Wmb Financial Solutions
Dba Wmb General Contractors
Div Wmb General Contractors
CAGE Code: 4AMA6
NCAGE Code: 4AMA6
Status: Active
Type: Commercial Supplier
Dun & Bradstreet (DUNS): 362736873
Summary
Wmb Financial Solutions, Dba Wmb General Contractors, Div Wmb General Contractors is an Active Commercial Supplier with the Cage Code 4AMA6 and is tracked by Dun & Bradstreet under DUNS Number 362736873..
Address
9414 Goodman Ct
Elk Grove CA 95624-6048
United States
Points of Contact
Related Information
People who viewed this 'CAGE Code' also viewed...
Vireon Solutions, Llc Holding Space Onitech Systems Solution Group, Inc. Pe Thor The Rental Research Assistant Agency Alldata Llc Capstone Orthopedic, Inc. Kaytec Products Inc Elk Grove Door And Hardware Anesthesia Plus Inc Orchid Coffee Service Miguel Angel Gutierrez Informant Communications Group Centerline Striping Company, Inc. Newtron Products Wedding George Publishing Pacific Coast Construction Svc, Inc Beacon Education Services Cornflower Farms, Inc Comprehensive Security Services Inc
Frequently Asked Questions (FAQ) for CAGE 4AMA6
- What is CAGE Code 4AMA6?
- 4AMA6 is the unique identifier used by NATO Organizations to reference the physical entity known as Wmb Financial Solutions Dba Wmb General Contractors Div Wmb General Contractors located at 9414 Goodman Ct, Elk Grove CA 95624-6048, United States.
- Who is CAGE Code 4AMA6?
- 4AMA6 refers to Wmb Financial Solutions Dba Wmb General Contractors Div Wmb General Contractors located at 9414 Goodman Ct, Elk Grove CA 95624-6048, United States.
- Where is CAGE Code 4AMA6 Located?
- CAGE Code 4AMA6 is located in Elk Grove, CA, USA.
Contracting History for CAGE 4AMA6 Most Recent 25 Records
- 47PK1219F0034
- Modification To Extend Period Of Performance. Vendor Waiting On Part From Manufacturer. Shea Federal Bldg. Santa Rosa, Ca - Ca0221zz
- 2 Apr 2020
- Modification To Extend Period Of Performance. Vendor Waiting On Part From Manufacturer. Shea Federal Bldg. Santa Rosa, Ca - Ca0221zz
- Pbs R9
- General Services Administration (Gsa)
- $97,764.25
- General Services Administration (Gsa)
- 47PK1218F0021
- This Modification Is Hereby Executed To Increase Clin 0002 By $5,241.60 Due To The Project Being Delayed And The Need For A Longer Rental Term. The Term Has Been Increased From 08/31/2018 To 09/31/2018. As A Result Of This Change, This Increases The Contract Price By $5,241.60 For A New Grand Total Of $36,691.20 All Other Terms And Conditions Remain Unchanged. In Consideration Of This Modification Agreed To Herein As Complete Equitable Adjustment, Wmb Financial Solutions, Of Oakland, Ca Hereby Releases The Government From Any And All Liability Under This Contract For Further Equitable Adjustments Attributed To Such Facts For Circumstances Giving Rise To The Supplemental Agreement. All Other Terms And Conditions Remain Unchanged.
- 17 Sep 2018
- This Modification Is Hereby Executed To Increase Clin 0002 By $5,241.60 Due To The Project Being Delayed And The Need For A Longer Rental Term. The Term Has Been Increased From 08/31/2018 To 09/31/2018. As A Result Of This Change, This Increases The Contract Price By $5,241.60 For A New Grand Total Of $36,691.20 All Other Terms And Conditions Remain Unchanged. In Consideration Of This Modification Agreed To Herein As Complete Equitable Adjustment, Wmb Financial Solutions, Of Oakland, Ca Hereby Releases The Government From Any And All Liability Under This Contract For Further Equitable Adjustments Attributed To Such Facts For Circumstances Giving Rise To The Supplemental Agreement. All Other Terms And Conditions Remain Unchanged.
