Mitch Gray, Inc.
Dba Mitch Gray Inc

CAGE Code: 4N5E7

NCAGE Code: 4N5E7

Status: Active

Type: Commercial Supplier

Dun & Bradstreet (DUNS): 790770734

Summary

Mitch Gray, Inc., Dba Mitch Gray Inc is an Active Commercial Supplier with the Cage Code 4N5E7 and is tracked by Dun & Bradstreet under DUNS Number 790770734..

Address

710 Del Guzzi Dr Apt 202
Port Angeles WA 98362-8973
United States

Points of Contact

No Points of Contact...

Related Information

Associated CAGE Codes People who viewed this 'CAGE Code' also viewed...

CAGE Code FAQ Frequently Asked Questions (FAQ) for CAGE 4N5E7

What is CAGE Code 4N5E7?
4N5E7 is the unique identifier used by NATO Organizations to reference the physical entity known as Mitch Gray, Inc. Dba Mitch Gray Inc located at 710 Del Guzzi Dr Apt 202, Port Angeles WA 98362-8973, United States.
Who is CAGE Code 4N5E7?
4N5E7 refers to Mitch Gray, Inc. Dba Mitch Gray Inc located at 710 Del Guzzi Dr Apt 202, Port Angeles WA 98362-8973, United States.
Where is CAGE Code 4N5E7 Located?
CAGE Code 4N5E7 is located in Port Angeles, WA, USA.

Contracting History for CAGE 4N5E7 Contracting History for CAGE 4N5E7 Most Recent 25 Records

140P8318C0015
Other, Modification 6: De-Obligate $0.01 From Clin90 To Prepare For Contract Close-Out. Modification 5: Extend Completion Date To Accommodate Longer Lead Time For Signage To Be Manufactured/Shipped And Then Contractor Will Install. Modification 4: Ad
17 Sep 2020
Pwr Olym Mabo(83000)
Department Of The Interior (Doi)
$1,599,472.07
140P8318C0015
Other, Modification #1: Additional Work Within Scope And Extend Completion Date. Original Description: Demolition And Removal Of Structures, Pilings, Docks, Olym ("Other" Signifies Use Of Green Methods In Contract For Recycling Demolished C
9 Jul 2019
Pwr Olym Mabo(83000)
Department Of The Interior (Doi)
$1,515,828.23
140P8318C0015
Other, Modification 002: Additional Work Within Scope And Extend Completion Date. Modification 001: Additional Work Within Scope And Extend Completion Date. Original Description: Demolition And Removal Of Structures, Pilings, Docks, Olym ("Other
4 Feb 2020
Pwr Olym Mabo(83000)
Department Of The Interior (Doi)
$1,569,458.23
140P8318C0015
Other, Modification #3: Additional Work Within Scope At Project Site 4 (Additional Pit Run Rock Needed). Modification 002: Additional Work Within Scope And Extend Completion Date. Modification 001: Additional Work Within Scope And Extend Completion D
6 Apr 2020
Pwr Olym Mabo(83000)
Department Of The Interior (Doi)
$1,573,382.08
140P8318P0113
Igf::Ot::Igf, Service, Olym-Kenworth Chassis Modification
24 Sep 2018
Pwr Olym Mabo(83000)
Department Of The Interior (Doi)
$55,311.00
140P8318C0015
Igf::Ot::Igf, Other, Demolition And Removal Of Structures, Pilings, Docks, Olym ("Other" Signifies Use Of Green Methods In Contract For Recycling Demolished Concrete And Asphalt)
10 Sep 2018
Pwr Olym Mabo(83000)
Department Of The Interior (Doi)
$1,599,472.07
140P8318C0015
Other, Modification 5: Extend Completion Date To Accommodate Longer Lead Time For Signage To Be Manufactured/Shipped And Then Contractor Will Install. Modification 4: Additional Work Within Scope At Project Site 4 (Site Work, Sign Installation, To Al
19 Aug 2020
Pwr Olym Mabo(83000)
Department Of The Interior (Doi)
$1,599,472.08
140P8318C0015
Other, Modification #4: Additional Work Within Scope At Project Site 4 (Site Work, Sign Installation, To Alter Site To Madrona Beach Picnic Area) And Extend Completion Date. Modification #3: Additional Work Within Scope At Project Site 4 (Additional
19 May 2020
Pwr Olym Mabo(83000)
Department Of The Interior (Doi)
$1,599,472.08