Amidon, Inc
CAGE Code: 51WC2
NCAGE Code: 51WC2
Status: Discontinued
Type: Commercial Supplier
Dun & Bradstreet (DUNS): 622158843
Summary
Amidon, Inc is a Discontinued Commercial Supplier with the Cage Code 51WC2 and is tracked by Dun & Bradstreet under DUNS Number 622158843..
Address
7617 Kensington Manor Ln
Wake Forest NC 27587-3907
United States
Points of Contact
Related Information
People who viewed this 'CAGE Code' also viewed...
Athey Products Corp Graphics 2000 Leith Chris Chevrolet Inc Cargopak Corp Torfino Enterprises Inc Ls&C Freight Haulers Llc Posh Potty And Events Llc Tyler M. Davis Dds, Pa Synchron Innovative Solutions Llc Southern Hardwood Dei Inc Innovative Care Network Gross And Co Dynamic Industries Inc Applied Research And Technology Welsh Paper Co Bostrom Ford Inc Super Deal Tire And Muffler Believers Logistics Llc Ken Wilson Ford, Inc.
Frequently Asked Questions (FAQ) for CAGE 51WC2
- What is CAGE Code 51WC2?
- 51WC2 is the unique identifier used by NATO Organizations to reference the physical entity known as Amidon, Inc located at 7617 Kensington Manor Ln, Wake Forest NC 27587-3907, United States.
- Who is CAGE Code 51WC2?
- 51WC2 refers to Amidon, Inc located at 7617 Kensington Manor Ln, Wake Forest NC 27587-3907, United States.
- Where is CAGE Code 51WC2 Located?
- CAGE Code 51WC2 is located in Wake Forest, NC, USA.
Contracting History for CAGE 51WC2 Most Recent 25 Records
- INP16PC00751
- Igf::Ot::Igf Noxgrn Design/Build Services To Replace The Hvac System At The Pow Museum For At The Andersonville National Historic Site In Andersonville, Ga. Modification To Extend The Contract Completion Date.
- 25 May 2017
- Igf::Ot::Igf Noxgrn Design/Build Services To Replace The Hvac System At The Pow Museum For At The Andersonville National Historic Site In Andersonville, Ga. Modification To Extend The Contract Completion Date.
- Ser Southeast Region(50000)
- Department Of The Interior (Doi)
- $101,055.92
- Department Of The Interior (Doi)
- N0017816D8554
- Seaport Enhanced
- 22 Jun 2018
- Seaport Enhanced
- Nswc Dahlgren
- Department Of Defense (Dod)
- $0.00
- Department Of Defense (Dod)
- W911NF15P0009
- Proposal #: 68100-Od-Apo
- 10 Feb 2017
- Proposal #: 68100-Od-Apo
- W6qk Acc-Apg Durham
- Department Of Defense (Dod)
- $1,817,226.75
- Department Of Defense (Dod)
- N0017816D8554
- Seaport Enhanced
- 7 Dec 2017
- Seaport Enhanced
- Nswc Dahlgren
- Department Of Defense (Dod)
- $0.00
- Department Of Defense (Dod)
- N0017816D8554
- Seaport Enhanced
- 29 May 2018
- Seaport Enhanced
- Nswc Dahlgren
- Department Of Defense (Dod)
- $0.00
- Department Of Defense (Dod)
- INP16PC00751
- Modification To Change Contracting Officer From Laurie Chestnut To Rob Solomon. Replace The Hvac System At The Pow Museum For At The Andersonville National Historic Site In Andersonville, Ga.
- 6 Mar 2018
- Modification To Change Contracting Officer From Laurie Chestnut To Rob Solomon. Replace The Hvac System At The Pow Museum For At The Andersonville National Historic Site In Andersonville, Ga.
