Atk Space Systems Llc

CAGE Code: 55864

NCAGE Code: 55864

Status: Active

Type: Manufacturer

Dun & Bradstreet (DUNS): 623851073

CAGE 55864 Atk Space Systems Llc
CAGE 55864 Atk Space Systems Llc

Summary

Atk Space Systems Llc is an Active Manufacturer with the Cage Code 55864 and is tracked by Dun & Bradstreet under DUNS Number 623851073..

Address

600 Pine Ave
Goleta CA 93117-3803
United States

Points of Contact

Related Information

Associated CAGE Codes People who viewed this 'CAGE Code' also viewed...

CAGE Code FAQ Frequently Asked Questions (FAQ) for CAGE 55864

What is CAGE Code 55864?
55864 is the unique identifier used by NATO Organizations to reference the physical entity known as Atk Space Systems Llc located at 600 Pine Ave, Goleta CA 93117-3803, United States.
Who is CAGE Code 55864?
55864 refers to Atk Space Systems Llc located at 600 Pine Ave, Goleta CA 93117-3803, United States.
Where is CAGE Code 55864 Located?
CAGE Code 55864 is located in Goleta, CA, USA.
How Many NSNs Does CAGE Code 55864 Supply?
CAGE Code 55864 has been assigned as an approved source for 4 NSNs (National Stock Numbers and NATO Stock Numbers).

Contracting History for CAGE 55864 Contracting History for CAGE 55864 Most Recent 25 Records

