Kronenberger & Sons Restoration,
Inc.
CAGE Code: 3QJV2
NCAGE Code: 3QJV2
Status: Active
Type: Commercial Supplier
Dun & Bradstreet (DUNS): 829713577
Summary
Kronenberger & Sons Restoration,, Inc. is an Active Commercial Supplier with the Cage Code 3QJV2 and is tracked by Dun & Bradstreet under DUNS Number 829713577..
Address
175 Industrial Park Rd
Middletown CT 06457-3840
United States
Points of Contact
- Telephone:
- 8608941165
- http://www.kronenbergersons.com/
Related Information
People who viewed this 'CAGE Code' also viewed...
Northrop Grumman Technical Services, Piedmont Aviation Services County Draperies, Inc. Consultants Dot Com Inc Astro Maintenance Services Inc. Perfect Fit / Shield Wallets Tri-State Educational Systems Inc. Adeptus Associates Blevins Trucking & Materials General Electric Co Ordnance Systems Taber Oil Co Inc Vysion Systems Inc. Real-Time Analyzers Inc Compusource Inc Ihcl Inc Ct Systems Llc Cook Hauling A Better Idea Specialty Shelving Co. Daubin Systems Corp
Frequently Asked Questions (FAQ) for CAGE 3QJV2
- What is CAGE Code 3QJV2?
- 3QJV2 is the unique identifier used by NATO Organizations to reference the physical entity known as Kronenberger & Sons Restoration, Inc. located at 175 Industrial Park Rd, Middletown CT 06457-3840, United States.
- Who is CAGE Code 3QJV2?
- 3QJV2 refers to Kronenberger & Sons Restoration, Inc. located at 175 Industrial Park Rd, Middletown CT 06457-3840, United States.
- Where is CAGE Code 3QJV2 Located?
- CAGE Code 3QJV2 is located in Middletown, CT, USA.
Contracting History for CAGE 3QJV2 Most Recent 25 Records
- INP17PX03220
- Igf::Ot::Igf X:Nogrn Installation Of Storm Windows At St. Joseph Hall, Salem Maritime National Historic Site, 160 Derby Street, Salem, Massachusetts. Execute And Complete Work Of Project In Accordance With All Contract And Project Documents/Drawings. Work Of Project Includes, But Is Not Limited To: Temporary Removal And On-Site Storage Of Window Treatments (E.G. Drapery, Shades And Blinds) And, Only If Necessary, Associated Mounting Hardware; Removal And Salvage Of Interior Window Stops And Inspection Of Substrate, I.E., Frames Beneath, Noting Additions And/Or Alterations Needed To Re-Seat Loose And Offset Stops In Conjunction With Installation Of New Storm Windows; Methodology And Sequencing Of Work That Retains And Protects Existing Sash In Place Or, Alternatively Removes And Replaces Sash In Conjunction And Coordination With New Work; Repair Of Split And/Or Damaged Wood Stops, Including Surface Preparation And Spot Refinishing, As Indicated Or Required; Measurement And Documentation Of Existing Window Openings At Interior Side Of Fixed And Operable Sash, Including Clear Dimensions Of Interior Frames And Trim And Physical Location And Conditions Of Interior Stops, Fasteners And Associated Window Hardware; Supply And Installation Of Custom-Fabricated, Removable Interior Storm Window Assemblies Secured To Existing Wood Window Stops, Using Extruded Channels, Angles And Magnetic Strips; Reinstallation Of Window Treatments (E.G. Drapery, Shades And Blinds) And, As Applicable, Associated Mounting Hardware, Followed By Verification That The Window Treatment Assemblies Are Returned To Pre-Construction Operating Conditions.
