Gilbane-Grunley Jv
Div Gilbane-Grunley Joint Venture
CAGE Code: 4V1C0
NCAGE Code: 4V1C0
Status: Active
Type: Commercial Supplier
Dun & Bradstreet (DUNS): 798795402
Summary
Gilbane-Grunley Jv, Div Gilbane-Grunley Joint Venture is an Active Commercial Supplier with the Cage Code 4V1C0 and is tracked by Dun & Bradstreet under DUNS Number 798795402..
Address
15020 Shady Grove Rd Ste 500
Rockville MD 20850-3390
United States
Points of Contact
No Points of Contact...
Related Information
People who viewed this 'CAGE Code' also viewed...
Dansources Technical Services, Inc. Linda Fang Ht Medical Systems Inc Stream Intl Inc Air Services Inc Lcg Inc Social And Health Services Ltd S.S. Papadopulos & Associates, Inc. Twinbrook Tv And Computer Covington Sharon N Dictaphone Corp Sgl Industries Inc Selecter Div Polytronic Research Inc White Flint Pharmacy Inc Copy Supply Llc Wardwell Richard E Inc Tec Inc Sporicidin International Computer Pros Inc Dally James
Frequently Asked Questions (FAQ) for CAGE 4V1C0
- What is CAGE Code 4V1C0?
- 4V1C0 is the unique identifier used by NATO Organizations to reference the physical entity known as Gilbane-Grunley Jv Div Gilbane-Grunley Joint Venture located at 15020 Shady Grove Rd Ste 500, Rockville MD 20850-3390, United States.
- Who is CAGE Code 4V1C0?
- 4V1C0 refers to Gilbane-Grunley Jv Div Gilbane-Grunley Joint Venture located at 15020 Shady Grove Rd Ste 500, Rockville MD 20850-3390, United States.
- Where is CAGE Code 4V1C0 Located?
- CAGE Code 4V1C0 is located in Rockville, MD, USA.
Contracting History for CAGE 4V1C0 Most Recent 25 Records
- GS11P06MKC0030
- Definitizing Ce 4 322 Fitness Center Water Infiltration And Agreement Of Ce 4 312 Garage Door Repairs
- 5 Aug 2020
- Definitizing Ce 4 322 Fitness Center Water Infiltration And Agreement Of Ce 4 312 Garage Door Repairs
- Pbs Ncr Ofc Of Acquisition Mgmt
- General Services Administration (Gsa)
- $341,005,100.17
- General Services Administration (Gsa)
- GS11P06MKC0030
- Gs11p06mkc0030 Cmc Services For The Department Of Commerce Modernization Wash Dc Mod Pcm5: Pdl Nte $481,079.00 Miscellaneous Ces In Accordance With Far 52.243 - Changes (Fixed Price) Issued In Your Contract, You Are Hereby Directed To Proceed With Scope Of Work As Described In Clin 0474 To Clin 0485, On A Pdl Nte $481,079.00 Basis, Without Further Authorization. Refer To Individual Ces For Definite Scope Of Required Work. Clin 0474 Ce 4-104 P4.0356 290 - Phase 4 - Fitness Center Revised Mep - Pdl Definitized Add $210,680.00 Clin 0475 Ce 4 -188 596 - Phase 4 - Attic Access Opening (Doc Request) Add $16,197.00 Clin 0476 Ce 4 -215 - Phase 4 Basement Steam Condensate Line Relocation Add $51,451.00 Clin 0477 Ce 4-221 - Phase 4 - Wall Base Changes In Sec Area Add $10,090 Clin 0478 Ce 4-242 - Phase 4 - Install Data Patch Cords Add $43,781 Clin 0479 Ce 4-247 - Phase 4 - Blocking For Demountable Walls Add $15,748 Clin 0480 Ce 4-249 P4.0871 - Phase 4 Keying Schedule Add $30,092 Clin 0481 Ce 4-250 - Phase 4 - Security Door Rough-In Per Ty Drawings Add $40,000 Clin 0482 Ce 4-254 - Phase 4 Load-Shed/Generator Testing Add $15,000 Clin 0483 Ce 4-255 716 - Phase 4 - Power Supplies For Security Doors Add $15,000 Clin 0484 Ce 4-258 P4.0883 - Phase 4 Isolate Fitness Center Sprinkler Add $13,040 Clin 0485 Ce 4-268 - Elevator Inspection And Path Forward Add $20,000 This Modification Is Issued On A Price To Be Determined Later Basis In Accordance With Gsar 552.243-71. The Contractor Shall Submit A Complete Proposal For The Requirements Described Within This Modification Within 7 Days From