Odyssey International, Inc.
Dba Odyssey Global
CAGE Code: 3QJD0
NCAGE Code: 3QJD0
Status: Excluded or Suspended
Type: Commercial Supplier
Dun & Bradstreet (DUNS): 086547218
Summary
Odyssey International, Inc., Dba Odyssey Global is an Excluded or Suspended Commercial Supplier with the Cage Code 3QJD0 and is tracked by Dun & Bradstreet under DUNS Number 086547218..
Address
1635 N Greenfield Rd Ste 115
Mesa AZ 85205-4010
United States
Points of Contact
No Points of Contact...
Related Information
People who viewed this 'CAGE Code' also viewed...
Asdf Inc Top Aces Corp. Coptoons Police Supply Inc Videosonics Production Inc Knight Vision Global Solutions Llc Continental Envirotech Inc Telonics Telemetry Consultants Astrotronics Inc. Service Supply Co Caliber Mechanical Systems Inc Krn Aviation Inc Hinz Jo Ann Books Inter-Tribal Distributors Inc Dynair Fueling Inc Mesa Driveshaft Service Inc Liberty Communications Tidy Fidy Llc Air Improvement Resources Inc Petite Elizabeth Co Cableamerica Corp
Frequently Asked Questions (FAQ) for CAGE 3QJD0
- What is CAGE Code 3QJD0?
- 3QJD0 is the unique identifier used by NATO Organizations to reference the physical entity known as Odyssey International, Inc. Dba Odyssey Global located at 1635 N Greenfield Rd Ste 115, Mesa AZ 85205-4010, United States.
- Who is CAGE Code 3QJD0?
- 3QJD0 refers to Odyssey International, Inc. Dba Odyssey Global located at 1635 N Greenfield Rd Ste 115, Mesa AZ 85205-4010, United States.
- Where is CAGE Code 3QJD0 Located?
- CAGE Code 3QJD0 is located in Mesa, AZ, USA.
Contracting History for CAGE 3QJD0 Most Recent 25 Records
- W912HN19C3000
- Funding For Clin 0002A Modification For Gc023 Concrete Flume Added Cost $138,304.00 Added Time 45 Calendar Days
- 7 May 2021
- Funding For Clin 0002A Modification For Gc023 Concrete Flume Added Cost $138,304.00 Added Time 45 Calendar Days
- Us Army Engineer District Savannah
- Department Of Defense (Dod)
- $14,768,954.64
- Department Of Defense (Dod)
- W912HN19C3000
- Funding For Clin 0001Ab Modification For Gc027 Install Lintels In Hallway Shear Walls Added Cost $11,015.00 Added Time 14 Days.
- 30 Apr 2021
- Funding For Clin 0001Ab Modification For Gc027 Install Lintels In Hallway Shear Walls Added Cost $11,015.00 Added Time 14 Days.
- Us Army Engineer District Savannah
- Department Of Defense (Dod)
- $14,768,954.64
- Department Of Defense (Dod)
- W912HN19C3000
- Funding For Clin 0001Ab Modification For Gc028 Unit Heater Vestibule Add Cost $6,266.63 And Time 12 Calendar Days
- 18 May 2021
- Funding For Clin 0001Ab Modification For Gc028 Unit Heater Vestibule Add Cost $6,266.63 And Time 12 Calendar Days
- Us Army Engineer District Savannah
- Department Of Defense (Dod)
- $14,768,954.64
- Department Of Defense (Dod)
- W912HN19C3000
- Funding For Clin 0001Ab Modification For Gc029 Delete Awp1 Deobligated Cost -$50,219.00 And No Time.
- 2 Apr 2021
- Funding For Clin 0001Ab Modification For Gc029 Delete Awp1 Deobligated Cost -$50,219.00 And No Time.
- Us Army Engineer District Savannah
- Department Of Defense (Dod)
- $14,768,954.64
- Department Of Defense (Dod)
- W912HN19C3000
- Funding For Clin 0001Ab Modification For Gc025 Upgrade Forklift Charging Station Power Added Cost $15,027.68 And Time 14 Calendar Days.
- 5 May 2021
- Funding For Clin 0001Ab Modification For Gc025 Upgrade Forklift Charging Station Power Added Cost $15,027.68 And Time 14 Calendar Days.
- Us Army Engineer District Savannah
- Department Of Defense (Dod)
- $14,768,954.64
- Department Of Defense (Dod)
- W912HN19C3000
- Funding For Clin 0001Ab Modification For Gc024 Revise Ceiling Grid Added Cost $12,245.48 And Added Time 60 Calendar Days.
