Edifice Llc
Dba Edifice Solutions
CAGE Code: 4WG06
NCAGE Code: 4WG06
Status: Excluded or Suspended
Type: Commercial Supplier
Dun & Bradstreet (DUNS): 625601054
Summary
Edifice Llc, Dba Edifice Solutions is an Excluded or Suspended Commercial Supplier with the Cage Code 4WG06 and is tracked by Dun & Bradstreet under DUNS Number 625601054..
Address
6600 Virginia Manor Rd
Beltsville MD 20705-1255
United States
Points of Contact
No Points of Contact...
Related Information
People who viewed this 'CAGE Code' also viewed...
Potomac Environmental Technologies, Pulse Engineering Services A & R Enterprises Inc Dba Signs By American Equipment Co Infotech Associates, Inc. 1 Direct Inc Ritz Audiovisual Associates Inc Lewis & Hitchcock Inc Reprographic Technologies Inc Swath Europe Thomas Enterprises Inc Spectre Engineering Llc Mineral Pigments Corp The James Myers Company, Inc. Jimco Sales Kronos Inc Medserv International, Inc. At Your Service Inc Inacom Information Systems Hieto Engineering Inc
Frequently Asked Questions (FAQ) for CAGE 4WG06
- What is CAGE Code 4WG06?
- 4WG06 is the unique identifier used by NATO Organizations to reference the physical entity known as Edifice Llc Dba Edifice Solutions located at 6600 Virginia Manor Rd, Beltsville MD 20705-1255, United States.
- Who is CAGE Code 4WG06?
- 4WG06 refers to Edifice Llc Dba Edifice Solutions located at 6600 Virginia Manor Rd, Beltsville MD 20705-1255, United States.
- Where is CAGE Code 4WG06 Located?
- CAGE Code 4WG06 is located in Beltsville, MD, USA.
Contracting History for CAGE 4WG06 Most Recent 25 Records
- 47PM1020F0046
- Assignment Of Claims Modification To "Everest Reinsurance Corporation"
- 31 May 2023
- Assignment Of Claims Modification To "Everest Reinsurance Corporation"
- Pbs Ncr White House
- General Services Administration (Gsa)
- $554,987.63
- General Services Administration (Gsa)
- 47PM1020F0046
- Task Order 47Pm1020f0046-Vp Ops And Ppd Ops Renovation Project Contractor Shall Provide All Labor And Materials To Complete The Work Per The Scope Of Work 180 Days From Issuance Of Notice To Proceed.
- 4 Aug 2020
- Task Order 47Pm1020f0046-Vp Ops And Ppd Ops Renovation Project Contractor Shall Provide All Labor And Materials To Complete The Work Per The Scope Of Work 180 Days From Issuance Of Notice To Proceed.
- Pbs Ncr White House
- General Services Administration (Gsa)
- $548,888.23
- General Services Administration (Gsa)
- 47PM1020F0046
- This Modification Hereby Enforces That Edifice Solutions Comply With The Department Of Labor Local Prevailing Wage Rate At The Time Of Task Order Award, As Per Clause 52.222-6 And 52.222-13 Included In The Base Idiq Contract 47Pm0518d0003.
- 13 Dec 2021
- This Modification Hereby Enforces That Edifice Solutions Comply With The Department Of Labor Local Prevailing Wage Rate At The Time Of Task Order Award, As Per Clause 52.222-6 And 52.222-13 Included In The Base Idiq Contract 47Pm0518d0003.
- Pbs Ncr White House
- General Services Administration (Gsa)
- $554,987.63
- General Services Administration (Gsa)
- 47PM1020F0046
- This Modification Hereby Corrects An Accounting String To Add $19,478 To Accounting String En-47Pm1020f0046.2022.192X.11.P1122021.Pg80.Pgl26.K01..Dc0035zz..2036988.1.......
- 25 Jan 2022
- This Modification Hereby Corrects An Accounting String To Add $19,478 To Accounting String En-47Pm1020f0046.2022.192X.11.P1122021.Pg80.Pgl26.K01..Dc0035zz..2036988.1.......
- Pbs Ncr White House
- General Services Administration (Gsa)
- $574,465.63
- General Services Administration (Gsa)
- 47PM1020F0046
- No Cost Time Extension Modification To Allow Contractor To Make Corrections. New Expiration Date Is 12/31/2021.
- 6 Oct 2021
- No Cost Time Extension Modification To Allow Contractor To Make Corrections. New Expiration Date Is 12/31/2021.