- Ser East Mabo(51000)
- Department Of The Interior (Doi)
- $101,055.92
- Department Of The Interior (Doi)
- W9126G16C0030
- Igf::Ot::Igf Contract For Pn 077187- Fy 12, Thaad East Range Road Access Control Point. Reference No. R00003 Mg003 Mechanical System Revision Mg004 Mold Remediation In Guard House Mg005 Pipe Insulation In Guard House Mg006 Window And Door Frame Deductive Change Mg007 Addition Of Two Canopy Lights Mg008 Pain Columns And Beams Vs Wrapping
- 6 Mar 2017
- Igf::Ot::Igf Contract For Pn 077187- Fy 12, Thaad East Range Road Access Control Point. Reference No. R00003 Mg003 Mechanical System Revision Mg004 Mold Remediation In Guard House Mg005 Pipe Insulation In Guard House Mg006 Window And Door Frame Deductive Change Mg007 Addition Of Two Canopy Lights Mg008 Pain Columns And Beams Vs Wrapping
- Us Army Engineer District Ft Worth
- Department Of Defense (Dod)
- $3,032,848.65
- Department Of Defense (Dod)
- N4008516C4421
- Igf::Ot::Igf Deletion Of Scope
- 21 Aug 2018
- Igf::Ot::Igf Deletion Of Scope
- Naval Fac Engineering Cmd Mid Lant
- Department Of Defense (Dod)
- $1,191,832.53
- Department Of Defense (Dod)
- W911QX17D0004
- Igf::Ot::Igf Amidon Construction
- 28 Sep 2017
- Igf::Ot::Igf Amidon Construction
- W6qk Acc-Apg Adelphi
- Department Of Defense (Dod)
- $0.00
- Department Of Defense (Dod)
- W911NF15P0009
- Proposal #: 68100-Od-Apo
- 25 Sep 2017
- Proposal #: 68100-Od-Apo
- W6qk Acc-Apg Durham
- Department Of Defense (Dod)
- $1,817,226.75
- Department Of Defense (Dod)
- W912HN17F4014
- Igf::Ot::Igf Repair Roof Building 1950, Ft. Bragg, Nc
- 4 Aug 2017
- Igf::Ot::Igf Repair Roof Building 1950, Ft. Bragg, Nc
- Us Army Engineer District Savannah
- Department Of Defense (Dod)
- $74,019.27
- Department Of Defense (Dod)
- W911NF15P0009
- Proposal #: 68100-Od-Apo
- 27 Apr 2017
- Proposal #: 68100-Od-Apo
- W6qk Acc-Apg Durham
- Department Of Defense (Dod)
- $1,817,226.75
- Department Of Defense (Dod)
- N0017816D8554
- Seaport Enhanced
- 16 Apr 2019
- Seaport Enhanced
- Nswc Dahlgren
- Department Of Defense (Dod)
- $0.00
- Department Of Defense (Dod)
- W9126G16C0103
- Miscellaneous 95% Review Changes
- 22 Jan 2018
- Miscellaneous 95% Review Changes
- Us Army Engineer District Ft Worth
- Department Of Defense (Dod)
- $2,202,307.23
- Department Of Defense (Dod)
- 0006
- Igf::Ot::Igf Aa00003-16 Repair South Jump Tower (Sus)
- 22 Feb 2017
- Igf::Ot::Igf Aa00003-16 Repair South Jump Tower (Sus)
- Us Army Engineer District Savannah
- Department Of Defense (Dod)
- $279,204.00
- Department Of Defense (Dod)
- W9126G16C0030
- Igf::Ot::Igf Contract For Pn 077187- Fy 12, Thaad East Range Road Access Control Point. Reference No. R00005 Mg010 Sewer Force Main And Manhole Changes Mg012 Credit Remainder Of Clin 2
- 24 Aug 2017
- Igf::Ot::Igf Contract For Pn 077187- Fy 12, Thaad East Range Road Access Control Point. Reference No. R00005 Mg010 Sewer Force Main And Manhole Changes Mg012 Credit Remainder Of Clin 2
- Us Army Engineer District Ft Worth
- Department Of Defense (Dod)
- $3,032,848.65
- Department Of Defense (Dod)
- W9126G14C0118
- Igf::Ot::Igf Mj005-Unforeseen Structural Condition
- 29 Sep 2017
- Igf::Ot::Igf Mj005-Unforeseen Structural Condition
- Us Army Engineer District Ft Worth
- Department Of Defense (Dod)
- $4,298,008.51
- Department Of Defense (Dod)
- W9126G16C0021
- Igf::Ot::Igf Jbsa Building 1350 Roof Replacement, Fsh, Tx A. Scope Of Work Mj001 Period Of Performance Extension Time Extension Due To Excusable Delays.