The Effective Date Of This Modification. In Performing This Modification, The Contractor Shall Notify The Co In Writing When The Costs It Expects To Incur For Work Listed In This Modification Will Exceed 50 Percent Of The Cost, (Nte Price), Of The Modification. No Work, Listed In This Modification, Shall Be Completed Or Invoiced That Will Exceed 80 Percent Of The Cost Of The Modification. The Contractor Shall Not Bill For More Than 80 Percent Of The Nte Amount Of This Modification Unless Authorized By A Subsequent Modification To The Contract. The Government Is Not Liable For Costs Incurred In Excess Of The Nte Amount Of This Modification. Final Contract Period Of Performance Date Remains As 03/21/2021 All Work Is To Be Completed In Accordance With All Applicable Contract Requirements, Regulations And Standards. Settlement Of This Change Will Include All Associated Costs, Direct And Indirect, Impact And Delay. All Terms And Conditions Remain In Full Force And Effect.
- 27 Dec 2018
- Gs11p06mkc0030 Cmc Services For The Department Of Commerce Modernization Wash Dc Mod Pcm5: Pdl Nte $481,079.00 Miscellaneous Ces In Accordance With Far 52.243 - Changes (Fixed Price) Issued In Your Contract, You Are Hereby Directed To Proceed With Scope Of Work As Described In Clin 0474 To Clin 0485, On A Pdl Nte $481,079.00 Basis, Without Further Authorization. Refer To Individual Ces For Definite Scope Of Required Work. Clin 0474 Ce 4-104 P4.0356 290 - Phase 4 - Fitness Center Revised Mep - Pdl Definitized Add $210,680.00 Clin 0475 Ce 4 -188 596 - Phase 4 - Attic Access Opening (Doc Request) Add $16,197.00 Clin 0476 Ce 4 -215 - Phase 4 Basement Steam Condensate Line Relocation Add $51,451.00 Clin 0477 Ce 4-221 - Phase 4 - Wall Base Changes In Sec Area Add $10,090 Clin 0478 Ce 4-242 - Phase 4 - Install Data Patch Cords Add $43,781 Clin 0479 Ce 4-247 - Phase 4 - Blocking For Demountable Walls Add $15,748 Clin 0480 Ce 4-249 P4.0871 - Phase 4 Keying Schedule Add $30,092 Clin 0481 Ce 4-250 - Phase 4 - Security Door Rough-In Per Ty Drawings Add $40,000 Clin 0482 Ce 4-254 - Phase 4 Load-Shed/Generator Testing Add $15,000 Clin 0483 Ce 4-255 716 - Phase 4 - Power Supplies For Security Doors Add $15,000 Clin 0484 Ce 4-258 P4.0883 - Phase 4 Isolate Fitness Center Sprinkler Add $13,040 Clin 0485 Ce 4-268 - Elevator Inspection And Path Forward Add $20,000 This Modification Is Issued On A Price To Be Determined Later Basis In Accordance With Gsar 552.243-71. The Contractor Shall Submit A Complete Proposal For The Requirements Described Within This Modification Within 7 Days From The Effective Date Of This Modification. In Performing This Modification, The Contractor Shall Notify The Co In Writing When The Costs It Expects To Incur For Work Listed In This Modification Will Exceed 50 Percent Of The Cost, (Nte Price), Of The Modification. No Work, Listed In This Modification, Shall Be Completed Or Invoiced That Will Exceed 80 Percent Of The Cost Of The Modification. The Contractor Shall Not Bill For More Than 80 Percent Of The Nte Amount Of This Modification Unless Authorized By A Subsequent Modification To The Contract. The Government Is Not Liable For Costs Incurred In Excess Of The Nte Amount Of This Modification. Final Contract Period Of Performance Date Remains As 03/21/2021 All Work Is To Be Completed In Accordance With All Applicable Contract Requirements, Regulations And Standards. Settlement Of This Change Will Include All Associated Costs, Direct And Indirect, Impact And Delay. All Terms And Conditions Remain In Full Force And Effect.