- Pbs R9
- General Services Administration (Gsa)
- $36,691.20
- General Services Administration (Gsa)
- 47PK1218F0023
- Igf::Ct::Igf Replace Water Fountains @ 777 Sonoma Ave, Santa Rosa, Ca 95404
- 9 Mar 2018
- Igf::Ct::Igf Replace Water Fountains @ 777 Sonoma Ave, Santa Rosa, Ca 95404
- Pbs R9
- General Services Administration (Gsa)
- $22,465.00
- General Services Administration (Gsa)
- GS09P16KSD7154
- Wage Adj Option Ii Mod Ps04 Janitorial&Grounds Maintenance Services At Nara, Leo J. Ryan Federal Records Center, San Bruno Ca
- 31 Jul 2018
- Wage Adj Option Ii Mod Ps04 Janitorial&Grounds Maintenance Services At Nara, Leo J. Ryan Federal Records Center, San Bruno Ca
- Pbs R9 Acq Mgmt Recur Svcs
- General Services Administration (Gsa)
- $789,737.04
- General Services Administration (Gsa)
- 47PK1722F0025
- Patch And Replace Roof Leak At Coa, 125 S. Grand Ave., Pasadena, Ca.
- 21 Mar 2022
- Patch And Replace Roof Leak At Coa, 125 S. Grand Ave., Pasadena, Ca.
- Pbs R9 - Los Angeles Service Center
- General Services Administration (Gsa)
- $9,250.00
- General Services Administration (Gsa)
- 47PK1220F0029
- Replace Controller&Flow Switch On Boiler At Nara, Leo J Ryan Federal Building, San Bruno, Ca 94066 -- Ca0235zz.
- 29 Jul 2020
- Replace Controller&Flow Switch On Boiler At Nara, Leo J Ryan Federal Building, San Bruno, Ca 94066 -- Ca0235zz.
- Pbs R9
- General Services Administration (Gsa)
- $6,946.08
- General Services Administration (Gsa)
- 47PK1219F0006
- Igf::Ot::Igf Emergency Repair Of Heating Supply Two-Way Belimo Valve Leak Repair.
- 2 Jan 2019
- Igf::Ot::Igf Emergency Repair Of Heating Supply Two-Way Belimo Valve Leak Repair.
- Pbs R9
- General Services Administration (Gsa)
- $2,993.00
- General Services Administration (Gsa)
- 47PK1219F0013
- Modification To Extend Period Of Performance
- 30 Sep 2019
- Modification To Extend Period Of Performance
- Pbs R9
- General Services Administration (Gsa)
- $5,546.00
- General Services Administration (Gsa)
- GS09P16KSD7154
- General Intent: The Purpose Of This Modification Is To Incorporate The Increase From The Wage Adjustment Claim For The Option Lot 3 For The Janitorial And Related Services At The Leo J. Ryan Federal Records Center, 1000 Commodore Drive, San Bruno, Ca 94066
- 18 Sep 2019
- General Intent: The Purpose Of This Modification Is To Incorporate The Increase From The Wage Adjustment Claim For The Option Lot 3 For The Janitorial And Related Services At The Leo J. Ryan Federal Records Center, 1000 Commodore Drive, San Bruno, Ca 94066
- Pbs R9 Acq Mgmt Recur Svcs
- General Services Administration (Gsa)
- $1,069,600.80
- General Services Administration (Gsa)
- GS09P15KSD0028
- Project: Operations And Maintenance And Vte Maintenance Services At Leo J. Ryan Federal Records Center, San Bruno Ca. General Intent: This Modification Is Issued To Correct The Easi End Date To Reflect 8/31/2020 In Relation To Mod Po12.
- 3 Jun 2020
- Project: Operations And Maintenance And Vte Maintenance Services At Leo J. Ryan Federal Records Center, San Bruno Ca. General Intent: This Modification Is Issued To Correct The Easi End Date To Reflect 8/31/2020 In Relation To Mod Po12.