- 19 Apr 2021
- Funding For Clin 0001Ab Modification For Gc024 Revise Ceiling Grid Added Cost $12,245.48 And Added Time 60 Calendar Days.
- Us Army Engineer District Savannah
- Department Of Defense (Dod)
- $14,768,954.64
- Department Of Defense (Dod)
- W912HN19C3000
- Funding For Clin 0002 For Modification Gc021 Add Fire Hydrant Arcyber Cof Added Cost $175,851.00 And No Time.
- 6 May 2021
- Funding For Clin 0002 For Modification Gc021 Add Fire Hydrant Arcyber Cof Added Cost $175,851.00 And No Time.
- Us Army Engineer District Savannah
- Department Of Defense (Dod)
- $14,768,954.64
- Department Of Defense (Dod)
- W912HN19C3000
- Funding For Clin 0001Ab Modification For Gc026 Add Bollards To Protect Hvac Equipment Added Cost $5,081.00 And Time 14 Calendar Days.
- 3 May 2021
- Funding For Clin 0001Ab Modification For Gc026 Add Bollards To Protect Hvac Equipment Added Cost $5,081.00 And Time 14 Calendar Days.
- Us Army Engineer District Savannah
- Department Of Defense (Dod)
- $14,768,954.64
- Department Of Defense (Dod)
- GS35F674GA
- Federal Supply Schedule Contract
- 2 Dec 2017
- Federal Supply Schedule Contract
- Gsa/Fas Center For It Schedule Prog
- General Services Administration (Gsa)
- $0.00
- General Services Administration (Gsa)
- GS35F674GA
- Federal Supply Schedule Contract
- 22 Jun 2021
- Federal Supply Schedule Contract
- Gsa/Fas Center For It Schedule Prog
- General Services Administration (Gsa)
- $0.00
- General Services Administration (Gsa)
- GS35F674GA
- Federal Supply Schedule Contract
- 19 Nov 2017
- Federal Supply Schedule Contract
- Gsa/Fas Center For It Schedule Prog
- General Services Administration (Gsa)
- $0.00
- General Services Administration (Gsa)
- 80KSC018F0139
- Hurricane Matthew Repairs, Hangar Af Mod 4: The Purpose Of This Modification Is To Revise The Contract As Follows: A. Provide All Management, Supervision, Labor, Equipment, And Materials To Accomplish The Following Tn Contract Change: 1. Tn-7 - Repair Corroded Steel Deck, In The Amount Of $47,646 B. As A Result Of The Above Change, The Contract Price Is Increased From $2,567,020 To $2,614,666; And Increase Of $47,646. This Shall Be Reflected In Block 22 Of The Sf1442. C. The Contract Completion Date Will Change From October 21, 2019 To October 31, 2019.
- 2 Aug 2019
- Hurricane Matthew Repairs, Hangar Af Mod 4: The Purpose Of This Modification Is To Revise The Contract As Follows: A. Provide All Management, Supervision, Labor, Equipment, And Materials To Accomplish The Following Tn Contract Change: 1. Tn-7 - Repair Corroded Steel Deck, In The Amount Of $47,646 B. As A Result Of The Above Change, The Contract Price Is Increased From $2,567,020 To $2,614,666; And Increase Of $47,646. This Shall Be Reflected In Block 22 Of The Sf1442. C. The Contract Completion Date Will Change From October 21, 2019 To October 31, 2019.
- Nasa Kennedy Space Center
- National Aeronautics And Space Administration (Nasa)
- $3,133,833.00
- National Aeronautics And Space Administration (Nasa)
- 80KSC018F0256
- Logistics Roof (K6-1547) Roof Replacement, Pcn: 99096. The Contract Period Of Performance Completion Date Is Changed From 7/31/2020 To 8/31/2020 To Complete Contract Close Out Due To No Access To Kennedy Space Center As A Result Of Covid 19.
- 3 Aug 2020
- Logistics Roof (K6-1547) Roof Replacement, Pcn: 99096. The Contract Period Of Performance Completion Date Is Changed From 7/31/2020 To 8/31/2020 To Complete Contract Close Out Due To No Access To Kennedy Space Center As A Result Of Covid 19.