- Pbs Ncr White House
- General Services Administration (Gsa)
- $554,987.63
- General Services Administration (Gsa)
- 47PM1020F0046
- Contractor To Provide All Labor, Materials, Equipment And Supervision To Provide Connectivity To Qty. 5 Furniture Base Power Feed Whips And To Install 7 New Monitors. Period Of Performance Is Extended By 21 Days.
- 29 Jun 2021
- Contractor To Provide All Labor, Materials, Equipment And Supervision To Provide Connectivity To Qty. 5 Furniture Base Power Feed Whips And To Install 7 New Monitors. Period Of Performance Is Extended By 21 Days.
- Pbs Ncr White House
- General Services Administration (Gsa)
- $554,987.63
- General Services Administration (Gsa)
- 47PM1020F0046
- Task Order 47Pm1020f0046, Mod Ps0001 - Vp Ops And Ppd Ops Renovation-Asbestos Abatement Change Order For Asbestos Abatement In Floor Tile In Rooms 16 And 44 In The Eisenhower Executive Office Building.
- 12 Nov 2020
- Task Order 47Pm1020f0046, Mod Ps0001 - Vp Ops And Ppd Ops Renovation-Asbestos Abatement Change Order For Asbestos Abatement In Floor Tile In Rooms 16 And 44 In The Eisenhower Executive Office Building.
- Pbs Ncr White House
- General Services Administration (Gsa)
- $554,987.63
- General Services Administration (Gsa)
- 47PM1020F0046
- $0 Period Of Performance Extension To Allow Contractor To Correct Punch List Items.
- 6 Dec 2021
- $0 Period Of Performance Extension To Allow Contractor To Correct Punch List Items.
- Pbs Ncr White House
- General Services Administration (Gsa)
- $554,987.63
- General Services Administration (Gsa)
- 47PM1020F0046
- Task Order 47Pm1020f0046-Vp And Ppd Ops Renovation Project-Mod Ps0002 This Modification Hereby Adds Additional Work Within Scope Including Hvac Existing Conditions Survey And Design Options. The New Completion Date Is 3/30/2021.
- 19 Jan 2021
- Task Order 47Pm1020f0046-Vp And Ppd Ops Renovation Project-Mod Ps0002 This Modification Hereby Adds Additional Work Within Scope Including Hvac Existing Conditions Survey And Design Options. The New Completion Date Is 3/30/2021.
- Pbs Ncr White House
- General Services Administration (Gsa)
- $554,987.63
- General Services Administration (Gsa)
- 47PM1020F0046
- Internal Corrective Action To Correct The Accounting Strings And Complete The Cost Transfer. Also Updates The Cor From Bridget Rogers To Ryan Erb. All Other Terms And Conditions Remain Unchanged.
- 23 Feb 2022
- Internal Corrective Action To Correct The Accounting Strings And Complete The Cost Transfer. Also Updates The Cor From Bridget Rogers To Ryan Erb. All Other Terms And Conditions Remain Unchanged.
- Pbs Ncr White House
- General Services Administration (Gsa)
- $554,987.63
- General Services Administration (Gsa)
- 47PM1020F0046
- Modification Pc0003-Additional Work For Work Within Scope To Include The Revision Of Construction Documents To Show The Updates To Suite 15/16 And The Removal Of The Partition In Room 45 At The Eisenhower Executive Office Building.
- 18 Feb 2021
- Modification Pc0003-Additional Work For Work Within Scope To Include The Revision Of Construction Documents To Show The Updates To Suite 15/16 And The Removal Of The Partition In Room 45 At The Eisenhower Executive Office Building.
- Pbs Ncr White House
- General Services Administration (Gsa)
- $554,987.63
- General Services Administration (Gsa)
- 47PM1020F0046
- Deobligation Of Funds Due To Surety Non-Responsiveness To Requests For Invoice.
- 24 Aug 2023
- Deobligation Of Funds Due To Surety Non-Responsiveness To Requests For Invoice.
- Pbs Ncr White House
- General Services Administration (Gsa)
- $548,888.23
- General Services Administration (Gsa)
- 47PM1020F0046
- Time Extension To Allow Contractor To Correct Flooring Issues.
- 26 Aug 2021
- Time Extension To Allow Contractor To Correct Flooring Issues.
- Pbs Ncr White House
- General Services Administration (Gsa)
- $554,987.63
- General Services Administration (Gsa)
- 47PM1020F0046
- No Cost Time Extension To Allow Contractor Time To Correct Punch List Items.