- Pbs Ncr Capital Construction Ctr 2
- General Services Administration (Gsa)
- $337,998,458.17
- General Services Administration (Gsa)
- GS11P06MKC0030
- Pdl Nte To Provide Labor, Materials, Equipment And Supervision For Ce 4-290 Reagan Tunnel Entrance And Basement Corridor 0 Hvac And Ce 4-292 Occupancy Sensors
- 19 Nov 2019
- Pdl Nte To Provide Labor, Materials, Equipment And Supervision For Ce 4-290 Reagan Tunnel Entrance And Basement Corridor 0 Hvac And Ce 4-292 Occupancy Sensors
- Pbs Ncr Capital Construction Ctr 2
- General Services Administration (Gsa)
- $338,374,993.17
- General Services Administration (Gsa)
- GS11P06MKC0030
- Pdl Corridor 8 Under Drain Connections
- 17 Apr 2020
- Pdl Corridor 8 Under Drain Connections
- Pbs Ncr Capital Construction Ctr 2
- General Services Administration (Gsa)
- $339,280,766.17
- General Services Administration (Gsa)
- GS11P06MKC0030
- Provide Labor, Supervision And Materials For The Following Ce 4 250 Phase 4 Security Door Roughin,Ce 4 297 Phase 4 Blocking In Room 18050 Video Wall Changes, Ce 4 301 Fitness Slab Elevation And Geotechnical Analysis
- 9 Jul 2019
- Provide Labor, Supervision And Materials For The Following Ce 4 250 Phase 4 Security Door Roughin,Ce 4 297 Phase 4 Blocking In Room 18050 Video Wall Changes, Ce 4 301 Fitness Slab Elevation And Geotechnical Analysis
- Pbs Ncr Capital Construction Ctr 2
- General Services Administration (Gsa)
- $338,141,276.17
- General Services Administration (Gsa)
- GS11P06MKC0030
- Pdl Nte To Provide Labor, Materials, Supervision And Equipment To Remove Damaged Wet Bathroom Finishes On 6Th And 7Th Fl And Video Of 2 Pump Room Drain Lines
- 15 Apr 2020
- Pdl Nte To Provide Labor, Materials, Supervision And Equipment To Remove Damaged Wet Bathroom Finishes On 6Th And 7Th Fl And Video Of 2 Pump Room Drain Lines
- Pbs Ncr Capital Construction Ctr 2
- General Services Administration (Gsa)
- $339,260,766.17
- General Services Administration (Gsa)
- GS11P06MKC0030
- Bulletin 68, Courtyard Pipe, Drain Line
- 6 May 2020
- Bulletin 68, Courtyard Pipe, Drain Line
- Pbs Ncr Ofc Of Acquisition Mgmt
- General Services Administration (Gsa)
- $339,372,809.17
- General Services Administration (Gsa)
- GS11P06MKC0030
- Pop Extension
- 25 May 2022
- Pop Extension
- Pbs Ncr Ofc Of Acquisition Mgmt
- General Services Administration (Gsa)
- $341,463,680.17
- General Services Administration (Gsa)
- GS11P06MKC0030
- Counterflashing Over Waterproofing In Courtyard, Delays Due To Steam Condensate Failure During Sump Pump Sp-13 Installation
- 22 Apr 2021
- Counterflashing Over Waterproofing In Courtyard, Delays Due To Steam Condensate Failure During Sump Pump Sp-13 Installation
- Pbs Ncr Ofc Of Acquisition Mgmt
- General Services Administration (Gsa)
- $341,429,662.17
- General Services Administration (Gsa)
- GS11P06MKC0030
- Change Designated Billing Office Code
- 21 Apr 2020
- Change Designated Billing Office Code
- Pbs Ncr Ofc Of Acquisition Mgmt
- General Services Administration (Gsa)
- $339,280,766.17
- General Services Administration (Gsa)
- GS11P06MKC0030
- Provide Labor, Materials And Supervision To Complete Various Ces For Phase 4, Cmc Services For The Department Of Commerce Modernization, Wash., Dc
- 30 May 2018
- Provide Labor, Materials And Supervision To Complete Various Ces For Phase 4, Cmc Services For The Department Of Commerce Modernization, Wash., Dc
- Pbs Ncr Capital Construction Ctr 2
- General Services Administration (Gsa)
- $337,998,458.17
- General Services Administration (Gsa)
- GS11P06MKC0030
- Pop Extension For Closeout
- 26 Mar 2021
- Pop Extension For Closeout
- Pbs Ncr Ofc Of Acquisition Mgmt
- General Services Administration (Gsa)
- $341,416,754.17
- General Services Administration (Gsa)
- GS11P06MKC0030