- 12 Sep 2017
- Igf::Ot::Igf X:Nogrn Installation Of Storm Windows At St. Joseph Hall, Salem Maritime National Historic Site, 160 Derby Street, Salem, Massachusetts. Execute And Complete Work Of Project In Accordance With All Contract And Project Documents/Drawings. Work Of Project Includes, But Is Not Limited To: Temporary Removal And On-Site Storage Of Window Treatments (E.G. Drapery, Shades And Blinds) And, Only If Necessary, Associated Mounting Hardware; Removal And Salvage Of Interior Window Stops And Inspection Of Substrate, I.E., Frames Beneath, Noting Additions And/Or Alterations Needed To Re-Seat Loose And Offset Stops In Conjunction With Installation Of New Storm Windows; Methodology And Sequencing Of Work That Retains And Protects Existing Sash In Place Or, Alternatively Removes And Replaces Sash In Conjunction And Coordination With New Work; Repair Of Split And/Or Damaged Wood Stops, Including Surface Preparation And Spot Refinishing, As Indicated Or Required; Measurement And Documentation Of Existing Window Openings At Interior Side Of Fixed And Operable Sash, Including Clear Dimensions Of Interior Frames And Trim And Physical Location And Conditions Of Interior Stops, Fasteners And Associated Window Hardware; Supply And Installation Of Custom-Fabricated, Removable Interior Storm Window Assemblies Secured To Existing Wood Window Stops, Using Extruded Channels, Angles And Magnetic Strips; Reinstallation Of Window Treatments (E.G. Drapery, Shades And Blinds) And, As Applicable, Associated Mounting Hardware, Followed By Verification That The Window Treatment Assemblies Are Returned To Pre-Construction Operating Conditions.
- Ner Services Mabo (43000)
- Department Of The Interior (Doi)
- $97,699.98
- Department Of The Interior (Doi)
- INP17PC00589
- Supply And Replacement Of 40 Additional Slate Roofing Shingles On Custom House Chimneys At Salem Maritime Nhs, Salem, Ma
- 6 May 2020
- Supply And Replacement Of 40 Additional Slate Roofing Shingles On Custom House Chimneys At Salem Maritime Nhs, Salem, Ma
- Ner Services Mabo (43000)
- Department Of The Interior (Doi)
- $178,322.97
- Department Of The Interior (Doi)
- GS01P15BZC0017
- Contract Gs-01P-15-Bz-C-0017, For Construction Project Titles, Window Rehabilitation And Associated Repairs At The Richard C. Lee Federal Courthouse, New Haven, Ct Is Hereby Modified In Accordance With The Attached Schedule. This Modification Increase The Contract Price By $6,384.71 From $5,625,905.74 To $5,632,290.45. All Other Terms And Conditions Remain The Same. The Contract Completed Date Is Revised To April 19, 2019. Contractor's Statement Of Release: In Consideration Of The Modification Agreed To Herein As Complete Equitable Adjustments For Kronenberger&Sons Restoration, The Contractor Hereby Releases The Government From Any And All Liability Under This Contract For Further Equitable Adjustments To Such Facts Of Circumstances Giving Rise To The Proposals.
- 15 Jan 2019
- Contract Gs-01P-15-Bz-C-0017, For Construction Project Titles, Window Rehabilitation And Associated Repairs At The Richard C. Lee Federal Courthouse, New Haven, Ct Is Hereby Modified In Accordance With The Attached Schedule. This Modification Increase The Contract Price By $6,384.71 From $5,625,905.74 To $5,632,290.45. All Other Terms And Conditions Remain The Same. The Contract Completed Date Is Revised To April 19, 2019. Contractor's Statement Of Release: In Consideration Of The Modification Agreed To Herein As Complete Equitable Adjustments For Kronenberger&Sons Restoration, The Contractor Hereby Releases The Government From Any And All Liability Under This Contract For Further Equitable Adjustments To Such Facts Of Circumstances Giving Rise To The Proposals.
- Pbs R1
- General Services Administration (Gsa)
- $5,632,290.45
- General Services Administration (Gsa)
- GS01P15BZC0017
- Contract Gs-01P-15-Bz-C-0017, For Construction Project Entitled, "Window Rehab And Associated Repairs", At The Richard C. Lee Federal Courthouse, New Haven, Ct Is Hereby Modified To Extend The Contract Completion Date From 9/28/2018 To 10/31/2018. The Contract Total Remains $5,625,905.74. All Other Terms And Conditions Remain The Same. Contract's Statement Of Release: In Consideration Of The Modification Agreed To Herein As Complete Equitable Adjustments For Kronenberger&Sons Restoration Inc. The Contractor Hereby Releases The Government From Any And All Liability Under This Contract For Further Equitable Adjustments To Such Facts Of Circumstances Giving Rise To The Proposals.