80LARC21CA010
Eo14042 Design, Prototype, And Test The Lunar Vertical Solar Array Technology, A Solar Panel System Designed To Provide 10 Kilowatts Of Electrical Power And Be Robotically Deployable At The South Pole Of The Lunar Surface
18 Oct 2021
Nasa Langley Research Center
National Aeronautics And Space Administration (Nasa)
$700,000.00
80LARC21CA010
The Objective Of This Contract Is To Design, Prototype, And Test The Lunar Vertical Solar Array Technology, A Solar Panel System Designed To Provide 10 Kilowatts Of Electrical Power And Be Robotically Deployable At The South Pole Of The Lunar Surface
14 Sep 2021
Nasa Langley Research Center
National Aeronautics And Space Administration (Nasa)
$700,000.00
FA945319C1003
Advanced Spacecraft Systems With Integrated Structural Thermal Technologies Includes A Mix Of Design, Analysis, Fabrication And Test That Enables Advancements In The Power And Platform Elements Of The Compact Telescoping Array (Cta).
15 Apr 2019
Fa9453 Det 8 Afrl Pkv8
Department Of Defense (Dod)
$141,047.00
FA945319C1003
Atk Space Systems No Cost Extension
15 Jul 2021
Fa9453 Afrl Rvk
Department Of Defense (Dod)
$390,981.00
FA945319C1003
Atk Space Systems Add Work
18 Dec 2020
Fa9453 Det 8 Afrl Pkv8
Department Of Defense (Dod)
$390,981.00
80NSSC18P2916
Extendable Optical Bench Design For Feasibility Study
3 Aug 2018
Nasa Shared Services Center
National Aeronautics And Space Administration (Nasa)
$32,970.00
80GSFC18C0039
This Contract Will Be Performed By Orbital Atk (Oatk) Goleta In Support Of The Foxsi Phase A And Bridge Phase B (If Authorized) Concept Definition Portion Of The 2016 Small Explorer Announcement Of Opportunity #Nnh16zda005o. Oatk Goleta Shall Provide All Necessary Resources And Skills To Perform And Manage The Tasks Defined In This Sow Related To The Foxsi Instrument Boom Developed By Oatk Goleta. All Documentation May Be In Oatk Goleta Format. All Deliveries Are Electronic.
13 Aug 2018
Nasa Goddard Space Flight Center
National Aeronautics And Space Administration (Nasa)
$29,110.00
NNG11PA02C
The Contractor Shall Provide Support Under This Contract During Phase B, Phase C/D, And Phase E/F Of The Gravity And Extreme Magnetism (Small Explorers) Smex (Gems) Mission. The Gems Project Is Managed By The Nasa Goddard Space Flight Center (Gsfc) For The Gems Principle Investigator, Dr. Jean Swank, Of Gsfc. The Contractor Shall Provide The Telescope Optical Boom (Tob) For The Instrument, Which Includes Support For Integration To The Instrument Being Developed By The Gsfc. The Contractor Shall Establish, Implement And Maintain A Management System Which Integrates Management Disciplines, Functions, And Systems Into An Overall Activity To Achieve Cost-Effective Planning, Organizing, Controlling, And Reporting Of The Contract Objectives. The Contractor Shall Establish, Implement And Maintain A Scheduling Management Function, Which Develops Monitors And Maintains The Telescope Optical Boom (Tob) Master Schedule And Derivative Detailed Schedules For All Mission Element Activities Under Its Control, As Well As Plans For Scheduling All Mission Phases. The Contractor Shall Submit Monthly Technical Progress Presentations. The Contractor Shall Conduct Peer Reviews With Gsfc Participation Before The System Level Reviews. The Contractor Shall Provide The Necessary Resources To Prepare Technical And Programmatic Data Packages For Distribution At The System Level Reviews. The Contractor Shall Provide Overall Management Of Gems Tob Development Through Launch.
11 Sep 2018
Nasa Goddard Space Flight Center
National Aeronautics And Space Administration (Nasa)
$1,503,821.49
NNC16CA23C
Statement Of Work 1.0 Orbital Atk Intends To Develop High-Performance Concentrated Pv To Enable Affordable Sep Missions To Outer Planets. Orbital Atk's Tensioned Blanket Solar Arrays Incorporating Refractive Concentration Are Projected To Significantly (By At Least 50%) Reduce System Mass And Cost. The Subject Program Is Orbital Atk's Cta Solar Array Platform, To At Least Trl 6, Suitable For Infusion Into Near-Term Award Under The Nasa Headquarters Space Technology Mission Directorate Stmd Nasa Research Announcement Nra Entitled Space Technology Research Development Demonstration And Infusion 2015 Appendix Nnh15zoa001n 15Gcd C3 2 Scope Of Work This Program Is Divided Into Three Phases Base And Option 1 And Option 2 The Base Phase Is Focused On Determining The Conceptual Design Baseline And Will Include Pathfinder Coupon Hardware Development To Valiodate The Most Novel Aspects Of The Proposed Concept Option 1 Increases The Fidelity Of Hardware And Includes More Extensive Environmental Testing Option 2 Results In The Design And Fabrication Of A High Fidelity Blanket Subsystem And The Environmental And Functional Testing To Validate Performance In The Context Of A Complete Solar Array System.
8 Jun 2018
Nasa Glenn Research Center
National Aeronautics And Space Administration (Nasa)
$885,900.00
MSFC0200306DNAS803043
Scalable Solar Sail System Development And Ground Demonstration
3 Mar 2006
Marshall Space Flight Center
National Aeronautics And Space Administration (Nasa)
$3,625,040.00
MSFC0200306DNAS803043
Tas::80 0110::Tas 4200001427 Scalable Solar Sail System Development And Ground Demonstration
9 Jun 2005
Marshall Space Flight Center
National Aeronautics And Space Administration (Nasa)
$3,875,040.00
NNC16CA23C
Igf::Ot::Igf This Mod#12 Provides Incremental Funding To Cover The Pop Through 1/15/2018.
19 Mar 2018
Nasa Glenn Research Center
National Aeronautics And Space Administration (Nasa)
$885,900.00
NNC16CA23C
Extend The Period Of Performance Through 8/31/18.
9 Aug 2018
Nasa Glenn Research Center
National Aeronautics And Space Administration (Nasa)
$885,900.00
MSFC0200306DNAS803043
Tas::80 0110::Tas 4200001427 Scalable Solar Sail System Development And Ground Demonstration
1 Oct 2003
Marshall Space Flight Center
National Aeronautics And Space Administration (Nasa)
$3,875,040.00
NNC16CA23C
Igf::Ot::Igf This Mod#12 Provides Incremental Funding To Cover The Pop Through 1/15/2018.
20 Dec 2017
Nasa Glenn Research Center
National Aeronautics And Space Administration (Nasa)
$1,329,334.00
NNC16CA23C
Extend The Period Of Performance Through 8/31/18.
9 Aug 2018
Nasa Glenn Research Center
National Aeronautics And Space Administration (Nasa)
$1,309,188.00
80GSFC18C0039
This Requirement Will Be Performed By Orbital Atk Goleta In Support Of The Foxsi Phase A And Bridge Phase B (If Authorized) Concept Definition Portion Of The 2016 Small Explorer Announcement Of Opportunity #Nnh16zda005o.
14 Feb 2019
Nasa Goddard Space Flight Center
National Aeronautics And Space Administration (Nasa)
$29,110.00
MSFC0200306DNAS803043
4200001427 Scalable Solar Sail System Development And Ground Demonstration
15 Sep 2004
Marshall Space Flight Center
National Aeronautics And Space Administration (Nasa)
$3,875,040.00
NNG08EI66C
Provide The Telescope Optical Boom (Tob)For Integration Into The Gravity And Extreme Magnetism Small Explorer (Gems) Instrument. This Award Is A Result Of An Announcement Of Opoportunity. Atk Space Systems Will Be Supporting The Phase A Concept Definition Portion Of The Smex Solicitation By Providing The Necessary Resources And Skills To Perform And Manage The Tasks Defined Within This Sow For Phase A. The Contractor Shall Provide Input To The Phase A Concept Study Report (Csr) For The Evolved And Refined Gravity And Extreme Magnetism Small Explorer (Gems) Telescope Optical Boom (Tob) Design And Mission Concept. This Evolved Tob Mission Concept Will Serve As The Basis For Updated Mission Cost And Schedule Estimates. The Contractor Shall Also Provide Inputs To The Csr For Tob Cost And Schedule Updates Including Deployment Scenario.
30 Nov 2010
Goddard Space Flight Center
National Aeronautics And Space Administration (Nasa)
$586,116.00
NNC12CA43C
Igf::Ot::Igf Megaflex For Solar Electric Propulsion (Sep) Solar Array Systems (Sas) Nasa Office Of The Chief Technologist (Oct) Game Changing Development (Gcd) Program Solar Array Systems (Sas) Project
19 Dec 2014
Glenn Research Center
National Aeronautics And Space Administration (Nasa)
$6,766,760.93

NSN by CAGE Code Supply Items Approved for CAGE 55864 Page 1 of 1

1475
RNCC: 3 | RNVC: 2 | DAC: 5
1988
RNCC: 3 | RNVC: 2 | DAC: 5
10645T1501
RNCC: 3 | RNVC: 2 | DAC: B
1064T5001
RNCC: 3 | RNVC: 2 | DAC: B