- 20 Apr 2017
- Igf::Ot::Igf Jbsa Building 1350 Roof Replacement, Fsh, Tx A. Scope Of Work Mj001 Period Of Performance Extension Time Extension Due To Excusable Delays.
- Us Army Engineer District Ft Worth
- Department Of Defense (Dod)
- $2,768,454.14
- Department Of Defense (Dod)
- W9126G16C0021
- Igf::Ot::Igf Jbsa Building 1350 Roof Replacement A. Scope Of Work Mj002 Roof Drains Replace The Existing Roof Drain Systems With New Roof Drain Systems.
- 13 Jun 2017
- Igf::Ot::Igf Jbsa Building 1350 Roof Replacement A. Scope Of Work Mj002 Roof Drains Replace The Existing Roof Drain Systems With New Roof Drain Systems.
- Us Army Engineer District Ft Worth
- Department Of Defense (Dod)
- $2,768,454.14
- Department Of Defense (Dod)
- W9126G16C0021
- Igf::Ot::Igf Jbsa Building 1350 Roof Replacement A. Scope Of Work Mj004 Wall Separation Repair Repair Wall Separation Gaps To Ensure Proper Functioning Of New Roof. The Appropriate Backer Rod And A Quality Sealant Shall Be Installed.
- 31 May 2017
- Igf::Ot::Igf Jbsa Building 1350 Roof Replacement A. Scope Of Work Mj004 Wall Separation Repair Repair Wall Separation Gaps To Ensure Proper Functioning Of New Roof. The Appropriate Backer Rod And A Quality Sealant Shall Be Installed.
- Us Army Engineer District Ft Worth
- Department Of Defense (Dod)
- $2,768,454.14
- Department Of Defense (Dod)
- W9126G16C0021
- Igf::Ot::Igf Jbsa Building 1350 Roof Replacement A. Scope Of Work Mj003 Descope Reinstallation Of Solar Panels The Reinstallation Of Solar Panels Shall Be De-Scoped. Solar Panels Shall Continue To Be Stored Until Contract Completion. Turn Solar Panels And Associated Equipment Over The Government After Contract Completion.
- 31 May 2017
- Igf::Ot::Igf Jbsa Building 1350 Roof Replacement A. Scope Of Work Mj003 Descope Reinstallation Of Solar Panels The Reinstallation Of Solar Panels Shall Be De-Scoped. Solar Panels Shall Continue To Be Stored Until Contract Completion. Turn Solar Panels And Associated Equipment Over The Government After Contract Completion.
- Us Army Engineer District Ft Worth
- Department Of Defense (Dod)
- $2,768,454.14
- Department Of Defense (Dod)
- W9126G16C0021
- Igf::Ot::Igf Building 1350 Roof Replacement, Fsh Scope Of Work Mj007 Solar Panel Storage Description Of Change: Pursuant To The Clause Of The Contract Entitled, "Far 52.243-4 Changes", The Contractor Shall Furnish All Plant, Labor, Materials, And Perform All Work Necessary To Accomplish The Following Described Work: The Solar Panels Currently Being Stored In Conex Boxes At Building 1350 Shall Be Turned Over To The Government. The Solar Panels Shall Be Transported And Stored At A Location On Fort Sam Houston As Directed By The Contracting Officer.
