Rap Engineering, Inc.
Dba Rap Engineering Inc
CAGE Code: 56G54
NCAGE Code: 56G54
Status: Active
Type: Commercial Supplier
Dun & Bradstreet (DUNS): 828116108
Summary
Rap Engineering, Inc., Dba Rap Engineering Inc is an Active Commercial Supplier with the Cage Code 56G54 and is tracked by Dun & Bradstreet under DUNS Number 828116108..
Address
503 E Mission Rd
San Marcos CA 92069-1824
United States
Points of Contact
No Points of Contact...
Related Information
People who viewed this 'CAGE Code' also viewed...
Dynamic Solutions Systems, Inc. Trinity Products One-Hour Quality Photo And Custom Excel Commercial Constructors Inc Inter-Block Retaining System Inc P P B Distributors North County Supply, Inc Palomar Pen & Office Supply Doc Micro Services Elude Gear Clear Sign & Design Inc. S And S Dayton Supply Benson Collaborative Perpetual Communication Peripherals Zemarc Corp San Marcos Br Ochs Clarence Inc Dba Ochs Oil Staysail Systems, Inc. G.R. Incorporated Trip Enterprises Inc Cline Uniforms And Design
Frequently Asked Questions (FAQ) for CAGE 56G54
- What is CAGE Code 56G54?
- 56G54 is the unique identifier used by NATO Organizations to reference the physical entity known as Rap Engineering, Inc. Dba Rap Engineering Inc located at 503 E Mission Rd, San Marcos CA 92069-1824, United States.
- Who is CAGE Code 56G54?
- 56G54 refers to Rap Engineering, Inc. Dba Rap Engineering Inc located at 503 E Mission Rd, San Marcos CA 92069-1824, United States.
- Where is CAGE Code 56G54 Located?
- CAGE Code 56G54 is located in San Marcos, CA, USA.
Contracting History for CAGE 56G54 Most Recent 25 Records
- 47PK0920C0017
- Provide All Labor, Supervision, Materials, And Equipment Necessary For Sound Proofing Of Offices 55&57 For Usa Located At 880 Front Street, San Diego, Ca 92101
- 30 Jul 2020
- Provide All Labor, Supervision, Materials, And Equipment Necessary For Sound Proofing Of Offices 55&57 For Usa Located At 880 Front Street, San Diego, Ca 92101
- Pbs R9
- General Services Administration (Gsa)
- $19,339.00
- General Services Administration (Gsa)
- 47PK0919C0011
- Modification To Increase Delivery Order From $50,293.00 To $61,966.00, An Increase Of $11,673.00. Increase Is To Cover Additional Work Requested To Remodel Adjacent Hallway Which Was Also Suffered Damage From The Flood. Project Period Of Period Of Performance In Extended From 06/03/2019 To 06/17/2019, To Allow Additional Time To Complete Additional Work.
- 30 May 2019
- Modification To Increase Delivery Order From $50,293.00 To $61,966.00, An Increase Of $11,673.00. Increase Is To Cover Additional Work Requested To Remodel Adjacent Hallway Which Was Also Suffered Damage From The Flood. Project Period Of Period Of Performance In Extended From 06/03/2019 To 06/17/2019, To Allow Additional Time To Complete Additional Work.
- Pbs R9
- General Services Administration (Gsa)
- $61,966.00
- General Services Administration (Gsa)
- 47PK1719C0003
- This Modification Is For Additional In-Scope Work For The Removal Of Acm From Juror Restrooms 2D, 3D,&4D. The Attached 1137 And The Design For Health Training Center Document Asbestos And Lead Sample Collection Are Hereby Attached And Incorporated Into This Contract. This Contract Is Hereby Increased From $343,186 By $15,975 To $359,161. All Other Terms And Conditions Remain Unchanged.
- 30 Apr 2019
- This Modification Is For Additional In-Scope Work For The Removal Of Acm From Juror Restrooms 2D, 3D,&4D. The Attached 1137 And The Design For Health Training Center Document Asbestos And Lead Sample Collection Are Hereby Attached And Incorporated Into This Contract. This Contract Is Hereby Increased From $343,186 By $15,975 To $359,161. All Other Terms And Conditions Remain Unchanged.
- Pbs R9 - Los Angeles Service Center
- General Services Administration (Gsa)
- $359,161.00
- General Services Administration (Gsa)
- 47PK0920C0008
- See Sustainability Clause
- 9 Mar 2020
- See Sustainability Clause
- Pbs R9
- General Services Administration (Gsa)
- $25,989.00
- General Services Administration (Gsa)
- 47PK1719C0003
- Igf::Ot::Igf
- 19 Dec 2018
- Igf::Ot::Igf
- Pbs R9 - Los Angeles Service Center
- General Services Administration (Gsa)
- $370,261.00
- General Services Administration (Gsa)
- 47PK0918C0014
- Igf::Ot::Igf Build Out A Conference Room On The 2Nd Floor Of The Schwartz U.S. Courthouse
- 23 Feb 2018
- Igf::Ot::Igf Build Out A Conference Room On The 2Nd Floor Of The Schwartz U.S. Courthouse
- Pbs R9
- General Services Administration (Gsa)
- $44,542.00
- General Services Administration (Gsa)
- 47PK0921C0008
- Refresh The Existing Staff Restrooms Located Off The Secure Judicial Corridors On The Second, Third, And Fourth Floors Of The Edward J. Schwartz Courthouse Located At 221 West Broadway, San Diego, Ca 92101.
