Daniel J Keating Co
CAGE Code: 3NSK2
NCAGE Code: 3NSK2
Status: Active
Type: Commercial Supplier
Dun & Bradstreet (DUNS): 618193213
Summary
Daniel J Keating Co is an Active Commercial Supplier with the Cage Code 3NSK2 and is tracked by Dun & Bradstreet under DUNS Number 618193213..
Address
134 N Narberth Ave
Narberth PA 19072-2211
United States
Points of Contact
No Points of Contact...
Related Information
People who viewed this 'CAGE Code' also viewed...
Photonics Inc Sarnacki Edward J Architects P C Gbf Enterprises Inc Era Systems Inc Intelligent Micro Systems Inc Environmental Resource Associates Bibb Mfg Co Michael V Oei Architect New York Film And Video Tape Citadel Information Technology Clinical Research Resourses Brian L. Strom, M.D., M.P.H., Llc Court Street Associates Arjun Kalyanpur & Assoc Md P C Cogan, Evie King Andrew Co Scandura Training Systems Inc Machinery Associates Inc Jeffries Samuel A Inc Pioneer Canvas Products Co Inc
Frequently Asked Questions (FAQ) for CAGE 3NSK2
- What is CAGE Code 3NSK2?
- 3NSK2 is the unique identifier used by NATO Organizations to reference the physical entity known as Daniel J Keating Co located at 134 N Narberth Ave, Narberth PA 19072-2211, United States.
- Who is CAGE Code 3NSK2?
- 3NSK2 refers to Daniel J Keating Co located at 134 N Narberth Ave, Narberth PA 19072-2211, United States.
- Where is CAGE Code 3NSK2 Located?
- CAGE Code 3NSK2 is located in Narberth, PA, USA.
Contracting History for CAGE 3NSK2 Most Recent 25 Records
- 47PD0322C0001
- Modification Ps0006 For The Fbi Re-Stack Project At The William Green Federal Bldg. In Philadelphia, Pa
- 18 Apr 2023
- Modification Ps0006 For The Fbi Re-Stack Project At The William Green Federal Bldg. In Philadelphia, Pa
- Pbs R3 Acq Mgmt Div Services
- General Services Administration (Gsa)
- $34,303,009.00
- General Services Administration (Gsa)
- 47PD0322C0001
- William J. Green Federal Building Restack Renovation Project Phase 2B, Philadelphia Pa Contract Number 47Pd0322c0001
- 15 Mar 2022
- William J. Green Federal Building Restack Renovation Project Phase 2B, Philadelphia Pa Contract Number 47Pd0322c0001
- Pbs R3
- General Services Administration (Gsa)
- $34,158,499.00
- General Services Administration (Gsa)
- 47PD0322C0001
- Modification Ps0009 For The Re-Stack Project At The Green Federal Bldg. In Philadelphia, Pa
- 5 Dec 2023
- Modification Ps0009 For The Re-Stack Project At The Green Federal Bldg. In Philadelphia, Pa
- Pbs R3 Acq Mgmt Div Contract Support
- General Services Administration (Gsa)
- $35,821,283.00
- General Services Administration (Gsa)
- 47PD0322C0001
- Modification Ps0008 For The Re-Stack Project At The Green Federal Bldg. In Philadelphia, Pa
- 29 Aug 2023
- Modification Ps0008 For The Re-Stack Project At The Green Federal Bldg. In Philadelphia, Pa
- Pbs R3 Acq Mgmt Div Services
- General Services Administration (Gsa)
- $34,704,723.00
- General Services Administration (Gsa)
- 47PD0322C0001
- Modification Ps0003 For The Re-Stack Construction Project At The Green Federal Bldg In Philadelphia, Pa
- 4 Nov 2022
- Modification Ps0003 For The Re-Stack Construction Project At The Green Federal Bldg In Philadelphia, Pa
- Pbs R3
- General Services Administration (Gsa)
- $34,158,499.00
- General Services Administration (Gsa)
- 47PD0322C0001
- Modification Ps0005 For The Restack Project At The Green Federal Bldg. In Philadelphia, Pa
- 27 Jan 2023
- Modification Ps0005 For The Restack Project At The Green Federal Bldg. In Philadelphia, Pa
- Pbs R3
- General Services Administration (Gsa)
- $34,158,499.00
- General Services Administration (Gsa)
- 47PD0322C0001
- Notice To Proceed
- 21 Apr 2022
- Notice To Proceed
- Pbs R3
- General Services Administration (Gsa)
- $34,158,499.00
- General Services Administration (Gsa)
- 47PD0322C0001
- Modification Ps0007 For The Re-Stack Project At The Green Federal Bldg. In Philadelphia, Pa
- 14 Jun 2023
- Modification Ps0007 For The Re-Stack Project At The Green Federal Bldg. In Philadelphia, Pa
- Pbs R3 Acq Mgmt Div Services
- General Services Administration (Gsa)
- $34,568,592.00
- General Services Administration (Gsa)
- N4008516C3037
- Igf::Ot::Igf The Purpose Of This Modification Is To Incorporate Pcs 47, 52, 60, 63, 73, 75, 84, And 86.
