
- 1 Apr 2020
- P000002 - Replace Culvert W-172 With Fish Passage Culvert
- Navfac Northwest
- Department Of Defense (Dod)
- $256,699.12
- Department Of Defense (Dod)
- 47PL0118P0033
- Lpoe Field Office Buildout, Blaine, Wa - Mod To Add Flooring As A Result Of A Differing Site Condition Discovered During Demo.
- 9 Jul 2018
- Lpoe Field Office Buildout, Blaine, Wa - Mod To Add Flooring As A Result Of A Differing Site Condition Discovered During Demo.
- Pbs R10
- General Services Administration (Gsa)
- $55,766.17
- General Services Administration (Gsa)
- 47PL0118F0039
- See Attached Sf 30 Continuation Sheet - Supplemental Work To Clin 0002 And Clin 0003
- 3 Oct 2018
- See Attached Sf 30 Continuation Sheet - Supplemental Work To Clin 0002 And Clin 0003
- Pbs R10
- General Services Administration (Gsa)
- $710,213.88
- General Services Administration (Gsa)
- INP17PC00416
- Igf::Ot::Igf Modify/Rehabilitate Waste Water System And Drain Field At Hoh Rainforest Campground, Olympic Np, Jefferson County. Sole Source Award Pursuant To Small Business Administration 8(A) Business Development Program.
- 22 Aug 2017
- Igf::Ot::Igf Modify/Rehabilitate Waste Water System And Drain Field At Hoh Rainforest Campground, Olympic Np, Jefferson County. Sole Source Award Pursuant To Small Business Administration 8(A) Business Development Program.
- Pwr Olym Mabo(83000)
- Department Of The Interior (Doi)
- $812,856.72
- Department Of The Interior (Doi)
- N4425517C2001
- Igf::Ot::Igf Renovation Of B100, 108, And 2739
- 11 Aug 2017
- Igf::Ot::Igf Renovation Of B100, 108, And 2739
- Navfac Northwest
- Department Of Defense (Dod)
- $1,430,212.63
- Department Of Defense (Dod)
- 47PL0118F0039
- Supplemental Work To Add A Vinyl Mural To The Fda Bothell Lunchroom As Proposed During Design Phase. The Fda Determined During Renovation They Would Like To Add The Design To The Space. Additional Work In Restroom To Provide Privacy Strips On Partitions And Repair Damaged Drywall Found In The Upstairs Kitchenette.
- 15 Nov 2018
- Supplemental Work To Add A Vinyl Mural To The Fda Bothell Lunchroom As Proposed During Design Phase. The Fda Determined During Renovation They Would Like To Add The Design To The Space. Additional Work In Restroom To Provide Privacy Strips On Partitions And Repair Damaged Drywall Found In The Upstairs Kitchenette.
- Pbs R10
- General Services Administration (Gsa)
- $718,406.22
- General Services Administration (Gsa)
- 140P8319P0008
- Design-Build Contract To Replace On-Site Sewage System (Oss) At Heart O' The Hills Campground, Olympic Np. Modification #4 Implements Response To Differing Site Conditions.
- 17 Sep 2019
- Design-Build Contract To Replace On-Site Sewage System (Oss) At Heart O' The Hills Campground, Olympic Np. Modification #4 Implements Response To Differing Site Conditions.
- Pwr Olym Mabo(83000)
- Department Of The Interior (Doi)
- $242,055.10
- Department Of The Interior (Doi)
- 140P8319P0008
- Design-Build Contract To Replace On-Site Sewage System (Oss) At Heart O' The Hills Campground, Olympic Np. Modification Exercises Options B And C To Verify Force Main Location And Expand Drainfield.
- 2 May 2019
- Design-Build Contract To Replace On-Site Sewage System (Oss) At Heart O' The Hills Campground, Olympic Np. Modification Exercises Options B And C To Verify Force Main Location And Expand Drainfield.