- 19 Nov 2020
- Refresh The Existing Staff Restrooms Located Off The Secure Judicial Corridors On The Second, Third, And Fourth Floors Of The Edward J. Schwartz Courthouse Located At 221 West Broadway, San Diego, Ca 92101.
- Pbs R9
- General Services Administration (Gsa)
- $122,971.00
- General Services Administration (Gsa)
- 70B06C20C00000137
- Hinge Replacement
- 18 Sep 2020
- Hinge Replacement
- Mission Support Ctr Div
- Department Of Homeland Security (Dhs)
- $29,734.00
- Department Of Homeland Security (Dhs)
- 47PK1719C0003
- The Purpose Of This Administrative Modification Is To Add Back The Correct Pr Funding For This Contract. This Modification Follows Pa01 Which Had Removed The Incorrect Pr Funding. Together, Pa01 And Pa02 Have Corrected A System Mistake. No Changes To The Terms And Conditions Of This Contract Have Been Made. The Contract Total Remains $343,186.00.
- 15 Jan 2019
- The Purpose Of This Administrative Modification Is To Add Back The Correct Pr Funding For This Contract. This Modification Follows Pa01 Which Had Removed The Incorrect Pr Funding. Together, Pa01 And Pa02 Have Corrected A System Mistake. No Changes To The Terms And Conditions Of This Contract Have Been Made. The Contract Total Remains $343,186.00.
- Pbs R9 - Los Angeles Service Center
- General Services Administration (Gsa)
- $343,186.00
- General Services Administration (Gsa)
- 47PK0918C0005
- Modification To Reduce Delivery Order From $15,644.00 Down To 7,822.00, A Reduction Of $7,822.00. Line 0002 Is Deleted, To Remove Pg54 Funding.
- 27 Sep 2018
- Modification To Reduce Delivery Order From $15,644.00 Down To 7,822.00, A Reduction Of $7,822.00. Line 0002 Is Deleted, To Remove Pg54 Funding.
- Pbs R9
- General Services Administration (Gsa)
- $7,822.00
- General Services Administration (Gsa)
- 47PK1719C0003
- The Purpose Of This Administrative Modification Is To De-Obligate Funding From An Incorrect Pr Which Was Attached In Error. A Subsequent Modification Will Re-Add The Same Amount Of Funding From The Correct Pr.
- 11 Jan 2019
- The Purpose Of This Administrative Modification Is To De-Obligate Funding From An Incorrect Pr Which Was Attached In Error. A Subsequent Modification Will Re-Add The Same Amount Of Funding From The Correct Pr.
- Pbs R9 - Los Angeles Service Center
- General Services Administration (Gsa)
- $0.00
- General Services Administration (Gsa)
- 47PK1719C0003
- Courtroom Refurbishment
- 19 Dec 2019
- Courtroom Refurbishment
- Pbs R9 - Los Angeles Service Center
- General Services Administration (Gsa)
- $370,261.00
- General Services Administration (Gsa)
- 47PK0719P0004
- The Purpose Of This Modification Is To Add Additional Work Per The Project Manager. The Award Is Being Increased And The Completion Dates Are Being Extended.
- 11 Mar 2020
- The Purpose Of This Modification Is To Add Additional Work Per The Project Manager. The Award Is Being Increased And The Completion Dates Are Being Extended.
- Pbs R9 Las Vegas Field Office
- General Services Administration (Gsa)
- $222,381.05
- General Services Administration (Gsa)
- 47PK0918C0005
- Administration Modification To Change Funding Source. Program Ba61 Funds To Be Used For Work. Line Item 0002 Added To Reflect Funds Available From Ba61. Delivery Order Is Increased From $7,822.00 To $15,644.00, And Increase Of $7,822.00 To Facilitate A Cost Transfer From Ba54 To Ba61.
- 25 Sep 2018
- Administration Modification To Change Funding Source. Program Ba61 Funds To Be Used For Work. Line Item 0002 Added To Reflect Funds Available From Ba61. Delivery Order Is Increased From $7,822.00 To $15,644.00, And Increase Of $7,822.00 To Facilitate A Cost Transfer From Ba54 To Ba61.
- Pbs R9
- General Services Administration (Gsa)
- $15,644.00
- General Services Administration (Gsa)
- 47PK0519C0005
- Addition Of Clauses Pertaining To The Prohibition On Contracting For Certain Telecommunications And Video Surveillance Services Or Equipment.