- Gs11p06mkc0030 Cmc Services For The Department Of Commerce Modernization Wash Dc Pdl Mod Pcn1 Nte $17,252.00 In Accordance With Far 52.243 - Changes (Fixed Price) Issued In Your Contract, You Are Hereby Directed To Proceed With Scope Of Work As Described In Clin 0513 To Clin 0516, On A Pdl Nte $17,252.00 Basis, Without Further Authorization. Refer To Individual Ces For Definite Scope Of Required Work. Clin 0513 Ce 3-607 - Sub-Basement Heaters - $10,425 - Ba55 Clin 0514 Ce 4-238 - 1St Floor Ada Bathroom Hardware - $844 - Ba55 Clin 0515 Ce 4-294 - 7Th Floor Corridor 0 Ceiling Bulkhead - $2,979 - Ba55 Clin 0516 Ce 4-296 - Electric Panel Locations In The Basement - $3,004 - Ba55 This Modification Is Issued On A Price To Be Determined Later Basis In Accordance With Gsar 552.243-71. The Contractor Shall Submit A Complete Proposal For The Requirements Described Within This Modification Within 7 Days From The Effective Date Of This Modification. In Performing This Modification, The Contractor Shall Notify The Co In Writing When The Costs It Expects To Incur For Work Listed In This Modification Will Exceed 50 Percent Of The Cost, (Nte Price), Of The Modification. No Work, Listed In This Modification, Shall Be Completed Or Invoiced That Will Exceed 80 Percent Of The Cost Of The Modification. The Contractor Shall Not Bill For More Than 80 Percent Of The Nte Amount Of This Modification Unless Authorized By A Subsequent Modification To The Contract. The Government Is Not Liable For Costs Incurred In Excess Of The Nte Amount Of This Modification. Final Contract Period Of Performance Date Remains As 03/21/2021 All Work Is To Be Completed In Accordance With All Applicable Contract Requirements, Regulations And Standards. Settlement Of This Change Will Include All Associated Costs, Direct And Indirect, Impact And Delay. All Terms And Conditions Remain In Full Force And Effect.
- 14 Jun 2019
- Gs11p06mkc0030 Cmc Services For The Department Of Commerce Modernization Wash Dc Pdl Mod Pcn1 Nte $17,252.00 In Accordance With Far 52.243 - Changes (Fixed Price) Issued In Your Contract, You Are Hereby Directed To Proceed With Scope Of Work As Described In Clin 0513 To Clin 0516, On A Pdl Nte $17,252.00 Basis, Without Further Authorization. Refer To Individual Ces For Definite Scope Of Required Work. Clin 0513 Ce 3-607 - Sub-Basement Heaters - $10,425 - Ba55 Clin 0514 Ce 4-238 - 1St Floor Ada Bathroom Hardware - $844 - Ba55 Clin 0515 Ce 4-294 - 7Th Floor Corridor 0 Ceiling Bulkhead - $2,979 - Ba55 Clin 0516 Ce 4-296 - Electric Panel Locations In The Basement - $3,004 - Ba55 This Modification Is Issued On A Price To Be Determined Later Basis In Accordance With Gsar 552.243-71. The Contractor Shall Submit A Complete Proposal For The Requirements Described Within This Modification Within 7 Days From The Effective Date Of This Modification. In Performing This Modification, The Contractor Shall Notify The Co In Writing When The Costs It Expects To Incur For Work Listed In This Modification Will Exceed 50 Percent Of The Cost, (Nte Price), Of The Modification. No Work, Listed In This Modification, Shall Be Completed Or Invoiced That Will Exceed 80 Percent Of The Cost Of The Modification. The Contractor Shall Not Bill For More Than 80 Percent Of The Nte Amount Of This Modification Unless Authorized By A Subsequent Modification To The Contract. The Government Is Not Liable For Costs Incurred In Excess Of The Nte Amount Of This Modification. Final Contract Period Of Performance Date Remains As 03/21/2021 All Work Is To Be Completed In Accordance With All Applicable Contract Requirements, Regulations And Standards. Settlement Of This Change Will Include All Associated Costs, Direct And Indirect, Impact And Delay. All Terms And Conditions Remain In Full Force And Effect.