- Pwr Olym Mabo(83000)
- Department Of The Interior (Doi)
- $209,948.53
- Department Of The Interior (Doi)
- 140P8318C0010
- Replace Wastewater Lift Stations At Campground. Modification #2 Implements Minor Changes To The Contract Requirements And Moves The Final Construction Phase To Autumn 2019.
- 28 Jun 2019
- Replace Wastewater Lift Stations At Campground. Modification #2 Implements Minor Changes To The Contract Requirements And Moves The Final Construction Phase To Autumn 2019.
- Pwr Olym Mabo(83000)
- Department Of The Interior (Doi)
- $1,479,046.70
- Department Of The Interior (Doi)
- GS10P16LTD7001
- Igf::Ot::Igf Fda Idiq Exercise Option Year 1 - Six Months. Location: Bothell, Wa.
- 20 Jun 2018
- Igf::Ot::Igf Fda Idiq Exercise Option Year 1 - Six Months. Location: Bothell, Wa.
- Pbs R10
- General Services Administration (Gsa)
- $0.00
- General Services Administration (Gsa)
- 140P8318C0010
- Replace Wastewater Lift Stations At Ohanapecosh Campground (Loops A And F), Mount Rainier National Park, Washington.
- 25 Jul 2018
- Replace Wastewater Lift Stations At Ohanapecosh Campground (Loops A And F), Mount Rainier National Park, Washington.
- Pwr Olym Mabo(83000)
- Department Of The Interior (Doi)
- $1,479,046.70
- Department Of The Interior (Doi)
- N4425520F4277
- Nosc Portland - Replace Damaged Security Fencing
- 21 Aug 2020
- Nosc Portland - Replace Damaged Security Fencing
- Navfac Northwest
- Department Of Defense (Dod)
- $12,000.00
- Department Of Defense (Dod)
- 47PL0118P0033
- Igf::Ot::Igf Lpoe Field Office Buildout, Blaine, Wa
- 14 Jun 2018
- Igf::Ot::Igf Lpoe Field Office Buildout, Blaine, Wa
- Pbs R10
- General Services Administration (Gsa)
- $78,415.21
- General Services Administration (Gsa)
- N4425516C0002
- Igf::Ot::Igf Mod To Add Concrete Fire Stops Due To Design Deficiency
- 3 Feb 2017
- Igf::Ot::Igf Mod To Add Concrete Fire Stops Due To Design Deficiency
- Navfac Northwest
- Department Of Defense (Dod)
- $841,243.07
- Department Of Defense (Dod)
- 47PL0118F0039
- Igf::Ot::Igf ; The Purpose Of This Project Is To Remodel And Refresh Restrooms And Lunchroom/Locker Rooms Located At Fda Bothell, Bothell, Wa. 98021
- 19 Mar 2018
- Igf::Ot::Igf ; The Purpose Of This Project Is To Remodel And Refresh Restrooms And Lunchroom/Locker Rooms Located At Fda Bothell, Bothell, Wa. 98021
- Pbs R10
- General Services Administration (Gsa)
- $718,406.22
- General Services Administration (Gsa)
- N4425517C2001
- Mod For Design Deficiencies Found By Fire Inspector, I.E. External Stairs For Fire Exit, Lit Exit Signs.
- 6 Feb 2018
- Mod For Design Deficiencies Found By Fire Inspector, I.E. External Stairs For Fire Exit, Lit Exit Signs.
- Navfac Northwest
- Department Of Defense (Dod)
- $1,430,212.63
- Department Of Defense (Dod)
- N4425518C7000
- Fy18/ Airfield Repairs
- 14 Aug 2018
- Fy18/ Airfield Repairs
- Navfac Northwest
- Department Of Defense (Dod)
- $801,318.88
- Department Of Defense (Dod)
- N4425519F4445
- Demo Ramp&Install Steps On North Side Of Medical, B2010
- 19 Sep 2019
- Demo Ramp&Install Steps On North Side Of Medical, B2010
- Navfac Northwest
- Department Of Defense (Dod)
- $56,377.30
- Department Of Defense (Dod)