- 25 Feb 2019
- Igf::Ot::Igf The Purpose Of This Modification Is To Incorporate Pcs 47, 52, 60, 63, 73, 75, 84, And 86.
- Naval Fac Engineering Cmd Mid Lant
- Department Of Defense (Dod)
- $58,299,988.79
- Department Of Defense (Dod)
- N4008516C3037
- Modification To Incorporate Pc 128: Material Storage&Rental Costs Ej Electric
- 8 Aug 2020
- Modification To Incorporate Pc 128: Material Storage&Rental Costs Ej Electric
- Naval Fac Engineering Cmd Mid Lant
- Department Of Defense (Dod)
- $60,122,056.25
- Department Of Defense (Dod)
- N4008516C3037
- Pc 121 Ff&E And Av Revision Delay Costs
- 30 Jul 2020
- Pc 121 Ff&E And Av Revision Delay Costs
- Naval Fac Engineering Cmd Mid Lant
- Department Of Defense (Dod)
- $60,122,056.25
- Department Of Defense (Dod)
- N4008516C3037
- The Purpose Of This Modification Is To Incorporate Pc99 Diffuser Duct Outlet Revisions Per Rfi 318, Pc103 Casework And Tops Per Rfi342, And Pc104 Electraflash Strobe Transformer Per Rfi 346.
- 3 Jul 2019
- The Purpose Of This Modification Is To Incorporate Pc99 Diffuser Duct Outlet Revisions Per Rfi 318, Pc103 Casework And Tops Per Rfi342, And Pc104 Electraflash Strobe Transformer Per Rfi 346.
- Naval Fac Engineering Cmd Mid Lant
- Department Of Defense (Dod)
- $58,565,479.45
- Department Of Defense (Dod)
- N4008516C3037
- The Purpose Of This Modification Is To Incorporate Pc67, Furniture Removal And Disposition, Pc105 Carpet Revisions Per Rfi 345, And Pc109 Women's Restroom Lighting
- 6 Aug 2019
- The Purpose Of This Modification Is To Incorporate Pc67, Furniture Removal And Disposition, Pc105 Carpet Revisions Per Rfi 345, And Pc109 Women's Restroom Lighting
- Naval Fac Engineering Cmd Mid Lant
- Department Of Defense (Dod)
- $58,946,667.51
- Department Of Defense (Dod)
- N4008516C3037
- The Purpose Of This Modification Is To Incorporate Proposed Changes 76, 85, 88, 89, And 92 Into The Construction Contract.
- 24 Apr 2019
- The Purpose Of This Modification Is To Incorporate Proposed Changes 76, 85, 88, 89, And 92 Into The Construction Contract.
