The Tradesmen Group, Llc
CAGE Code: 440F1
NCAGE Code: 440F1
Status: Active
Type: Commercial Supplier
Dun & Bradstreet (DUNS): 176436384
Summary
The Tradesmen Group, Llc is an Active Commercial Supplier with the Cage Code 440F1 and is tracked by Dun & Bradstreet under DUNS Number 176436384..
Address
8465 Rausch Dr
Plain City OH 43064-8064
United States
Points of Contact
Related Information
People who viewed this 'CAGE Code' also viewed...
Woodard Shop Equipment Sales Engineered Mfg And Equipment Fiw Inc Rojen Company Midwest Material Handling Llc Nofziger Door Sales Civil Construction, Inc. C M S Industries Marshall Don Co Inc The Evolution Ag, Llc Associated Graphics Inc System Technology Equipment Cool Reef Company A2z Field Services Llc Mitchum, Ronald K Bindery & Specialties Pressworks, Mobile Analytical Services Inc Ranco Incorporated Titan Industrial Supply Llc Data Analysis Technologies Inc
Frequently Asked Questions (FAQ) for CAGE 440F1
- What is CAGE Code 440F1?
- 440F1 is the unique identifier used by NATO Organizations to reference the physical entity known as The Tradesmen Group, Llc located at 8465 Rausch Dr, Plain City OH 43064-8064, United States.
- Who is CAGE Code 440F1?
- 440F1 refers to The Tradesmen Group, Llc located at 8465 Rausch Dr, Plain City OH 43064-8064, United States.
- Where is CAGE Code 440F1 Located?
- CAGE Code 440F1 is located in Plain City, OH, USA.
Contracting History for CAGE 440F1 Most Recent 25 Records
- 140P3022F0081
- National Mall And Memorial Parks Conservation Maintenance Of Virginia Avenue Statuary - P00001 Modification To General Jose De San Martin Memorial Work
- 28 Nov 2022
- National Mall And Memorial Parks Conservation Maintenance Of Virginia Avenue Statuary - P00001 Modification To General Jose De San Martin Memorial Work
- Ncr Regional Contracting(30000)
- Department Of The Interior (Doi)
- $183,272.00
- Department Of The Interior (Doi)
- 140P3022F0081
- National Mall And Memorial Parks Conservation Maintenance Of Virginia Avenue Statuary
- 12 Jul 2022
- National Mall And Memorial Parks Conservation Maintenance Of Virginia Avenue Statuary
- Ncr Regional Contracting(30000)
- Department Of The Interior (Doi)
- $171,287.00
- Department Of The Interior (Doi)
- 140P3021P0096
- Exterior Repairs To The National Park Service Property Located In Se, Washington, Dc For The Repairs Include A Full Replacement In-Kind Of The Slate Shingled Roof On The Main Building And Garage, Including New Aluminum Gutters And Downspouts. The Pr
- 22 Sep 2021
- Exterior Repairs To The National Park Service Property Located In Se, Washington, Dc For The Repairs Include A Full Replacement In-Kind Of The Slate Shingled Roof On The Main Building And Garage, Including New Aluminum Gutters And Downspouts. The Pr
- Ncr Regional Contracting(30000)
- Department Of The Interior (Doi)
- $663,208.60
- Department Of The Interior (Doi)
- 140P3021P0096
- Mod To Incorporate Asbestos Abatement Due To Hazardous Materials Test Findings And 30 Days Extension To Performance End Date
- 7 Jul 2022
- Mod To Incorporate Asbestos Abatement Due To Hazardous Materials Test Findings And 30 Days Extension To Performance End Date
- Ncr Regional Contracting(30000)
- Department Of The Interior (Doi)
- $663,208.60
- Department Of The Interior (Doi)
- 140P3020F0222
- Rehabilitation Of The Hancock Statue, Temperance Fountain, And Fdr Memorial Stone To Include Repairing Landscaping Features Such As The Belgian Block Pathway, Two Bronze And Aluminum Water Fountains, And A Bronze Plaque With Intent To Restore The Ass
- 12 Sep 2020
- Rehabilitation Of The Hancock Statue, Temperance Fountain, And Fdr Memorial Stone To Include Repairing Landscaping Features Such As The Belgian Block Pathway, Two Bronze And Aluminum Water Fountains, And A Bronze Plaque With Intent To Restore The Ass
- Ncr Regional Contracting(30000)
- Department Of The Interior (Doi)
- $383,862.00
- Department Of The Interior (Doi)
- 140P4220C0024
- Inde - Independence Hall Stonework Rehab
- 2 Jul 2021
- Inde - Independence Hall Stonework Rehab
- Ner Services Mabo (43000)
- Department Of The Interior (Doi)
- $118,131.00
- Department Of The Interior (Doi)
- 140P4220C0024
- Inde - Independence Hall Stonework Rehab Contract Award Is For Repair And Rehabilitation Of The Stonework Of The North Elevation At Independence National Historical Park (Inde), Philadelphia, Pa. Contractor Shall Repair The First And Second Floo
- 18 Sep 2020
- Inde - Independence Hall Stonework Rehab Contract Award Is For Repair And Rehabilitation Of The Stonework Of The North Elevation At Independence National Historical Park (Inde), Philadelphia, Pa. Contractor Shall Repair The First And Second Floo
- Northeast Regional Contracting
- Department Of The Interior (Doi)
- $118,131.00
- Department Of The Interior (Doi)
- 47PM0121C0001
- Mod Ps0013 - Change Of Company Name (Non-Novation) From The Tradesmen Group, Inc To The Tradesmen Group, Llc
- 16 Jun 2023
- Mod Ps0013 - Change Of Company Name (Non-Novation) From The Tradesmen Group, Inc To The Tradesmen Group, Llc
- Pbs Ncr Capital Construction Ctr 1
- General Services Administration (Gsa)
- $12,663,793.76
- General Services Administration (Gsa)
- 47PM0121C0001
- 47Pm0121c0001, Mod Ps0014 - Hud Granite Facade Repairs Phase Ii - Mod To Definitize Pdl (Ce04b, Ce08, Ce08b, Ce11, Ce14, Ce, 15, And Ce16b).
