Lord, Aeck & Sargent, Inc.
Div Lord Aeck Sargent Planning &
Design
CAGE Code: 3NQD4
NCAGE Code: 3NQD4
Status: Active
Type: Commercial Supplier
Dun & Bradstreet (DUNS): 144442365
Summary
Lord, Aeck & Sargent, Inc., Div Lord Aeck Sargent Planning &, Design is an Active Commercial Supplier with the Cage Code 3NQD4 and is tracked by Dun & Bradstreet under DUNS Number 144442365..
Address
1175 Peachtree St Ne Ste 2400
Atlanta GA 30361-3552
United States
Points of Contact
Related Information
People who viewed this 'CAGE Code' also viewed...
Blue Cross And Blue Shielf Of International Business Machines Corp Econostrip Inc Ellisdon Construction,Inc. Government Technology Services Inc Ericsson Inc Custom Packaging Services Inc Christopher Stallard Cheatom Connected Enterprises Llc Southeast Container Concepts Inc Prudential Health Care Plan Inc Information America Inc Mechanical Specialities Inc Monarch Distributing Inc Epko Industries Inc Mdc Sanstar Productions Inc Multimedia Communication Services Auto-Soler Bostitch Div Of Textron James Auto Transport Inc Xtras Inc
Frequently Asked Questions (FAQ) for CAGE 3NQD4
- What is CAGE Code 3NQD4?
- 3NQD4 is the unique identifier used by NATO Organizations to reference the physical entity known as Lord, Aeck & Sargent, Inc. Div Lord Aeck Sargent Planning & Design located at 1175 Peachtree St Ne Ste 2400, Atlanta GA 30361-3552, United States.
- Who is CAGE Code 3NQD4?
- 3NQD4 refers to Lord, Aeck & Sargent, Inc. Div Lord Aeck Sargent Planning & Design located at 1175 Peachtree St Ne Ste 2400, Atlanta GA 30361-3552, United States.
- Where is CAGE Code 3NQD4 Located?
- CAGE Code 3NQD4 is located in Atlanta, GA, USA.
Contracting History for CAGE 3NQD4 Most Recent 25 Records
- 140P5121F0049
- Modification Extending The Period Of Performance. Architect And Engineering Services To Conduct Condition Assessments Of Wastewater Systems For Various Parks Within Interior Region 2.
- 7 Jun 2022
- Modification Extending The Period Of Performance. Architect And Engineering Services To Conduct Condition Assessments Of Wastewater Systems For Various Parks Within Interior Region 2.
- Ser East Mabo(51000)
- Department Of The Interior (Doi)
- $373,953.41
- Department Of The Interior (Doi)
- 140P5121F0049
- Modification To Extend The Period Of Performance, And To Add Alt Payee. Architect And Engineering Services To Conduct Condition Assessments Of Wastewater Systems For Various Parks Within Interior Region 2.
- 15 Feb 2023
- Modification To Extend The Period Of Performance, And To Add Alt Payee. Architect And Engineering Services To Conduct Condition Assessments Of Wastewater Systems For Various Parks Within Interior Region 2.
- Ser East Mabo(51000)
- Department Of The Interior (Doi)
- $373,953.41
- Department Of The Interior (Doi)
- 140P5121F0049
- Architect And Engineering Services To Conduct Condition Assessments Of Wastewater Systems For Various Parks Within Interior Region 2.
- 22 Jul 2021
- Architect And Engineering Services To Conduct Condition Assessments Of Wastewater Systems For Various Parks Within Interior Region 2.