- Pbs R9 Acq Mgmt&Recur Svcs
- General Services Administration (Gsa)
- $2,328,045.66
- General Services Administration (Gsa)
- GS09P15KSD0011
- Wage Adjust Option 3, Santa Rosa Federal Federal Building
- 14 Aug 2018
- Wage Adjust Option 3, Santa Rosa Federal Federal Building
- Pbs R9 Acq Mgmt Recur Svcs
- General Services Administration (Gsa)
- $1,680,957.12
- General Services Administration (Gsa)
- 47PK1720F0088
- Ca9551zz- Replace Chiller 1 Condenser Butterfly Valve 125 S. Grand Ave Pasadena Ca
- 22 Sep 2020
- Ca9551zz- Replace Chiller 1 Condenser Butterfly Valve 125 S. Grand Ave Pasadena Ca
- Pbs R9 - Los Angeles Service Center
- General Services Administration (Gsa)
- $2,946.00
- General Services Administration (Gsa)
- 47PK2019F0014
- Mod Issued To Change The Contracting Officer From Sherry Hutchinson To Annie Vellepredit Due To Annie Received Her Rights To Sign.
- 11 Mar 2019
- Mod Issued To Change The Contracting Officer From Sherry Hutchinson To Annie Vellepredit Due To Annie Received Her Rights To Sign.
- Pbs R9
- General Services Administration (Gsa)
- $3,080.00
- General Services Administration (Gsa)
- 47PK2019F0038
- Repair Ism Board On Chiller #2
- 18 Jun 2019
- Repair Ism Board On Chiller #2
- Pbs R9
- General Services Administration (Gsa)
- $9,598.00
- General Services Administration (Gsa)
- 47PK2019F0038
- Nod Issued To Replace And Program Regulator Control Broad And Extend Completion Date
- 6 Aug 2019
- Nod Issued To Replace And Program Regulator Control Broad And Extend Completion Date
- Pbs R9
- General Services Administration (Gsa)
- $9,598.00
- General Services Administration (Gsa)
- 47PK1218C0006
- Igf::Cl:Igf A Modification Is Needed To Extend The Delivery Date, And Increase Clin 0002 By $3,800.00 Due To Include Surveyor Services To The Existing Ada Walkway Design. The Term Extension For The Delivery Date Is From 02/28/2018 To 06/30/2018. As A Result Of This Change, This Increases The Contract Price By $3,800.00 For A New Grand Total Of $14,528.00 @ @ 1000 Commodore Drive, San Bruno, Ca 94066
- 14 Mar 2018
- Igf::Cl:Igf A Modification Is Needed To Extend The Delivery Date, And Increase Clin 0002 By $3,800.00 Due To Include Surveyor Services To The Existing Ada Walkway Design. The Term Extension For The Delivery Date Is From 02/28/2018 To 06/30/2018. As A Result Of This Change, This Increases The Contract Price By $3,800.00 For A New Grand Total Of $14,528.00 @ @ 1000 Commodore Drive, San Bruno, Ca 94066
- Pbs R9
- General Services Administration (Gsa)
- $14,528.00
- General Services Administration (Gsa)
- 47PK1218F0025
- A Modification Is Needed To Extend The Delivery Date, Due To Repairing Water Leak On Roof. The Term Extension For The Delivery Date Is Changed From 09/30/2018 To 02/28/2019. As A Result Of This Change, The Grand Total Will Remain The Same Of $3,500.00. In Consideration Of This Modification Agreed To Herein As Complete Equitable Adjustment, Wmb Financial Solutions Of Oakland, Ca Hereby Releases The Government From Any And All Liability Under This Contract For Further Equitable Adjustments Attributable To Such Facts For Circumstances Giving Rise To This Supplemental Agreement. All Other Terms And Conditions Remain Unchanged.
- 4 Dec 2018
- A Modification Is Needed To Extend The Delivery Date, Due To Repairing Water Leak On Roof. The Term Extension For The Delivery Date Is Changed From 09/30/2018 To 02/28/2019. As A Result Of This Change, The Grand Total Will Remain The Same Of $3,500.00. In Consideration Of This Modification Agreed To Herein As Complete Equitable Adjustment, Wmb Financial Solutions Of Oakland, Ca Hereby Releases The Government From Any And All Liability Under This Contract For Further Equitable Adjustments Attributable To Such Facts For Circumstances Giving Rise To This Supplemental Agreement. All Other Terms And Conditions Remain Unchanged.