- Naval Fac Engineering Cmd Mid Lant
- Department Of Defense (Dod)
- $58,405,819.77
- Department Of Defense (Dod)
- N4008516C3037
- Pc 132 Plymer Admixture
- 2 Jul 2020
- Pc 132 Plymer Admixture
- Naval Fac Engineering Cmd Mid Lant
- Department Of Defense (Dod)
- $59,878,339.00
- Department Of Defense (Dod)
- N4008516C3037
- 000040--Cor 44R2 - Storm Water And Sanitary Field Connections; 000041--Cor 43R - Replace Grooved Piping With Welded Piping Per Navfac Requirements; 000046--Cor 46 - Added Siprnet And Nipr Circuits Per Rfi 211; 000048--Cor 25 - Equipment Standby Costs Due To Delays; 000049--Cor 53 - Delete Foam Insulation; 000053--Cor 52 - Hardware Revisions Per Rfi #209
- 4 Jun 2018
- 000040--Cor 44R2 - Storm Water And Sanitary Field Connections; 000041--Cor 43R - Replace Grooved Piping With Welded Piping Per Navfac Requirements; 000046--Cor 46 - Added Siprnet And Nipr Circuits Per Rfi 211; 000048--Cor 25 - Equipment Standby Costs Due To Delays; 000049--Cor 53 - Delete Foam Insulation; 000053--Cor 52 - Hardware Revisions Per Rfi #209
- Naval Fac Engineering Cmd Mid Lant
- Department Of Defense (Dod)
- $57,841,656.91
- Department Of Defense (Dod)
- N4008516C3037
- Pc 000055 -- Gas Storm Conflicts Rfi #217
- 18 Jun 2018
- Pc 000055 -- Gas Storm Conflicts Rfi #217
- Naval Fac Engineering Cmd Mid Lant
- Department Of Defense (Dod)
- $57,841,656.91
- Department Of Defense (Dod)
- N4008516C3037
- Mod To Incorporate Pc 83, 91, 106
- 26 Feb 2020
- Mod To Incorporate Pc 83, 91, 106
- Naval Fac Engineering Cmd Mid Lant
- Department Of Defense (Dod)
- $59,274,373.79
- Department Of Defense (Dod)
- N4008516C3037
- Modification To Incorporate Pc 131: Trend Data And Controls To Emergency Power
- 26 Aug 2020
- Modification To Incorporate Pc 131: Trend Data And Controls To Emergency Power
- Naval Fac Engineering Cmd Mid Lant
- Department Of Defense (Dod)
- $60,122,056.25
- Department Of Defense (Dod)
- N4008516C3037
- The Purpose Of This Modification Is To Provide A Credit For The Difference Between The Initial Awarded Ff&E Package And The Final Approved Ff&E Package.
- 20 May 2019
- The Purpose Of This Modification Is To Provide A Credit For The Difference Between The Initial Awarded Ff&E Package And The Final Approved Ff&E Package.
- Naval Fac Engineering Cmd Mid Lant
- Department Of Defense (Dod)
- $58,428,657.93
- Department Of Defense (Dod)
- N4008516C3037
- Modification To Incorporate Pc Pc-136 Labor & Material Delay Cost Dynamic Control Systems, And Pc-137 Labor & Material Delay Cost Devine Brothers.
- 4 Jan 2021
- Modification To Incorporate Pc Pc-136 Labor & Material Delay Cost Dynamic Control Systems, And Pc-137 Labor & Material Delay Cost Devine Brothers.
- Naval Fac Engineering Cmd Mid Lant
- Department Of Defense (Dod)
- $60,706,733.23
- Department Of Defense (Dod)
- N4008516C3037
- Base Price
- 19 Feb 2020
- Base Price
- Naval Fac Engineering Cmd Mid Lant
- Department Of Defense (Dod)
- $59,274,373.79
- Department Of Defense (Dod)
- N4008516C3037
- Base Price
- 1 Nov 2018
- Base Price
- Naval Fac Engineering Cmd Mid Lant
- Department Of Defense (Dod)
- $58,507,610.33
- Department Of Defense (Dod)
- N4008516C3037
- Cor 45 Insulated Concrete Form (Icf) Removal Of Foam At Floors; Cor 38 Philadelphia Gas Works (Pgw) Customer Charge
- 20 Apr 2018
- Cor 45 Insulated Concrete Form (Icf) Removal Of Foam At Floors; Cor 38 Philadelphia Gas Works (Pgw) Customer Charge
- Naval Fac Engineering Cmd Mid Lant
- Department Of Defense (Dod)
- $57,841,656.91
- Department Of Defense (Dod)
- N4008516C3037
- Modification To Incorporate Pc-137 Remove And Dispose Of Transite Mixed Concrete
- 25 Aug 2020
- Modification To Incorporate Pc-137 Remove And Dispose Of Transite Mixed Concrete
- Naval Fac Engineering Cmd Mid Lant
- Department Of Defense (Dod)
- $60,122,056.25
- Department Of Defense (Dod)