- 17 Jul 2023
- 47Pm0121c0001, Mod Ps0014 - Hud Granite Facade Repairs Phase Ii - Mod To Definitize Pdl (Ce04b, Ce08, Ce08b, Ce11, Ce14, Ce, 15, And Ce16b).
- Pbs Ncr Capital Construction Ctr 1
- General Services Administration (Gsa)
- $14,325,810.39
- General Services Administration (Gsa)
- 47PM0121C0001
- 47Pm0121c0001, Mod Ps0005 - Hud Granite Facade Repairs Phase Ii
- 20 Sep 2022
- 47Pm0121c0001, Mod Ps0005 - Hud Granite Facade Repairs Phase Ii
- Pbs Ncr Capital Construction Ctr 1
- General Services Administration (Gsa)
- $11,792,384.62
- General Services Administration (Gsa)
- 47PM0121C0001
- 47Pm0121c0001, Mod Pa0011 Finalize Cost Transfer- Hud Granite Facade Repairs Phase Ii
- 21 Apr 2023
- 47Pm0121c0001, Mod Pa0011 Finalize Cost Transfer- Hud Granite Facade Repairs Phase Ii
- Pbs Ncr Capital Construction Ctr 1
- General Services Administration (Gsa)
- $12,663,793.76
- General Services Administration (Gsa)
- 47PM0121C0001
- Mod Pa0010 - Conversion/Name Change
- 30 Mar 2023
- Mod Pa0010 - Conversion/Name Change
- Pbs Ncr Capital Construction Ctr 1
- General Services Administration (Gsa)
- $13,128,797.76
- General Services Administration (Gsa)
- 47PM0121C0001
- Ps0004 Supplemental Work Due To Unforeseen Conditions, And Add Kahua/Epm Requirement
- 1 Jun 2022
- Ps0004 Supplemental Work Due To Unforeseen Conditions, And Add Kahua/Epm Requirement
- Pbs Ncr Capital Construction Ctr 1
- General Services Administration (Gsa)
- $11,235,675.62
- General Services Administration (Gsa)
- 47PM0121C0001
- Mod Ps0003 Concrete Repairs Due To Unforeseen Conditions
- 21 Mar 2022
- Mod Ps0003 Concrete Repairs Due To Unforeseen Conditions
- Pbs Ncr Capital Construction Ctr 1
- General Services Administration (Gsa)
- $11,235,675.62
- General Services Administration (Gsa)
- 47PM0121C0001
- Mod Ps0009 Urgent Panel 27H Stabilization (Ba54)
- 27 Feb 2023
- Mod Ps0009 Urgent Panel 27H Stabilization (Ba54)
- Pbs Ncr Capital Construction Ctr 1
- General Services Administration (Gsa)
- $12,693,793.76
- General Services Administration (Gsa)
- 47PM0121C0001
- Design-Build Services For Hud Granite Facade Repair Phase Ii
- 28 Jan 2021
- Design-Build Services For Hud Granite Facade Repair Phase Ii
- Pbs Ncr Capital Construction Ctr 1
- General Services Administration (Gsa)
- $11,235,675.62
- General Services Administration (Gsa)
- 47PM0121C0001
- Admin Mod To Issue Ntp For Hud Gfr
- 9 Feb 2021
- Admin Mod To Issue Ntp For Hud Gfr
- Pbs Ncr Capital Construction Ctr 1
- General Services Administration (Gsa)
- $11,235,675.62
- General Services Administration (Gsa)
- 47PM0121C0001
- 47Pm0121c0001, Mod Ps0015 - Hud Granite Facade Repairs Phase Ii
- 2 Jan 2024
- 47Pm0121c0001, Mod Ps0015 - Hud Granite Facade Repairs Phase Ii
- Pbs R11 Construction Services Divsion Center 1
- General Services Administration (Gsa)
- $14,609,350.20
- General Services Administration (Gsa)
- 47PM0121C0001
- Mod Ps0012 De-Scope/De-Ob Hazmat Abatement
- 21 Apr 2023
- Mod Ps0012 De-Scope/De-Ob Hazmat Abatement
- Pbs Ncr Capital Construction Ctr 1
- General Services Administration (Gsa)
- $12,663,793.76
- General Services Administration (Gsa)
- 47PM0121C0001
- Unilateral Pdl Mod Pc0007 For Hud Gfr Phase Ii
- 1 Dec 2022
- Unilateral Pdl Mod Pc0007 For Hud Gfr Phase Ii
- Pbs Ncr Capital Construction Ctr 1
- General Services Administration (Gsa)
- $12,649,180.16
- General Services Administration (Gsa)
- 140P3020F0195
- Modification To Implement Temporary Shoring Activities & Materials Per Updated Structural Engineer Plans And Additional Excavation For The Concrete Slab For Acceptable Bearing Subgrade.