- Pbs Ncr Capital Construction Ctr 2
- General Services Administration (Gsa)
- $338,097,672.17
- General Services Administration (Gsa)
- GS11P06MKC0030
- Various Ces Credit, Bulletin 59, Fitness Center Water Infiltration Courtyard, Etc.
- 17 Jun 2020
- Various Ces Credit, Bulletin 59, Fitness Center Water Infiltration Courtyard, Etc.
- Pbs Ncr Ofc Of Acquisition Mgmt
- General Services Administration (Gsa)
- $340,896,271.17
- General Services Administration (Gsa)
- GS11P06MKC0030
- Gs11p06mkc0030 Cmc Services For The Department Of Commerce Modernization Wash Dc Mod Psm4 Various Phase 4 Miscellaneous Ces The Contractor's Signature In Block 15B Indicates His Agreement To Perform The Scopes Of Work As Detailed On The Various Miscellaneous Phase 4 Ces As An Aggregate Add To The Contract In The Amount Of $90,300.00. This Mod Has No Effect On Contract Completion Date. No Time Extension Is Granted. In Accordance With Far 52.243 Changes (Fixed Price), You Are Hereby Authorized To Proceed With The Following Miscellaneous Ces (Refer To Actual Ces And Schedule Lines): Clin 466 Ce 4-213 P4.0792 - Phase 4 - Replace 15 Type R (Pendant) Lighting Fixtures Specified In B 50/51 With Type R1 (Flush) Ggjv Proposal Dated 05/29/18 Add $28,294.00 Clin 467 Ce 4-225 - Phase 4 - Basement Corr 0 Raise Existing Fa $10,931 - Funded By Allowance Ggjv Proposal Dated 07/31/18 Clin 468 Ce 4-234 P4.0393 - Phase 4 - Cove Light In Typical Men's Restroom $3,679 - Funded By Allowance Ggjv Proposal Dated 08/07/18 Clin 469 Ce 4-236 P4/0793 - Phase 4 - Dovas Pre-Heat Coil Pumps $4,160 - Funded By Allowance Ggjv Proposal Dated 08/14/18 Clin 470 Ce 4-239 P4.0730 - Phase 4 - Blast Door Hardware For Opening 1V06 17032 - $17,032 - Funded By Contingency Ggjv Proposal Dated 08/30/18 Clin 471 Ce 4-240 P4.0851 - Phase 4 - Terminate Fiber Backbone With Lc Connectors Ggjv Proposal Dated 08/28/18 Add $62,006.00 Clin 472 Ce 4-241 P4.0685 - Phase 4 - 1St Floor Historic Restroom Ceilings - $6,507 - Funded By Contingency Ggjv Proposal Dated 08/29/18 Clin 473 Phase 3 - Master Control Panel For Vehicle Barriers - Change Funding Rwa From B0546807 To N1796478 - Clin# 0432 - Psl9 Contract Completion Date Remains As 03/21/2021. All Work Is To Be Accomplished In Accordance With All Applicable Requirements, Regulations, And Standards. Settlement Of This Change Includes All Associated Costs, Direct And Indirect, Impact And Delay. All Terms And Conditions Remain In Full Force And Effect.