- 28 Sep 2018
- Contract Gs-01P-15-Bz-C-0017, For Construction Project Entitled, "Window Rehab And Associated Repairs", At The Richard C. Lee Federal Courthouse, New Haven, Ct Is Hereby Modified To Extend The Contract Completion Date From 9/28/2018 To 10/31/2018. The Contract Total Remains $5,625,905.74. All Other Terms And Conditions Remain The Same. Contract's Statement Of Release: In Consideration Of The Modification Agreed To Herein As Complete Equitable Adjustments For Kronenberger&Sons Restoration Inc. The Contractor Hereby Releases The Government From Any And All Liability Under This Contract For Further Equitable Adjustments To Such Facts Of Circumstances Giving Rise To The Proposals.
- Pbs R1
- General Services Administration (Gsa)
- $5,625,905.74
- General Services Administration (Gsa)
- GS01P15BZC0017
- Construction Windows, Lee Ch, New Haven Ct This Mod Incorporates The 889 Clauses Into The Contract
- 4 Feb 2020
- Construction Windows, Lee Ch, New Haven Ct This Mod Incorporates The 889 Clauses Into The Contract
- Pbs R1
- General Services Administration (Gsa)
- $5,825,889.99
- General Services Administration (Gsa)
- GS01P15BZC0017
- Contract Gs-01P-15-Bz-C-0017, Hereby Modified In Accordance With The Attached Request For Proposal, Rfp# 13, And Dated 7/25/2019. Window Lites Are To Be Replaced With Heat-Strengthened Glazing, Vice The Installed Fully-Tempered Glazing.
- 16 Aug 2019
- Contract Gs-01P-15-Bz-C-0017, Hereby Modified In Accordance With The Attached Request For Proposal, Rfp# 13, And Dated 7/25/2019. Window Lites Are To Be Replaced With Heat-Strengthened Glazing, Vice The Installed Fully-Tempered Glazing.
- Pbs R1
- General Services Administration (Gsa)
- $5,820,933.05
- General Services Administration (Gsa)
- GS01P15BZC0017
- Mod To Add Additional Window Lite, Lee Fb
- 11 Sep 2019
- Mod To Add Additional Window Lite, Lee Fb
- Pbs R1
- General Services Administration (Gsa)
- $5,822,679.77
- General Services Administration (Gsa)
- 15B20319CU1L20001
- Igf::Ot::Igf Fci Danbury - Install Power Plant Windows - Project 2D1l
- 20 Feb 2019
- Igf::Ot::Igf Fci Danbury - Install Power Plant Windows - Project 2D1l
- Fci Danbury
- Department Of Justice (Doj)
- $437,000.00
- Department Of Justice (Doj)
- GS01P15BZC0017
- Time Extension To 9/28/2018
- 11 Jun 2018
- Time Extension To 9/28/2018
- Pbs R1
- General Services Administration (Gsa)
- $5,625,905.74
- General Services Administration (Gsa)
- GS01P15BZC0017
- Window Restoration, Lee Federal Courthouse, New Haven, Ct, This Admin Mod Corrects A Clerical Error Made In Item #14. This Mod Corrects The Referenced Contract Amount To $5,825,889.99.
- 16 Dec 2019
- Window Restoration, Lee Federal Courthouse, New Haven, Ct, This Admin Mod Corrects A Clerical Error Made In Item #14. This Mod Corrects The Referenced Contract Amount To $5,825,889.99.
- Pbs R1
- General Services Administration (Gsa)
- $5,825,889.99
- General Services Administration (Gsa)
- GS01P15BZC0017
- No Cost Time Extension To 9/30/2019
- 2 Jul 2019
- No Cost Time Extension To 9/30/2019
- Pbs R1
- General Services Administration (Gsa)
- $5,632,290.45
- General Services Administration (Gsa)
- INP17PX03220
- Installation Of Storm Windows At St. Joseph Hall, Salem Maritime National Historic Site, 160 Derby Street, Salem, Massachusetts. Execute And Complete Work Of Project In Accordance With All Contract And Project Documents/Drawings. Work Of Project Incl
- 31 Mar 2020
- Installation Of Storm Windows At St. Joseph Hall, Salem Maritime National Historic Site, 160 Derby Street, Salem, Massachusetts. Execute And Complete Work Of Project In Accordance With All Contract And Project Documents/Drawings. Work Of Project Incl
- Ner Services Mabo (43000)
- Department Of The Interior (Doi)
- $97,699.98
- Department Of The Interior (Doi)
- 15B20319CU1L20001
- Fci Danbury - Install Power Plant Windows - Project 2D1l
- 3 Dec 2019
- Fci Danbury - Install Power Plant Windows - Project 2D1l
- Fci Danbury
- Department Of Justice (Doj)
- $439,350.43
- Department Of Justice (Doj)
- GS01P15BZC0017
- This Modification Ps25 Resolves The Rea For This Project, Lee Federal Building, Ct
- 19 Jun 2020
- This Modification Ps25 Resolves The Rea For This Project, Lee Federal Building, Ct
- Pbs R1
- General Services Administration (Gsa)
- $5,827,636.99
- General Services Administration (Gsa)
- 47PB0021P0009
- This Is A Purchase Order To Replace Windows In Courtroom #3 At The Lee Federal Courthouse, New Haven, Ct
- 25 Jun 2021
- This Is A Purchase Order To Replace Windows In Courtroom #3 At The Lee Federal Courthouse, New Haven, Ct
- Pbs R1
- General Services Administration (Gsa)
- $66,186.60
- General Services Administration (Gsa)
- GS01P15BZC0017
- This Modification Ps26 Deletes The Misc Funds ($0.17) On The Contract To Close Out.