- 10 Aug 2021
- No Cost Time Extension To Allow Contractor Time To Correct Punch List Items.
- Pbs Ncr White House
- General Services Administration (Gsa)
- $554,987.63
- General Services Administration (Gsa)
- 19AQMM19F4264
- Purpose Of Modification Is To Add New Requirements To J Attachment, Section E, And Section H Of The Contract.
- 4 Nov 2020
- Purpose Of Modification Is To Add New Requirements To J Attachment, Section E, And Section H Of The Contract.
- Acquisitions - Aqm Momentum
- Department Of State (Dos)
- $2,964,147.64
- Department Of State (Dos)
- 19AQMM19F4264
- Addition Of Day Gate To Scope Of Work
- 15 Jul 2020
- Addition Of Day Gate To Scope Of Work
- Acquisitions - Aqm Momentum
- Department Of State (Dos)
- $2,959,199.54
- Department Of State (Dos)
- 19AQMM19F4264
- Incorporation Of Attachment J-1-01-1 And Updated Language To Sections E And H Of Task Order.
- 15 Jul 2020
- Incorporation Of Attachment J-1-01-1 And Updated Language To Sections E And H Of Task Order.
- Acquisitions - Aqm Momentum
- Department Of State (Dos)
- $2,964,147.64
- Department Of State (Dos)
- 19AQMM19F4264
- Purpose Of Modification Is Add A Crane Rental To The Scope Of Work For One Day.
- 14 Mar 2022
- Purpose Of Modification Is Add A Crane Rental To The Scope Of Work For One Day.
- Acquisitions - Aqm Momentum
- Department Of State (Dos)
- $2,923,025.64
- Department Of State (Dos)
- 19AQMM19F4264
- Relocation And Changing Of Hardware For Febr Door Product.
- 15 Jul 2020
- Relocation And Changing Of Hardware For Febr Door Product.
- Acquisitions - Aqm Momentum
- Department Of State (Dos)
- $2,964,147.64
- Department Of State (Dos)
- 19AQMM19F4264
- Purpose Of Modification Is Add A Crane Rental To The Scope Of Work For One Day.
- 3 Feb 2022
- Purpose Of Modification Is Add A Crane Rental To The Scope Of Work For One Day.
- Acquisitions - Aqm Momentum
- Department Of State (Dos)
- $3,027,633.64
- Department Of State (Dos)
- 19AQMM19F4264
- Fe/Br Replacement Project At Us Consulate - Bordeaux And Us Embassy - Paris.
- 27 Sep 2019
- Fe/Br Replacement Project At Us Consulate - Bordeaux And Us Embassy - Paris.
- Acquisitions - Aqm Momentum
- Department Of State (Dos)
- $2,953,930.00
- Department Of State (Dos)
- 19AQMM19F4264
- Purpose Of Modification Is To Extend Contract Completion Date By 204 Calendar Days Based On Excusable Delays Related To The Covid-19 Pandemic.
- 17 Sep 2021
- Purpose Of Modification Is To Extend Contract Completion Date By 204 Calendar Days Based On Excusable Delays Related To The Covid-19 Pandemic.
- Acquisitions - Aqm Momentum
- Department Of State (Dos)
- $2,964,147.64
- Department Of State (Dos)
- 19AQMM19F4264
- Purpose Of Modification Is To Deobligate Funding To Re-Award Due To Contractor Being Out Of Business.
- 31 Jul 2023
- Purpose Of Modification Is To Deobligate Funding To Re-Award Due To Contractor Being Out Of Business.
- Acquisitions - Aqm Momentum
- Department Of State (Dos)
- $2,691,907.78
- Department Of State (Dos)
- N4008520F4066
- P00003 No Cost Time Extension Q834 Design Build Sof Magazines, Nas Oceana
- 26 Jan 2022
- P00003 No Cost Time Extension Q834 Design Build Sof Magazines, Nas Oceana
- Naval Fac Engineering Cmd Mid Lant
- Department Of Defense (Dod)
- $9,360,358.00
- Department Of Defense (Dod)
- N4008520F4066
- X002 Q834 Design Build Sof Magazines, Nas Oceana
- 2 Sep 2021
- X002 Q834 Design Build Sof Magazines, Nas Oceana
- Naval Fac Engineering Cmd Mid Lant
- Department Of Defense (Dod)
- $9,360,358.00
- Department Of Defense (Dod)