- 18 Sep 2018
- Gs11p06mkc0030 Cmc Services For The Department Of Commerce Modernization Wash Dc Mod Psm4 Various Phase 4 Miscellaneous Ces The Contractor's Signature In Block 15B Indicates His Agreement To Perform The Scopes Of Work As Detailed On The Various Miscellaneous Phase 4 Ces As An Aggregate Add To The Contract In The Amount Of $90,300.00. This Mod Has No Effect On Contract Completion Date. No Time Extension Is Granted. In Accordance With Far 52.243 Changes (Fixed Price), You Are Hereby Authorized To Proceed With The Following Miscellaneous Ces (Refer To Actual Ces And Schedule Lines): Clin 466 Ce 4-213 P4.0792 - Phase 4 - Replace 15 Type R (Pendant) Lighting Fixtures Specified In B 50/51 With Type R1 (Flush) Ggjv Proposal Dated 05/29/18 Add $28,294.00 Clin 467 Ce 4-225 - Phase 4 - Basement Corr 0 Raise Existing Fa $10,931 - Funded By Allowance Ggjv Proposal Dated 07/31/18 Clin 468 Ce 4-234 P4.0393 - Phase 4 - Cove Light In Typical Men's Restroom $3,679 - Funded By Allowance Ggjv Proposal Dated 08/07/18 Clin 469 Ce 4-236 P4/0793 - Phase 4 - Dovas Pre-Heat Coil Pumps $4,160 - Funded By Allowance Ggjv Proposal Dated 08/14/18 Clin 470 Ce 4-239 P4.0730 - Phase 4 - Blast Door Hardware For Opening 1V06 17032 - $17,032 - Funded By Contingency Ggjv Proposal Dated 08/30/18 Clin 471 Ce 4-240 P4.0851 - Phase 4 - Terminate Fiber Backbone With Lc Connectors Ggjv Proposal Dated 08/28/18 Add $62,006.00 Clin 472 Ce 4-241 P4.0685 - Phase 4 - 1St Floor Historic Restroom Ceilings - $6,507 - Funded By Contingency Ggjv Proposal Dated 08/29/18 Clin 473 Phase 3 - Master Control Panel For Vehicle Barriers - Change Funding Rwa From B0546807 To N1796478 - Clin# 0432 - Psl9 Contract Completion Date Remains As 03/21/2021. All Work Is To Be Accomplished In Accordance With All Applicable Requirements, Regulations, And Standards. Settlement Of This Change Includes All Associated Costs, Direct And Indirect, Impact And Delay. All Terms And Conditions Remain In Full Force And Effect.
- Pbs Ncr Capital Construction Ctr 2
- General Services Administration (Gsa)
- $337,517,379.17
- General Services Administration (Gsa)
- GS11P06MKC0030
- Gs11p06mkc0030 Cmc Services For The Department Of Commerce Modernization Wash Dc Mod Psm7 Miscellaneous Ces For Phase 4 The Contractor's Signature In Block 15B Indicates His Agreement To Perform The Scope Of Work As Detailed On The Various Miscellaneous Ces As An Aggregate Add To The Contract In The Amount Of $21,962.00. This Mod Has No Effect On Contract Completion Date. No Time Extension Is Granted. Completion Date Remains As 03/21/2021. In Accordance With Far 52.243 - Changes (Fixed Price) In Your Contract, You Are Hereby Authorized To Proceed With The Following Ces (Refer To Individual Detailed Ces): Clin 0486 Ce 4-116 Add $5,500.00 Clin 0487 Ce 4-153 $0 Clin 0488 Ce 4-188 Credit $16,197.00 Clin 0489 Ce 4-229 $0 Clin 0490 Ce 4-232 $0 Clin 0491 Ce 4-237 $0 Clin 0492 Ce 4-246 $0 Clin 0493 Ce 4-251 R1 Add $8,117.00 Clin 0494 Ce 4- 253 $0 Clin 0495 Ce 4- 255 Add $22,858.00 Clin 0496 Ce 4-257 $0 Clin 0497 Ce 4-262 $0 Clin 0498 Ce 4-263 $0 Clin 0499 Ce 4-264 $0 Clin 0500 Ce 4-266 $0 Clin 0501 Ce 4-271 $0 Clin 0502 Ce 4-273 $0 Clin 0503 Ce 4-274 Add $1,684.00 Clin 0504 Ce 4-276 $0 Clin 0505 Ce 4-277 $0 Clin 0506 Ce 4-278 $0 Clin 0507 Ce 4-287 $0 Clin 0508 Ce 4-287R1 $0 Final Contract Period Of Performance End Date Remains As 03/21/2021. All Work Is To Be Completed In Accordance With All Applicable Contract Requirements, Regulations And Standards. Settlement Of This Change Includes All Associates Costs, Direct And Indirect, Impact And Delay. All Terms And Conditions Remain In Full Force And Effect.