- Nasa Kennedy Space Center
- National Aeronautics And Space Administration (Nasa)
- $5,120,677.00
- National Aeronautics And Space Administration (Nasa)
- 80KSC018F0261
- Science Processing Area Repurposing Modifications To Space Station Mod 6: The Purpose Of This Modification Is To Incorporate Task Number(Tn) 07, 08, 09, And Deviation Waiver Contract Changes. As A Result Of The Above Changes, The Contract Price Is Increased By $11,000 From $1,008,911 To $1,019,911.
- 6 Sep 2019
- Science Processing Area Repurposing Modifications To Space Station Mod 6: The Purpose Of This Modification Is To Incorporate Task Number(Tn) 07, 08, 09, And Deviation Waiver Contract Changes. As A Result Of The Above Changes, The Contract Price Is Increased By $11,000 From $1,008,911 To $1,019,911.
- Nasa Kennedy Space Center
- National Aeronautics And Space Administration (Nasa)
- $1,019,911.00
- National Aeronautics And Space Administration (Nasa)
- 0480
- The Purpose Of This Modification Is To Extend The Completion Date From 3 February 2017 To 10 March 2017 Due To A Government Caused Delay. Due To The Availability Of Meddac It Personnel, More Time Is Needed To Allow For Training To Be Conducted For The Newly Installed Security System. Igf::Ot::Igf
- 10 Feb 2017
- The Purpose Of This Modification Is To Extend The Completion Date From 3 February 2017 To 10 March 2017 Due To A Government Caused Delay. Due To The Availability Of Meddac It Personnel, More Time Is Needed To Allow For Training To Be Conducted For The Newly Installed Security System. Igf::Ot::Igf
- W6qm Micc-Ft Drum
- Department Of Defense (Dod)
- $190,766.83
- Department Of Defense (Dod)
- GS35F674GA
- Federal Supply Schedule Contract
- 13 Sep 2017
- Federal Supply Schedule Contract
- Gsa/Fas Center For It Schedule Prog
- General Services Administration (Gsa)
- $0.00
- General Services Administration (Gsa)
- GS35F674GA
- Federal Supply Schedule Contract
- 10 Dec 2019
- Federal Supply Schedule Contract
- Gsa/Fas Center For It Schedule Prog
- General Services Administration (Gsa)
- $0.00
- General Services Administration (Gsa)
- 80KSC018F0139
- Hurricane Matthew Repairs, Hangar Af. Incorporates Tracking Numbers (Tn) 27 And Tn31r2, Increasing Contract Price $58,332. Completion Date Is Changed To 6/5/2020. Corrects Price Error In Mod 16, B.
- 10 Apr 2020
- Hurricane Matthew Repairs, Hangar Af. Incorporates Tracking Numbers (Tn) 27 And Tn31r2, Increasing Contract Price $58,332. Completion Date Is Changed To 6/5/2020. Corrects Price Error In Mod 16, B.
- Nasa Kennedy Space Center
- National Aeronautics And Space Administration (Nasa)
- $3,133,833.00
- National Aeronautics And Space Administration (Nasa)
- 80KSC018F0256
- Logistics Roof (K6-1547) Roof Replacement, Pcn: 99096 Mod 1: The Purpose Of This Modification Is To Incorporate The Following Into Contract Order 80Kscl8f0256 "Replace Logistic Roof At Kennedy Space Center; Pcn: 99096: The Purpose Of This Modification Is To Establish The Contract Period Of Performance From Notice To Proceed 11/14/2018 For 304 Days To 9/14/2019. Also, As Result The Government's Shutdown The Period Of Performance Completion Date Is Extended 49 Days And Is Changed From 9/14/2019 To 11/2/2019.
- 10 Apr 2019
- Logistics Roof (K6-1547) Roof Replacement, Pcn: 99096 Mod 1: The Purpose Of This Modification Is To Incorporate The Following Into Contract Order 80Kscl8f0256 "Replace Logistic Roof At Kennedy Space Center; Pcn: 99096: The Purpose Of This Modification Is To Establish The Contract Period Of Performance From Notice To Proceed 11/14/2018 For 304 Days To 9/14/2019. Also, As Result The Government's Shutdown The Period Of Performance Completion Date Is Extended 49 Days And Is Changed From 9/14/2019 To 11/2/2019.