- 8 Aug 2017
- Igf::Ot::Igf Building 1350 Roof Replacement, Fsh Scope Of Work Mj007 Solar Panel Storage Description Of Change: Pursuant To The Clause Of The Contract Entitled, "Far 52.243-4 Changes", The Contractor Shall Furnish All Plant, Labor, Materials, And Perform All Work Necessary To Accomplish The Following Described Work: The Solar Panels Currently Being Stored In Conex Boxes At Building 1350 Shall Be Turned Over To The Government. The Solar Panels Shall Be Transported And Stored At A Location On Fort Sam Houston As Directed By The Contracting Officer.
- Us Army Engineer District Ft Worth
- Department Of Defense (Dod)
- $2,768,454.14
- Department Of Defense (Dod)
- W9126G16C0021
- Igf::Ot::Igf Jbsa Building 1350 Roof Replacement A. Scope Of Work Mj006 Weather Time Extension 01Sep16-30Apr17 This Modification Extends The Time For Performance Allowed Under Specification Section 01 10 01 For Delays Caused By Adverse Weather In Excess Of Anticipated During The Period 01 September 2016 Through 30 April 2017. The Following Table Summarizes Adverse Weather Days
- 14 Jun 2017
- Igf::Ot::Igf Jbsa Building 1350 Roof Replacement A. Scope Of Work Mj006 Weather Time Extension 01Sep16-30Apr17 This Modification Extends The Time For Performance Allowed Under Specification Section 01 10 01 For Delays Caused By Adverse Weather In Excess Of Anticipated During The Period 01 September 2016 Through 30 April 2017. The Following Table Summarizes Adverse Weather Days
- Us Army Engineer District Ft Worth
- Department Of Defense (Dod)
- $2,768,454.14
- Department Of Defense (Dod)
- INP16PC00751
- Modification To De-Obligate The Remaining Funds. Replace The Hvac System At The Pow Museum For At The Andersonville National Historic Site In Andersonville, Ga.
- 10 Sep 2018
- Modification To De-Obligate The Remaining Funds. Replace The Hvac System At The Pow Museum For At The Andersonville National Historic Site In Andersonville, Ga.
- Ser East Mabo(51000)
- Department Of The Interior (Doi)
- $101,055.92
- Department Of The Interior (Doi)
- W9126G16C0103
- Igf::Ot::Igf Repair B2186, Jbsa Fort Sam Houston, Tx Mj003 Cannon Caisson Storage Area I. Description Of Change: Pursuant To The Clause Of The Contract Entitled, "Changes", The Contractor Shall Furnish All Plant, Labor, Materials, And Perform All Work Necessary To Accomplish The Following Described Work: The Below Work Applies To The Cannon/Caisson Storage Side Of Building 2186: 1. Design And Replace All Interior Electrical And Provide Additional Lighting For Cannon Caisson Maintenance As Follows; Provide New Interior Led Lighting. Provide Minimum 50 Foot Candles
- 27 Oct 2017
- Igf::Ot::Igf Repair B2186, Jbsa Fort Sam Houston, Tx Mj003 Cannon Caisson Storage Area I. Description Of Change: Pursuant To The Clause Of The Contract Entitled, "Changes", The Contractor Shall Furnish All Plant, Labor, Materials, And Perform All Work Necessary To Accomplish The Following Described Work: The Below Work Applies To The Cannon/Caisson Storage Side Of Building 2186: 1. Design And Replace All Interior Electrical And Provide Additional Lighting For Cannon Caisson Maintenance As Follows; Provide New Interior Led Lighting. Provide Minimum 50 Foot Candles
- Us Army Engineer District Ft Worth
- Department Of Defense (Dod)
- $2,202,307.23
- Department Of Defense (Dod)