- Pbs R9
- General Services Administration (Gsa)
- $3,500.00
- General Services Administration (Gsa)
- 47PK1218F0045
- Igf::Ot::Igf North Parking Lot Lighting
- 31 Jul 2018
- Igf::Ot::Igf North Parking Lot Lighting
- Pbs R9
- General Services Administration (Gsa)
- $5,043.80
- General Services Administration (Gsa)
- 47PK1720F0037
- Bathroom Emergency Lighting Installation Ca9551rr 125 South Grand Avenue Pasadena, Ca 91105-1643
- 21 Apr 2020
- Bathroom Emergency Lighting Installation Ca9551rr 125 South Grand Avenue Pasadena, Ca 91105-1643
- Pbs R9 - Los Angeles Service Center
- General Services Administration (Gsa)
- $3,410.00
- General Services Administration (Gsa)
- 47PK1720F0085
- Ca9551zz- Replace Chiller 1 Condenser Butterfly Valve
- 8 Sep 2020
- Ca9551zz- Replace Chiller 1 Condenser Butterfly Valve
- Pbs R9 - Los Angeles Service Center
- General Services Administration (Gsa)
- $2,098.00
- General Services Administration (Gsa)
- GS09P15KSD0028
- The Purpose Of This Modification Is To Correct Mod Ps08 Description To Read As Follows: Pre-Negotiated Monthly Price Option Iv= $46,103.08 Original Award Amount Option Year Iv: $46,103.08 X 12 = $553,236.96 Total Annual Wage Adjustment Option Iii = $1,135.46 X 12 = $13,625.52 New Monthly Amount Option Year Iv = $46,103.08 + $1, 135.46 = $47,238.54 New Annual Amount Option Year Iv = $553,236.96 + $13,625.52 = $566,862.48 As A Result Of Modification Ps08, The Total Contract Price Is Increased By $566,862.48, From $2,099,619.56 To A Total Contract Value Of $2,666,482.04. All Other Terms And Conditions Of The Contract Remains Unchanged And In Full Force And Effect. Any Questions Regarding This Modification Shall Be Directed To Tania Ramsay At (415)522-3354.
- 13 May 2019
- The Purpose Of This Modification Is To Correct Mod Ps08 Description To Read As Follows: Pre-Negotiated Monthly Price Option Iv= $46,103.08 Original Award Amount Option Year Iv: $46,103.08 X 12 = $553,236.96 Total Annual Wage Adjustment Option Iii = $1,135.46 X 12 = $13,625.52 New Monthly Amount Option Year Iv = $46,103.08 + $1, 135.46 = $47,238.54 New Annual Amount Option Year Iv = $553,236.96 + $13,625.52 = $566,862.48 As A Result Of Modification Ps08, The Total Contract Price Is Increased By $566,862.48, From $2,099,619.56 To A Total Contract Value Of $2,666,482.04. All Other Terms And Conditions Of The Contract Remains Unchanged And In Full Force And Effect. Any Questions Regarding This Modification Shall Be Directed To Tania Ramsay At (415)522-3354.
- Pbs R9 Acq Mgmt Recur Svcs
- General Services Administration (Gsa)
- $2,186,330.04
- General Services Administration (Gsa)
- 47PK1218F0047
- Igf::Ot::Igf Relocate Instrusion Panel Alarm
- 2 Aug 2018
- Igf::Ot::Igf Relocate Instrusion Panel Alarm
- Pbs R9
- General Services Administration (Gsa)
- $3,577.20
- General Services Administration (Gsa)
- 47PK1218F0051
- Igf::Ot::Igf Replace Rubber Base Cove With Stainless Steel @ 1000 Commodore Dr, San Bruno, Ca 94066
- 7 Sep 2018
- Igf::Ot::Igf Replace Rubber Base Cove With Stainless Steel @ 1000 Commodore Dr, San Bruno, Ca 94066
- Pbs R9
- General Services Administration (Gsa)
- $9,046.55
- General Services Administration (Gsa)
- GS09P16KSD7154
- Implementation Of New Far Clause Section 889
- 23 Jan 2020
- Implementation Of New Far Clause Section 889
- Pbs R9 Acq Mgmt Recur Svcs
- General Services Administration (Gsa)
- $1,069,600.80
- General Services Administration (Gsa)
- 47PK1219F0033
- Modification To Add Section 889 To Contract.
- 21 Jan 2020
- Modification To Add Section 889 To Contract.
- Pbs R9
- General Services Administration (Gsa)
- $102,267.50
- General Services Administration (Gsa)