- 26 Aug 2020
- This Modification Ps26 Deletes The Misc Funds ($0.17) On The Contract To Close Out.
- Pbs R1
- General Services Administration (Gsa)
- $5,827,636.82
- General Services Administration (Gsa)
- GS01P15BZC0017
- Ps22 Is To Allow For Mock Up Of Some Selected Windows, For Review And Acceptance, Before Remaining Windows Are Ordered. Additional Lead Time Is Required And Additional Mobilization To Complete This Task. Completion Time Will Be Extended To Spring 2020 To Support Installing Windows And The Sealing Of The Installation. Completion To Extended To 05/29/2020. There Is No Change In The Current Contract Price Of $5,822,679.77. All Other Terms And Conditions Of This Contract Remain The Same.
- 5 Dec 2019
- Ps22 Is To Allow For Mock Up Of Some Selected Windows, For Review And Acceptance, Before Remaining Windows Are Ordered. Additional Lead Time Is Required And Additional Mobilization To Complete This Task. Completion Time Will Be Extended To Spring 2020 To Support Installing Windows And The Sealing Of The Installation. Completion To Extended To 05/29/2020. There Is No Change In The Current Contract Price Of $5,822,679.77. All Other Terms And Conditions Of This Contract Remain The Same.
- Pbs R1
- General Services Administration (Gsa)
- $5,825,889.99
- General Services Administration (Gsa)
- INP17PX03001
- Igf::Ot::Igf Nogrn, Perform Cyclic Maintenance On Burlingham Barn At Weir Farm National Historical Site (Wefa), Wilton, Ct
- 6 Sep 2017
- Igf::Ot::Igf Nogrn, Perform Cyclic Maintenance On Burlingham Barn At Weir Farm National Historical Site (Wefa), Wilton, Ct
- Ner Services Mabo (43000)
- Department Of The Interior (Doi)
- $144,400.00
- Department Of The Interior (Doi)
- 47PB0021P0009
- This Administrative Modification Is To Change The Contracting Officer To Michele Valenza
- 3 Feb 2022
- This Administrative Modification Is To Change The Contracting Officer To Michele Valenza
- Pbs R1
- General Services Administration (Gsa)
- $66,186.60
- General Services Administration (Gsa)
- 47PB0021P0009
- Ps0002 Is A No Cost Period Of Performance Time Extension From 08/25/2021 To 06/15/2022. Contract Value Remains Unchanged At $66,186.60. All Other Terms And Conditions Of This Contract Remain Unchanged.
- 7 Oct 2021
- Ps0002 Is A No Cost Period Of Performance Time Extension From 08/25/2021 To 06/15/2022. Contract Value Remains Unchanged At $66,186.60. All Other Terms And Conditions Of This Contract Remain Unchanged.