- 23 Apr 2019
- Gs11p06mkc0030 Cmc Services For The Department Of Commerce Modernization Wash Dc Mod Psm7 Miscellaneous Ces For Phase 4 The Contractor's Signature In Block 15B Indicates His Agreement To Perform The Scope Of Work As Detailed On The Various Miscellaneous Ces As An Aggregate Add To The Contract In The Amount Of $21,962.00. This Mod Has No Effect On Contract Completion Date. No Time Extension Is Granted. Completion Date Remains As 03/21/2021. In Accordance With Far 52.243 - Changes (Fixed Price) In Your Contract, You Are Hereby Authorized To Proceed With The Following Ces (Refer To Individual Detailed Ces): Clin 0486 Ce 4-116 Add $5,500.00 Clin 0487 Ce 4-153 $0 Clin 0488 Ce 4-188 Credit $16,197.00 Clin 0489 Ce 4-229 $0 Clin 0490 Ce 4-232 $0 Clin 0491 Ce 4-237 $0 Clin 0492 Ce 4-246 $0 Clin 0493 Ce 4-251 R1 Add $8,117.00 Clin 0494 Ce 4- 253 $0 Clin 0495 Ce 4- 255 Add $22,858.00 Clin 0496 Ce 4-257 $0 Clin 0497 Ce 4-262 $0 Clin 0498 Ce 4-263 $0 Clin 0499 Ce 4-264 $0 Clin 0500 Ce 4-266 $0 Clin 0501 Ce 4-271 $0 Clin 0502 Ce 4-273 $0 Clin 0503 Ce 4-274 Add $1,684.00 Clin 0504 Ce 4-276 $0 Clin 0505 Ce 4-277 $0 Clin 0506 Ce 4-278 $0 Clin 0507 Ce 4-287 $0 Clin 0508 Ce 4-287R1 $0 Final Contract Period Of Performance End Date Remains As 03/21/2021. All Work Is To Be Completed In Accordance With All Applicable Contract Requirements, Regulations And Standards. Settlement Of This Change Includes All Associates Costs, Direct And Indirect, Impact And Delay. All Terms And Conditions Remain In Full Force And Effect.
