C C & G, Inc.
CAGE Code: 3XWK7
NCAGE Code: 3XWK7
Status: Active
Type: Commercial Supplier
Dun & Bradstreet (DUNS): 926937442
Summary
C C & G, Inc. is an Active Commercial Supplier with the Cage Code 3XWK7 and is tracked by Dun & Bradstreet under DUNS Number 926937442..
Address
3 Sniper Lane
Riverton WY 82501-8872
United States
Points of Contact
No Points of Contact...
Related Information
People who viewed this 'CAGE Code' also viewed...
Cse Services, Llc Deringers Peterbilt Inc Duralite Inc Sentry Mfg Llc Fabricon Products Inc. Digenhart Donald L Traders International Inc Universal Tech Corp Network Solutions Wasatch Computers Intl Hotel And Travel Index Advanstar Communications Inc Jasons Sheetmetal Corp Carty Sandra J Bergfels Mfg Corp Wind River Sign And Supply Inc T-M Vacuum Products Inc Wyoming Peaks & Prairies Pro Tech Equipment Co Inc Anchor Fence Of New Jersey
Frequently Asked Questions (FAQ) for CAGE 3XWK7
- What is CAGE Code 3XWK7?
- 3XWK7 is the unique identifier used by NATO Organizations to reference the physical entity known as C C & G, Inc. located at 3 Sniper Lane, Riverton WY 82501-8872, United States.
- Who is CAGE Code 3XWK7?
- 3XWK7 refers to C C & G, Inc. located at 3 Sniper Lane, Riverton WY 82501-8872, United States.
- Where is CAGE Code 3XWK7 Located?
- CAGE Code 3XWK7 is located in Riverton, WY, USA.
Contracting History for CAGE 3XWK7 Most Recent 25 Records
- AG02NVC170004
- Igf::Ot::Igf The Purpose Of This Modification Is To Make The Changes Identified On Page 3 To The Contract. The Changes Identified Will Result In A $2,960.00 Increase To The Contract. The Total Contract Value Will Increase From $875,779.50 To $878,739.50. The Changes From This Modification Will Not Affect Contract Time.
- 6 Oct 2017
- Igf::Ot::Igf The Purpose Of This Modification Is To Make The Changes Identified On Page 3 To The Contract. The Changes Identified Will Result In A $2,960.00 Increase To The Contract. The Total Contract Value Will Increase From $875,779.50 To $878,739.50. The Changes From This Modification Will Not Affect Contract Time.
- Usda Forest Service
- Department Of Agriculture (Usda)
- $878,739.50
- Department Of Agriculture (Usda)
- 1202NV18C0009
- The Purpose Of This Modification Is To Add $4,500 To The Contract For The Labor, Equipment And Material To Install An 18" X 30' Diameter Cmp Cross Drain Culvert At The Half Moon Bridge Structure. After The Regional Bridge Engineer And Cor
- 23 Sep 2019
- The Purpose Of This Modification Is To Add $4,500 To The Contract For The Labor, Equipment And Material To Install An 18" X 30' Diameter Cmp Cross Drain Culvert At The Half Moon Bridge Structure. After The Regional Bridge Engineer And Cor
- Usda Forest Service
- Department Of Agriculture (Usda)
- $1,699,605.00
- Department Of Agriculture (Usda)
- 1202NV18C0009
- Half Moon, Tosi And Sweeney Creek Bridge Replacement Project Pinedale Ranger District Bridger-Teton National Forest Sublette County, Wyoming
- 27 Sep 2018
- Half Moon, Tosi And Sweeney Creek Bridge Replacement Project Pinedale Ranger District Bridger-Teton National Forest Sublette County, Wyoming
- Usda Forest Service
- Department Of Agriculture (Usda)
- $1,695,105.00
- Department Of Agriculture (Usda)
- 1202NV18C0009
- The Purpose Of This Modification Is To Change The Object Marker Posts For The Half Moon&Sweeney Creek Bridges From A Glued-Laminated Treated Guard To 'Bent Hat' Metal Post As Referenced On The Tosi Bridge Detail. The Change Will Resu
- 2 Oct 2019
- The Purpose Of This Modification Is To Change The Object Marker Posts For The Half Moon&Sweeney Creek Bridges From A Glued-Laminated Treated Guard To 'Bent Hat' Metal Post As Referenced On The Tosi Bridge Detail. The Change Will Resu
- Usda Forest Service
- Department Of Agriculture (Usda)
- $1,698,405.00
- Department Of Agriculture (Usda)
- AG02NVC170004
- Igf::Ot::Igf Crystal Creek Bridge Replacement Project Bridger-Teton National Forest Jackson Ranger District Teton County, Wyoming
- 12 Sep 2017
- Igf::Ot::Igf Crystal Creek Bridge Replacement Project Bridger-Teton National Forest Jackson Ranger District Teton County, Wyoming
- Usda Forest Service
- Department Of Agriculture (Usda)
- $878,739.50
- Department Of Agriculture (Usda)
- AG02NVC170004
- Igf::Ot::Igf The Purpose Of This Modification Is To Extend The Completion Time Of The Crystal Creek Bridge Project From October 15, 2018 To July 15, 2019 With Consideration Of Increasing The Asphalt Depth On The Centerline Of The Bridge Asphalt From 3" To 4". If The Project Is Not Completed Before Winter Shut Down 2018, The Contractor Is Responsible For Securing The New Bridge Structure And Approaches To Prevent Vehicles From Utilizing The New Structure. All Work Under The Contract Shall Be Completed No Later Than July 15, 2019.
- 2 Nov 2018
- Igf::Ot::Igf The Purpose Of This Modification Is To Extend The Completion Time Of The Crystal Creek Bridge Project From October 15, 2018 To July 15, 2019 With Consideration Of Increasing The Asphalt Depth On The Centerline Of The Bridge Asphalt From 3" To 4". If The Project Is Not Completed Before Winter Shut Down 2018, The Contractor Is Responsible For Securing The New Bridge Structure And Approaches To Prevent Vehicles From Utilizing The New Structure. All Work Under The Contract Shall Be Completed No Later Than July 15, 2019.
- Usda Forest Service
- Department Of Agriculture (Usda)
- $878,739.50
- Department Of Agriculture (Usda)