K & J Services, Inc
CAGE Code: 4DRQ3
NCAGE Code: 4DRQ3
Status: Active
Type: Commercial Supplier
Dun & Bradstreet (DUNS): 623987208
Summary
K & J Services, Inc is an Active Commercial Supplier with the Cage Code 4DRQ3 and is tracked by Dun & Bradstreet under DUNS Number 623987208..
Address
470 Sodbuster Rd
Turner MT 59542-9623
United States
Points of Contact
- Telephone:
- 4063792224
- Fax:
- 4063792224
Related Information
People who viewed this 'CAGE Code' also viewed...
Mechanical Insulation Services River Resources Inc Forest For The Future Inc. School Administrative District 52 Cote Bros Co. B & P Covenant Construction Co Inc Acton Foodservices Burkland Lumber Co Acadia Contractors Turner Gravel Inc. Hunt Jessie T Buck Construction Inc Burkeland Lumber Co Decade Engineering Cascade School District 5 Clatsop Nehalem Confederated Tribes Harvey Mohrenweiser United Piping & Welding Inc Integrated Forest Management Bell Photographic Inc
Frequently Asked Questions (FAQ) for CAGE 4DRQ3
- What is CAGE Code 4DRQ3?
- 4DRQ3 is the unique identifier used by NATO Organizations to reference the physical entity known as K & J Services, Inc located at 470 Sodbuster Rd, Turner MT 59542-9623, United States.
- Who is CAGE Code 4DRQ3?
- 4DRQ3 refers to K & J Services, Inc located at 470 Sodbuster Rd, Turner MT 59542-9623, United States.
- Where is CAGE Code 4DRQ3 Located?
- CAGE Code 4DRQ3 is located in Turner, MT, USA.
Contracting History for CAGE 4DRQ3 Most Recent 25 Records
- 47PJ0020P0032
- Replace Heaters In The Pump House (2) At The Turner Land Port Of Entry/Climax Border Station, Highway 241 At Canadian Border, Turner, Montana 59542.
- 30 Jan 2020
- Replace Heaters In The Pump House (2) At The Turner Land Port Of Entry/Climax Border Station, Highway 241 At Canadian Border, Turner, Montana 59542.
- Pbs R8
- General Services Administration (Gsa)
- $3,825.80
- General Services Administration (Gsa)
- GS08P16VGC7002
- Modification (Po05) - Extend Full Maintenance Services (To Include Custodial, Mechanical&Snow Removal) At The Turner Land Port Of Entry/Climax Border Station, Turner, Montana 59542. 3 Months (11/1/19 Through 1/31/20).
- 10 Oct 2019
- Modification (Po05) - Extend Full Maintenance Services (To Include Custodial, Mechanical&Snow Removal) At The Turner Land Port Of Entry/Climax Border Station, Turner, Montana 59542. 3 Months (11/1/19 Through 1/31/20).
- Pbs R8
- General Services Administration (Gsa)
- $351,990.00
- General Services Administration (Gsa)
- GS08P16VGC7002
- Modification Po06 - Extend Full Maintenance Serivces (To Include Custodial, Mechanical, Grounds Maintenance&Snow Removal) At The Turner Land Port Of Entry/Climax Border Station, Turner, Montana 59542.
- 22 Jan 2020
- Modification Po06 - Extend Full Maintenance Serivces (To Include Custodial, Mechanical, Grounds Maintenance&Snow Removal) At The Turner Land Port Of Entry/Climax Border Station, Turner, Montana 59542.
- Pbs R8
- General Services Administration (Gsa)
- $378,000.00
- General Services Administration (Gsa)
- 47PJ0020P0031
- Emergency Sewer Line And Drywall Repairs At The Turner Land Port Of Entry/Climax Border Station, Highway 241 At Canadian Border, Turner, Montana 59542.
- 29 Jan 2020
- Emergency Sewer Line And Drywall Repairs At The Turner Land Port Of Entry/Climax Border Station, Highway 241 At Canadian Border, Turner, Montana 59542.
- Pbs R8
- General Services Administration (Gsa)
- $7,666.10
- General Services Administration (Gsa)
- 47PJ0019P0170
- Sewer Line Repairs - Turner Land Port Of Entry/Climax Border Station, Highway 241 At Canadian Border, Turner, Montana 59542.
- 8 Sep 2019
- Sewer Line Repairs - Turner Land Port Of Entry/Climax Border Station, Highway 241 At Canadian Border, Turner, Montana 59542.
- Pbs R8
- General Services Administration (Gsa)
- $2,013.10
- General Services Administration (Gsa)
- 47PJ0020P0007
- Drywall/Sheet Rock Repairs In The Basement At The Turner Land Port Of Entry/Climax Border Station, Highway 241 At Canadian Border, Turner, Montana 59542.
- 20 Nov 2019
- Drywall/Sheet Rock Repairs In The Basement At The Turner Land Port Of Entry/Climax Border Station, Highway 241 At Canadian Border, Turner, Montana 59542.
- Pbs R8
- General Services Administration (Gsa)
- $7,260.00
- General Services Administration (Gsa)
- 47PJ0020P0118
- Provide All Labor, Equipment, Supplies, Materials And Supervision To Perform Detailed Deep Cleaning And Disinfecting Of The Entire Port At Turner Lpoe, Located At Hwy 241 North At Can Brdr, Turner, Mt 59542, As Per The Covid Blue Scope Of Work.