- Pbs Ncr Capital Construction Ctr 2
- General Services Administration (Gsa)
- $338,020,420.17
- General Services Administration (Gsa)
- GS11P06MKC0030
- Definitize Various Pdl Directives Adjust Ceilings, Provide Bulkhead Fitness Center Area, 2 Replacement Graham Window In Basement
- 14 Sep 2020
- Definitize Various Pdl Directives Adjust Ceilings, Provide Bulkhead Fitness Center Area, 2 Replacement Graham Window In Basement
- Pbs Ncr Ofc Of Acquisition Mgmt
- General Services Administration (Gsa)
- $341,058,144.17
- General Services Administration (Gsa)
- GS11P06MKC0030
- Pdl Nte Bulletin 68 Gen Cond 50 Percent
- 17 Mar 2020
- Pdl Nte Bulletin 68 Gen Cond 50 Percent
- Pbs Ncr Capital Construction Ctr 2
- General Services Administration (Gsa)
- $339,248,266.17
- General Services Administration (Gsa)
- GS11P06MKC0030
- Pdl Bulletin 68 Fitness Center Design Trench Layout And Surveying, Design And Plan For Dewatering And Shoring, Mep Coordinated Drawings To Include Mechanical And Plumbing Changes
- 4 Nov 2019
- Pdl Bulletin 68 Fitness Center Design Trench Layout And Surveying, Design And Plan For Dewatering And Shoring, Mep Coordinated Drawings To Include Mechanical And Plumbing Changes
- Pbs Ncr Capital Construction Ctr 2
- General Services Administration (Gsa)
- $338,344,743.17
- General Services Administration (Gsa)
- GS11P06MKC0030
- Ph 4: Stair Pressure Louvers Pt 2, Waterproofing, Basement Corridor 8 Finishes N Of Ph4/5 Line, Transition Cable Tray/Wall Ph 3/4 Corridor 0
- 11 Mar 2021
- Ph 4: Stair Pressure Louvers Pt 2, Waterproofing, Basement Corridor 8 Finishes N Of Ph4/5 Line, Transition Cable Tray/Wall Ph 3/4 Corridor 0
- Pbs Ncr Ofc Of Acquisition Mgmt
- General Services Administration (Gsa)
- $341,416,754.17
- General Services Administration (Gsa)
- GS11P06MKC0030
- Provide Labor, Materials, Supervision, And Equipment To Relocate Fitness Center Lights
- 26 Jan 2021
- Provide Labor, Materials, Supervision, And Equipment To Relocate Fitness Center Lights
- Pbs Ncr Ofc Of Acquisition Mgmt
- General Services Administration (Gsa)
- $341,322,208.17
- General Services Administration (Gsa)
- GS11P06MKC0030
- Drain Pan And Pipe Above Womens Shower Stall In Fitness Area, Removal Of Construction Sign On 14Th And Penn
- 17 Feb 2021
- Drain Pan And Pipe Above Womens Shower Stall In Fitness Area, Removal Of Construction Sign On 14Th And Penn
- Pbs Ncr Ofc Of Acquisition Mgmt
- General Services Administration (Gsa)
- $341,333,884.17
- General Services Administration (Gsa)
- GS11P06MKC0030
- Contract Gs11p06mkc0030, Construction Manager As Constructor Cmc Services For The Hchb Major Modernization Project, Wash., Dc Modification Pam6: Unilateral, Non-Compensable Time Extension Effective With This Unilateral, Non-Compensable Time Extension Modification, The Period Of Performance For Phase 4 Base Contract Is Hereby Extended From July 2, 2018, To February 28, 2019 (241 Days) Final Contract Period Of Performance End Date Remains As 03/21/2021 All Work Is To Be Completed In Accordance With All Applicable Requirements, Regulations And Standards. All Terms And Conditions Remain In Full Force And Effect.
- 14 Mar 2019
- Contract Gs11p06mkc0030, Construction Manager As Constructor Cmc Services For The Hchb Major Modernization Project, Wash., Dc Modification Pam6: Unilateral, Non-Compensable Time Extension Effective With This Unilateral, Non-Compensable Time Extension Modification, The Period Of Performance For Phase 4 Base Contract Is Hereby Extended From July 2, 2018, To February 28, 2019 (241 Days) Final Contract Period Of Performance End Date Remains As 03/21/2021 All Work Is To Be Completed In Accordance With All Applicable Requirements, Regulations And Standards. All Terms And Conditions Remain In Full Force And Effect.
- Pbs Ncr Capital Construction Ctr 2
- General Services Administration (Gsa)
- $337,998,458.17
- General Services Administration (Gsa)
- GS11P06MKC0030
- Section 889
- 20 Mar 2020
- Section 889
- Pbs Ncr Capital Construction Ctr 2
- General Services Administration (Gsa)
- $339,248,266.17
- General Services Administration (Gsa)
- GS11P06MKC0030
- Ce 4-336 Steam Vent Insulation Ce 4-337 Fitness Center Lavatory Faucets
- 22 Oct 2020
- Ce 4-336 Steam Vent Insulation Ce 4-337 Fitness Center Lavatory Faucets
- Pbs Ncr Ofc Of Acquisition Mgmt
- General Services Administration (Gsa)
- $341,222,388.17
- General Services Administration (Gsa)