- Nasa Kennedy Space Center
- National Aeronautics And Space Administration (Nasa)
- $5,120,677.00
- National Aeronautics And Space Administration (Nasa)
- 80KSC018F0261
- Modifications To Space Station Processing Facility Complex, Various Locations, Pcn: 99219
- 19 Sep 2018
- Modifications To Space Station Processing Facility Complex, Various Locations, Pcn: 99219
- Nasa Kennedy Space Center
- National Aeronautics And Space Administration (Nasa)
- $1,019,911.00
- National Aeronautics And Space Administration (Nasa)
- 80KSC018F0139
- Hurricane Matthew Repairs, Hangar Af The Purpose Of This Supplemental Agreement Is To Incorporate Tn 21 N The Amount Of $3,099 As Attachment 1. As A Result Contract Price Is Increased By $3,099 From $3,096,234 To $3,099,333. The Contract Completion Date Remains January 4, 2020.
- 12 Nov 2019
- Hurricane Matthew Repairs, Hangar Af The Purpose Of This Supplemental Agreement Is To Incorporate Tn 21 N The Amount Of $3,099 As Attachment 1. As A Result Contract Price Is Increased By $3,099 From $3,096,234 To $3,099,333. The Contract Completion Date Remains January 4, 2020.
- Nasa Kennedy Space Center
- National Aeronautics And Space Administration (Nasa)
- $3,133,833.00
- National Aeronautics And Space Administration (Nasa)
- 80KSC018F0139
- Hurricane Matthew Repairs, Hangar Af. No Cost Modification Incorporates Tracking Numbers 25 And 28 Into Contract. Completion Date Increased 5 Working Days To February 10, 2020.
- 10 Jan 2020
- Hurricane Matthew Repairs, Hangar Af. No Cost Modification Incorporates Tracking Numbers 25 And 28 Into Contract. Completion Date Increased 5 Working Days To February 10, 2020.
- Nasa Kennedy Space Center
- National Aeronautics And Space Administration (Nasa)
- $3,133,833.00
- National Aeronautics And Space Administration (Nasa)
- 80KSC018F0139
- Hurricane Matthew Repairs, Hangar Af. The Purpose Of This Modification Is To Extend The Contract 30 Days From November 18, 2020 To December 18, 2020 To Process Closeout Documentation.
- 17 Nov 2020
- Hurricane Matthew Repairs, Hangar Af. The Purpose Of This Modification Is To Extend The Contract 30 Days From November 18, 2020 To December 18, 2020 To Process Closeout Documentation.
- Nasa Kennedy Space Center
- National Aeronautics And Space Administration (Nasa)
- $3,133,833.00
- National Aeronautics And Space Administration (Nasa)
- 80KSC018F0139
- Hurricane Matthew Repairs, Hangar Af. Incorporates Request For Equitable Adjustments (Reas)2, Hurricane Dorian Impact And Rea 3, Covid 19 Impacts. Contract Price Is Increased $67,907. The Contract Completion Date Remains December 18, 2020.
- 11 Dec 2020
- Hurricane Matthew Repairs, Hangar Af. Incorporates Request For Equitable Adjustments (Reas)2, Hurricane Dorian Impact And Rea 3, Covid 19 Impacts. Contract Price Is Increased $67,907. The Contract Completion Date Remains December 18, 2020.
- Nasa Kennedy Space Center
- National Aeronautics And Space Administration (Nasa)
- $3,133,833.00
- National Aeronautics And Space Administration (Nasa)
- 80KSC018F0261
- Science Processing Area Repurposing Modifications To Space Station Processing Facility (Sspf) Mod 1: The Purpose Of This No Cost Modification Is To Revise The Task Order As Follows: Incorporate The Following Task Order Changes: The Task Order Performance Period Of 150 Days Was Established By The Issuance Of The Notice To Proceed Effective December 02, 2018, Thus Establishing An End Date Of May 02, 2019. Due To The 35 Day Government Shutdown (12/22/2018 - 01/27/2019), The Period Of Performance Is Further Extended To June 06, 2019. Incorporate The Contractor's Approved Site Specific Safety Plan For This Task Order.
- 6 Mar 2019
- Science Processing Area Repurposing Modifications To Space Station Processing Facility (Sspf) Mod 1: The Purpose Of This No Cost Modification Is To Revise The Task Order As Follows: Incorporate The Following Task Order Changes: The Task Order Performance Period Of 150 Days Was Established By The Issuance Of The Notice To Proceed Effective December 02, 2018, Thus Establishing An End Date Of May 02, 2019. Due To The 35 Day Government Shutdown (12/22/2018 - 01/27/2019), The Period Of Performance Is Further Extended To June 06, 2019. Incorporate The Contractor's Approved Site Specific Safety Plan For This Task Order.
- Nasa Kennedy Space Center
- National Aeronautics And Space Administration (Nasa)
- $1,019,911.00
- National Aeronautics And Space Administration (Nasa)