- 8 Aug 2021
- Modification To Implement Temporary Shoring Activities & Materials Per Updated Structural Engineer Plans And Additional Excavation For The Concrete Slab For Acceptable Bearing Subgrade.
- Ncr Regional Contracting(30000)
- Department Of The Interior (Doi)
- $781,299.10
- Department Of The Interior (Doi)
- 47PF0020C0047
- Pa05 Esl Skywalk Repair To 47Pf0020c0047 Skywalk Repairsprojectat The 650 Federal Building, 650 Missouri Ave. East St. Louis, Il. This Modification Is To Update Fixed Assetril11602il0220zz From Cipimp To Improvmnt. This Is A No Cost Modification.
- 27 Oct 2022
- Pa05 Esl Skywalk Repair To 47Pf0020c0047 Skywalk Repairsprojectat The 650 Federal Building, 650 Missouri Ave. East St. Louis, Il. This Modification Is To Update Fixed Assetril11602il0220zz From Cipimp To Improvmnt. This Is A No Cost Modification.
- Pbs R5
- General Services Administration (Gsa)
- $539,348.47
- General Services Administration (Gsa)
- 47PF0020C0047
- Mod Ps04 To Skywalk Repairs Project At The 650 Fb, 650 Missouri Ave. East St. Louis, Il. This Modification Incorporates By Reference Tradesman's Proposal On Gsa 1137 Dated 11/19/2021. Contract Increases By $166,097.22 From $369,109.00 To $535,206.22.
- 10 Nov 2021
- Mod Ps04 To Skywalk Repairs Project At The 650 Fb, 650 Missouri Ave. East St. Louis, Il. This Modification Incorporates By Reference Tradesman's Proposal On Gsa 1137 Dated 11/19/2021. Contract Increases By $166,097.22 From $369,109.00 To $535,206.22.
- Pbs R5
- General Services Administration (Gsa)
- $539,348.47
- General Services Administration (Gsa)
- 47PF0020C0047
- Skywalk Repairs Project At The 650 Federal Building, 650 Missouri Ave. East St. Louis, Il. This Modification Incorporates By Reference Tradesman's Proposal On Gsa 1137 Dated 8/2/2021. Contract Increases By $51,149.00 From $317,960.00 To $359,169.00.
- 4 Aug 2021
- Skywalk Repairs Project At The 650 Federal Building, 650 Missouri Ave. East St. Louis, Il. This Modification Incorporates By Reference Tradesman's Proposal On Gsa 1137 Dated 8/2/2021. Contract Increases By $51,149.00 From $317,960.00 To $359,169.00.
- Pbs R5
- General Services Administration (Gsa)
- $539,348.47
- General Services Administration (Gsa)
- 47PF0020C0047
- Modification Ps06 To 47Pf0020c0047 Skywalk Repairs Projectat The 650 Federal Building, 650 Missouri Ave. East St. Louis, Il. This Modification Incorporates By Reference Tradesman's Proposal Dated 10/21/2022 For Repair 2 Concrete Cracks.
- 2 Nov 2022
- Modification Ps06 To 47Pf0020c0047 Skywalk Repairs Projectat The 650 Federal Building, 650 Missouri Ave. East St. Louis, Il. This Modification Incorporates By Reference Tradesman's Proposal Dated 10/21/2022 For Repair 2 Concrete Cracks.
- Pbs R5
- General Services Administration (Gsa)
- $539,348.47
- General Services Administration (Gsa)