- 16 Jul 2020
- Provide All Labor, Equipment, Supplies, Materials And Supervision To Perform Detailed Deep Cleaning And Disinfecting Of The Entire Port At Turner Lpoe, Located At Hwy 241 North At Can Brdr, Turner, Mt 59542, As Per The Covid Blue Scope Of Work.
- Pbs R8
- General Services Administration (Gsa)
- $4,500.00
- General Services Administration (Gsa)
- GS08P16VGC7002
- Modification (Po03) - Extend Full Maintenance Services (To Include Custodial, Mechanical&Grounds Maintenance) 3 Months - 5/1/19 Through 7/31/19.
- 8 Apr 2019
- Modification (Po03) - Extend Full Maintenance Services (To Include Custodial, Mechanical&Grounds Maintenance) 3 Months - 5/1/19 Through 7/31/19.
- Pbs R8
- General Services Administration (Gsa)
- $299,970.00
- General Services Administration (Gsa)
- 47PJ0018P0199
- Modification (Ps0001) - Extend Completion Date From 11/6/18 To 5/31/19. This Is Due To Weather Conditions. De-Obligation Of Funds Needed On Clin 0001 Of (-)$385.00 From $21,521.50 To $21,136.50 (Total Contract Price Change From $46,409.00 To $46,024.00). This Is Due To The Cistern Cleaning Price Came In Cheaper Than Originally Anticipated. All Other Terms And Conditions Remain Unchanged.
- 3 Apr 2019
- Modification (Ps0001) - Extend Completion Date From 11/6/18 To 5/31/19. This Is Due To Weather Conditions. De-Obligation Of Funds Needed On Clin 0001 Of (-)$385.00 From $21,521.50 To $21,136.50 (Total Contract Price Change From $46,409.00 To $46,024.00). This Is Due To The Cistern Cleaning Price Came In Cheaper Than Originally Anticipated. All Other Terms And Conditions Remain Unchanged.
- Pbs R8
- General Services Administration (Gsa)
- $46,024.00
- General Services Administration (Gsa)
- 47PJ0018P0199
- Modification (Po0002) - De-Obligation Of Funds Needed On Clin 0001 Of (-)$1,628.00 From $21,136.50 To $19,508.50 (Total Contract Price Change To $44,396.00). This Is Due To The Cistern Cleaning Being Taken Out Of The Contract. All Other Terms And Conditions Remain Unchanged.
- 31 Dec 2019
- Modification (Po0002) - De-Obligation Of Funds Needed On Clin 0001 Of (-)$1,628.00 From $21,136.50 To $19,508.50 (Total Contract Price Change To $44,396.00). This Is Due To The Cistern Cleaning Being Taken Out Of The Contract. All Other Terms And Conditions Remain Unchanged.
- Pbs R8
- General Services Administration (Gsa)
- $44,396.00
- General Services Administration (Gsa)
- GS08P16VGC7002
- Modification (Po04) - Extend Full Maintenance Services (To Include Custodial, Mechanical, Grounds Maintenance&Snow Removal) At The Turner Lpoe/Climax Border Station, Turner, Montana 59542.
- 15 Jul 2019
- Modification (Po04) - Extend Full Maintenance Services (To Include Custodial, Mechanical, Grounds Maintenance&Snow Removal) At The Turner Lpoe/Climax Border Station, Turner, Montana 59542.
- Pbs R8
- General Services Administration (Gsa)
- $325,980.00
- General Services Administration (Gsa)
- GS08P16VGC7002
- Extension - 2 Months - Turner Land Port Of Entry, Turner, Montana 59542 - Operations And Maintenance Services Contract - 5/1/20 - 6/30/20
- 30 Mar 2020
- Extension - 2 Months - Turner Land Port Of Entry, Turner, Montana 59542 - Operations And Maintenance Services Contract - 5/1/20 - 6/30/20
- Pbs R8
- General Services Administration (Gsa)
- $395,340.00
- General Services Administration (Gsa)
- GS08P16VGC7002
- Modification (Ps08) - Needed To Address Additional Cleaning Requirements Due To Covid-19 For The Period Of 6/1/20 Through 8/31/20. This Modification Also Extends Services To 8/31/20. Total Contract Price Change Is (+)$18,645.00 From $395,340.00 To $413,985.00. All Other Terms And Conditions Remain Unchanged.
- 1 Jul 2020
- Modification (Ps08) - Needed To Address Additional Cleaning Requirements Due To Covid-19 For The Period Of 6/1/20 Through 8/31/20. This Modification Also Extends Services To 8/31/20. Total Contract Price Change Is (+)$18,645.00 From $395,340.00 To $413,985.00. All Other Terms And Conditions Remain Unchanged.
- Pbs R8
- General Services Administration (Gsa)
- $413,985.00
- General Services Administration (Gsa)
- 47PJ0018P0199
- Water System Upgrades&Irrigation Repairs At The Turner Land Port Of Entry/Climax Border Station, Montana.
- 6 Sep 2018
- Water System Upgrades&Irrigation Repairs At The Turner Land Port Of Entry/Climax Border Station, Montana.
- Pbs R8
- General Services Administration (Gsa)
- $44,396.00
- General Services Administration (Gsa)