- 21 Jan 2020
- Addition Of Clauses Pertaining To The Prohibition On Contracting For Certain Telecommunications And Video Surveillance Services Or Equipment.
- Pbs R9 - San Diego Service Center
- General Services Administration (Gsa)
- $190,045.00
- General Services Administration (Gsa)
- 47PK0920C0002
- 889 Mod
- 22 Apr 2020
- 889 Mod
- Pbs R9
- General Services Administration (Gsa)
- $41,527.00
- General Services Administration (Gsa)
- 47PK0918C0011
- Igf::Ot::Igf Contractor To Provide All Labor, Materials, Management, Supervision And Support Services To Provide Power And Low Voltage Infrastructure In 22 Jury Deliberation Rooms.
- 8 Feb 2018
- Igf::Ot::Igf Contractor To Provide All Labor, Materials, Management, Supervision And Support Services To Provide Power And Low Voltage Infrastructure In 22 Jury Deliberation Rooms.
- Pbs R9
- General Services Administration (Gsa)
- $102,202.00
- General Services Administration (Gsa)
- 47PK1719C0003
- Adding Some Minor Work In Scope
- 25 Oct 2019
- Adding Some Minor Work In Scope
- Pbs R9 - Los Angeles Service Center
- General Services Administration (Gsa)
- $370,261.00
- General Services Administration (Gsa)
- 70B01C20C00000181
- Ac Unit Installation
- 28 Sep 2020
- Ac Unit Installation
- Admin Facilities Training Ctr Div
- Department Of Homeland Security (Dhs)
- $43,583.00
- Department Of Homeland Security (Dhs)
- 47PK0918C0014
- Igf::Ot::Igf Modification/Change Order To Install Higher Grade Door Seal, Sound Blanket Insulation Above Ceiling Grid To Reduce Sound Transfer. Peroid Of Performance Is Extended Through August 31, 2018.
- 25 Jun 2018
- Igf::Ot::Igf Modification/Change Order To Install Higher Grade Door Seal, Sound Blanket Insulation Above Ceiling Grid To Reduce Sound Transfer. Peroid Of Performance Is Extended Through August 31, 2018.
- Pbs R9
- General Services Administration (Gsa)
- $44,542.00
- General Services Administration (Gsa)
- 47PK0919C0015
- Contractor To Provide All Labor, Support&Materials Necessary To Replace Counter Tops&Cabinets In Processing Area At Otay Mesa Lpoe Main Building&To Remove&Replace The Counter Tops&Cabinets In The Joint Use Break Room(See Scope Of Work)
- 1 Jul 2019
- Contractor To Provide All Labor, Support&Materials Necessary To Replace Counter Tops&Cabinets In Processing Area At Otay Mesa Lpoe Main Building&To Remove&Replace The Counter Tops&Cabinets In The Joint Use Break Room(See Scope Of Work)
- Pbs R9
- General Services Administration (Gsa)
- $63,890.00
- General Services Administration (Gsa)
- 47PK0921C0010
- (1) Relocate Office Door, (2)Patch Opening Of Existing Door Location And Match Wall Finishing,(3) Complete Removal Of Private Bathroom, And (4) Carpet The Office Space. Work To Be Done For Us Attorneys Located At 880 Front Street San Diego, Ca 92101
- 18 Dec 2020
- (1) Relocate Office Door, (2)Patch Opening Of Existing Door Location And Match Wall Finishing,(3) Complete Removal Of Private Bathroom, And (4) Carpet The Office Space. Work To Be Done For Us Attorneys Located At 880 Front Street San Diego, Ca 92101
- Pbs R9
- General Services Administration (Gsa)
- $54,654.00
- General Services Administration (Gsa)
- 47PK0920C0002
- To Purchase And Install A New Service Unit For Changers 5195. To Include Demo And Removal Of Existing Casework And Shelving And Installation Of Necessary Plumbing And Electrical. Install A Courts Supplied Service Unit 2Nd Floor.
- 21 Nov 2019
- To Purchase And Install A New Service Unit For Changers 5195. To Include Demo And Removal Of Existing Casework And Shelving And Installation Of Necessary Plumbing And Electrical. Install A Courts Supplied Service Unit 2Nd Floor.
- Pbs R9
- General Services Administration (Gsa)
- $41,527.00
- General Services Administration (Gsa)
- N6247316G1832
- Igf::Ot::Igf Boa For Minor Construction So.Cal.
- 9 Oct 2018
- Igf::Ot::Igf Boa For Minor Construction So.Cal.
- Navfac Southwest
- Department Of Defense (Dod)
- $0.00
- Department Of Defense (Dod)
- 70B01C20C00000147
- Covid-19 Mitigation Measures-All San Diego Ports Of Entry
- 15 Sep 2020
- Covid-19 Mitigation Measures-All San Diego Ports Of Entry
- Admin Facilities Training Ctr Div
- Department Of Homeland Security (Dhs)
- $235,979.00
- Department Of Homeland Security (Dhs)