Mitch Gray, Inc.
Dba Mitch Gray Inc
CAGE Code: 4N5E7
NCAGE Code: 4N5E7
Status: Active
Type: Commercial Supplier
Dun & Bradstreet (DUNS): 790770734
Summary
Mitch Gray, Inc., Dba Mitch Gray Inc is an Active Commercial Supplier with the Cage Code 4N5E7 and is tracked by Dun & Bradstreet under DUNS Number 790770734..
Address
710 Del Guzzi Dr Apt 202
Port Angeles WA 98362-8973
United States
Points of Contact
No Points of Contact...
Related Information
People who viewed this 'CAGE Code' also viewed...
Pen And Palette Unlimited L And L Tool Specialties Inc Dizard Ltd Magna Force Inc Arrow Launch Service Inc Lincoln Welding Inc Teuton Enterprise Llc Washington Fire And Safety Sofie Darien B Aldergrove Construction Inc. Metem Llc Foster Associates Lincoln Industries Inc Angeles Millwork And Lumber Co Inc Olympic Paper Co Inc Universal Maintenance Services Salish Excavation And Trucking Llc C Tech Nikodym Trucking Goin Rick
Frequently Asked Questions (FAQ) for CAGE 4N5E7
- What is CAGE Code 4N5E7?
- 4N5E7 is the unique identifier used by NATO Organizations to reference the physical entity known as Mitch Gray, Inc. Dba Mitch Gray Inc located at 710 Del Guzzi Dr Apt 202, Port Angeles WA 98362-8973, United States.
- Who is CAGE Code 4N5E7?
- 4N5E7 refers to Mitch Gray, Inc. Dba Mitch Gray Inc located at 710 Del Guzzi Dr Apt 202, Port Angeles WA 98362-8973, United States.
- Where is CAGE Code 4N5E7 Located?
- CAGE Code 4N5E7 is located in Port Angeles, WA, USA.
Contracting History for CAGE 4N5E7 Most Recent 25 Records
- 140P8318C0015
- Other, Modification 6: De-Obligate $0.01 From Clin90 To Prepare For Contract Close-Out. Modification 5: Extend Completion Date To Accommodate Longer Lead Time For Signage To Be Manufactured/Shipped And Then Contractor Will Install. Modification 4: Ad
- 17 Sep 2020
- Other, Modification 6: De-Obligate $0.01 From Clin90 To Prepare For Contract Close-Out. Modification 5: Extend Completion Date To Accommodate Longer Lead Time For Signage To Be Manufactured/Shipped And Then Contractor Will Install. Modification 4: Ad
- Pwr Olym Mabo(83000)
- Department Of The Interior (Doi)
- $1,599,472.07
- Department Of The Interior (Doi)
- 140P8318C0015
- Other, Modification #1: Additional Work Within Scope And Extend Completion Date. Original Description: Demolition And Removal Of Structures, Pilings, Docks, Olym ("Other" Signifies Use Of Green Methods In Contract For Recycling Demolished C
- 9 Jul 2019
- Other, Modification #1: Additional Work Within Scope And Extend Completion Date. Original Description: Demolition And Removal Of Structures, Pilings, Docks, Olym ("Other" Signifies Use Of Green Methods In Contract For Recycling Demolished C
- Pwr Olym Mabo(83000)
- Department Of The Interior (Doi)
- $1,515,828.23
- Department Of The Interior (Doi)
- 140P8318C0015
- Other, Modification 002: Additional Work Within Scope And Extend Completion Date. Modification 001: Additional Work Within Scope And Extend Completion Date. Original Description: Demolition And Removal Of Structures, Pilings, Docks, Olym ("Other
- 4 Feb 2020
- Other, Modification 002: Additional Work Within Scope And Extend Completion Date. Modification 001: Additional Work Within Scope And Extend Completion Date. Original Description: Demolition And Removal Of Structures, Pilings, Docks, Olym ("Other
- Pwr Olym Mabo(83000)
- Department Of The Interior (Doi)
- $1,569,458.23
- Department Of The Interior (Doi)
- 140P8318C0015
- Other, Modification #3: Additional Work Within Scope At Project Site 4 (Additional Pit Run Rock Needed). Modification 002: Additional Work Within Scope And Extend Completion Date. Modification 001: Additional Work Within Scope And Extend Completion D
- 6 Apr 2020
- Other, Modification #3: Additional Work Within Scope At Project Site 4 (Additional Pit Run Rock Needed). Modification 002: Additional Work Within Scope And Extend Completion Date. Modification 001: Additional Work Within Scope And Extend Completion D
- Pwr Olym Mabo(83000)
- Department Of The Interior (Doi)
- $1,573,382.08
- Department Of The Interior (Doi)
- 140P8318P0113
- Igf::Ot::Igf, Service, Olym-Kenworth Chassis Modification
- 24 Sep 2018
- Igf::Ot::Igf, Service, Olym-Kenworth Chassis Modification
- Pwr Olym Mabo(83000)
- Department Of The Interior (Doi)
- $55,311.00
- Department Of The Interior (Doi)
- 140P8318C0015
- Igf::Ot::Igf, Other, Demolition And Removal Of Structures, Pilings, Docks, Olym ("Other" Signifies Use Of Green Methods In Contract For Recycling Demolished Concrete And Asphalt)
- 10 Sep 2018
- Igf::Ot::Igf, Other, Demolition And Removal Of Structures, Pilings, Docks, Olym ("Other" Signifies Use Of Green Methods In Contract For Recycling Demolished Concrete And Asphalt)
- Pwr Olym Mabo(83000)
- Department Of The Interior (Doi)
- $1,599,472.07
- Department Of The Interior (Doi)
- 140P8318C0015
- Other, Modification 5: Extend Completion Date To Accommodate Longer Lead Time For Signage To Be Manufactured/Shipped And Then Contractor Will Install. Modification 4: Additional Work Within Scope At Project Site 4 (Site Work, Sign Installation, To Al
- 19 Aug 2020
- Other, Modification 5: Extend Completion Date To Accommodate Longer Lead Time For Signage To Be Manufactured/Shipped And Then Contractor Will Install. Modification 4: Additional Work Within Scope At Project Site 4 (Site Work, Sign Installation, To Al
- Pwr Olym Mabo(83000)
- Department Of The Interior (Doi)
- $1,599,472.08
- Department Of The Interior (Doi)
- 140P8318C0015
- Other, Modification #4: Additional Work Within Scope At Project Site 4 (Site Work, Sign Installation, To Alter Site To Madrona Beach Picnic Area) And Extend Completion Date. Modification #3: Additional Work Within Scope At Project Site 4 (Additional
- 19 May 2020
- Other, Modification #4: Additional Work Within Scope At Project Site 4 (Site Work, Sign Installation, To Alter Site To Madrona Beach Picnic Area) And Extend Completion Date. Modification #3: Additional Work Within Scope At Project Site 4 (Additional
- Pwr Olym Mabo(83000)
- Department Of The Interior (Doi)
- $1,599,472.08
- Department Of The Interior (Doi)