- Pbs R1
- General Services Administration (Gsa)
- $66,186.60
- General Services Administration (Gsa)
- INP17PC00589
- Igf::Ot::Igf X:Nogrn Repair Custom House Chimneys And Selective Repointing Of Brick Exterior Walls At Salem Maritime National Historic Site, 160 Derby Street, Salem, Massachusetts. All Work Shall Be In Accordance With All Contract Documents. Work Includes, But Is Not Limited To, (A) Removal, Salvage And Reinstallation Of Sound And Relatively Undamaged Slate Roofing Shingles, And Supply And Installation Of New Slate Shingles, As Indicated Or Required;(B) Inspection Of Existing Copper Apron And Flashing And Lead-Coated Copper (Lcc) Counterflashing At Existing West-Facing Roof Slope; (C) Supply And Installation Of Self-Adhering Ice And Water Barrier As Underlayment Beneath Reinstalled Slate, Configured To Lap Upper Edge Of Existing Copper Apron; (D) Patch-Type Repair Or Replacement Of Severely Worn Or Damaged Section Of Copper Apron And Lcc Counterflashing, As Required; (E) Removal, Documentation And Replacement In Kind Of Torn Or Otherwise-Damaged Lcc Counterflashing At Southeast Chimney; (F) Removal Of Rust Stains At Exterior Masonry Wall Surfaces, As Indicated Or Required, Using An Appropriate Chemical Cleaner; (G) Supply Of New Brick, In Sizes And A Range Of Shades Intended To Match Existing Historic Masonry; (H) Supply And Installation Of Custom Mortar Mix For Repair And Repointing, Intended To Match Existing Historic Masonry; (I) Repair And Repointing Of Brick Masonry Building Walls And Chimneys, Including Removal Of Spalled And Severely Damaged Bricks And Installation Of New Brick Infill, As Required; And (J) Final Cleaning And Cleanup As Needed For A Proper And Workmanlike Masonry Repair Project.
- 12 Sep 2017
- Igf::Ot::Igf X:Nogrn Repair Custom House Chimneys And Selective Repointing Of Brick Exterior Walls At Salem Maritime National Historic Site, 160 Derby Street, Salem, Massachusetts. All Work Shall Be In Accordance With All Contract Documents. Work Includes, But Is Not Limited To, (A) Removal, Salvage And Reinstallation Of Sound And Relatively Undamaged Slate Roofing Shingles, And Supply And Installation Of New Slate Shingles, As Indicated Or Required;(B) Inspection Of Existing Copper Apron And Flashing And Lead-Coated Copper (Lcc) Counterflashing At Existing West-Facing Roof Slope; (C) Supply And Installation Of Self-Adhering Ice And Water Barrier As Underlayment Beneath Reinstalled Slate, Configured To Lap Upper Edge Of Existing Copper Apron; (D) Patch-Type Repair Or Replacement Of Severely Worn Or Damaged Section Of Copper Apron And Lcc Counterflashing, As Required; (E) Removal, Documentation And Replacement In Kind Of Torn Or Otherwise-Damaged Lcc Counterflashing At Southeast Chimney; (F) Removal Of Rust Stains At Exterior Masonry Wall Surfaces, As Indicated Or Required, Using An Appropriate Chemical Cleaner; (G) Supply Of New Brick, In Sizes And A Range Of Shades Intended To Match Existing Historic Masonry; (H) Supply And Installation Of Custom Mortar Mix For Repair And Repointing, Intended To Match Existing Historic Masonry; (I) Repair And Repointing Of Brick Masonry Building Walls And Chimneys, Including Removal Of Spalled And Severely Damaged Bricks And Installation Of New Brick Infill, As Required; And (J) Final Cleaning And Cleanup As Needed For A Proper And Workmanlike Masonry Repair Project.
- Ner Services Mabo (43000)
- Department Of The Interior (Doi)
- $178,322.97
- Department Of The Interior (Doi)
- 47PB0021P0009
- Eo14042in Accordance With Covid-19 Safety Protocol, Modification Ps0003 Incorporates Far Clause 52.223-99 Ensuring Adequate Covid-19 Safety Protocols For Federal Contractors (Oct 2021) (Deviation).
- 26 Oct 2021
- Eo14042in Accordance With Covid-19 Safety Protocol, Modification Ps0003 Incorporates Far Clause 52.223-99 Ensuring Adequate Covid-19 Safety Protocols For Federal Contractors (Oct 2021) (Deviation).
- Pbs R1
- General Services Administration (Gsa)
- $66,186.60
- General Services Administration (Gsa)
- 47PB0021P0009
- Administrative Modification Changing The Contracting Officer From Michele Valenza To Leo Osborne
- 4 Oct 2021
- Administrative Modification Changing The Contracting Officer From Michele Valenza To Leo Osborne
- Pbs R1
- General Services Administration (Gsa)
- $66,186.60
- General Services Administration (Gsa)