- Ser East Mabo(51000)
- Department Of The Interior (Doi)
- $373,953.41
- Department Of The Interior (Doi)
- 140P5221F0027
- A/E Svs Discovery Nature Trail Boardwalk ~11,550 Sf - Hurricane Sally - Design And Compliance Pmis 304892B | Pepc Tbd | R5323210037 Park/Unit: Gulf Islands National Seashore/Perdido Key Area In Nearby Pensacola, Fl
- 27 Jul 2021
- A/E Svs Discovery Nature Trail Boardwalk ~11,550 Sf - Hurricane Sally - Design And Compliance Pmis 304892B | Pepc Tbd | R5323210037 Park/Unit: Gulf Islands National Seashore/Perdido Key Area In Nearby Pensacola, Fl
- Ser West(52000)
- Department Of The Interior (Doi)
- $214,751.46
- Department Of The Interior (Doi)
- 140P5221F0027
- A/E Svs Discovery Nature Trail Boardwalk ~11,550 Sf - Hurricane Sally - Design And Compliance Pmis 304892B | Pepc Tbd | R5323210037 Park/Unit: Gulf Islands National Seashore/Perdido Key Area In Nearby Pensacola, Fl Mod P0002 Revised Schedule Exten
- 9 Mar 2023
- A/E Svs Discovery Nature Trail Boardwalk ~11,550 Sf - Hurricane Sally - Design And Compliance Pmis 304892B | Pepc Tbd | R5323210037 Park/Unit: Gulf Islands National Seashore/Perdido Key Area In Nearby Pensacola, Fl Mod P0002 Revised Schedule Exten
- Ser West(52000)
- Department Of The Interior (Doi)
- $214,751.46
- Department Of The Interior (Doi)
- 140P5221F0027
- A/E Svs Discovery Nature Trail Boardwalk ~11,550 Sf - Hurricane Sally - Design And Compliance Pmis 304892B | Pepc Tbd | R5323210037 Park/Unit: Gulf Islands National Seashore/Perdido Key Area In Nearby Pensacola, Fl Mod P0001 Revised Schedule Exten
- 8 Feb 2022
- A/E Svs Discovery Nature Trail Boardwalk ~11,550 Sf - Hurricane Sally - Design And Compliance Pmis 304892B | Pepc Tbd | R5323210037 Park/Unit: Gulf Islands National Seashore/Perdido Key Area In Nearby Pensacola, Fl Mod P0001 Revised Schedule Exten
- Ser West(52000)
- Department Of The Interior (Doi)
- $214,751.46
- Department Of The Interior (Doi)
- 140P5221F0025
- Architect-Engineer Services For Battery Cullum-Sevier Stabilization Repairs And Access Phase 1 | Pmis 287571 | Pepc 45688 | R5323210033 Phase 2 | Pmis 310604 | Pepc 45688 | R5323210033a And R5323230015 Park/Unit: Gulf Islands National Seashore/F
- 30 Aug 2023
- Architect-Engineer Services For Battery Cullum-Sevier Stabilization Repairs And Access Phase 1 | Pmis 287571 | Pepc 45688 | R5323210033 Phase 2 | Pmis 310604 | Pepc 45688 | R5323210033a And R5323230015 Park/Unit: Gulf Islands National Seashore/F
- Ser West(52000)
- Department Of The Interior (Doi)
- $435,465.32
- Department Of The Interior (Doi)
- 140P5221F0025
- Architect-Engineer Services For Battery Cullum-Sevier Stabilization Repairs And Access Phase 1 | Pmis 287571 | Pepc 45688 | R5323210033 Phase 2A | Pmis 310604 | Pepc 45688 | R5323210033a Park/Unit: Gulf Islands National Seashore/Fort Pickens Are
- 20 Jul 2021
- Architect-Engineer Services For Battery Cullum-Sevier Stabilization Repairs And Access Phase 1 | Pmis 287571 | Pepc 45688 | R5323210033 Phase 2A | Pmis 310604 | Pepc 45688 | R5323210033a Park/Unit: Gulf Islands National Seashore/Fort Pickens Are
- Ser West(52000)
- Department Of The Interior (Doi)
- $173,447.54
- Department Of The Interior (Doi)
- 140P5221F0025
- Architect-Engineer Services For Battery Cullum-Sevier Stabilization Repairs And Access Phase 1 | Pmis 287571 | Pepc 45688 | R5323210033 Phase 2A | Pmis 310604 | Pepc 45688 | R5323210033a Park/Unit: Gulf Islands National Seashore/Fort Pickens Are
- 20 Oct 2021
- Architect-Engineer Services For Battery Cullum-Sevier Stabilization Repairs And Access Phase 1 | Pmis 287571 | Pepc 45688 | R5323210033 Phase 2A | Pmis 310604 | Pepc 45688 | R5323210033a Park/Unit: Gulf Islands National Seashore/Fort Pickens Are
- Ser West(52000)
- Department Of The Interior (Doi)
- $173,447.54
- Department Of The Interior (Doi)
- 140P5121F0032
- Architect-Engineer Design Services To Conduct An Engineering Analysis And Recommendation On The Stability Of A Walkway At The Russell Cave National Monument.
- 3 Jun 2021
- Architect-Engineer Design Services To Conduct An Engineering Analysis And Recommendation On The Stability Of A Walkway At The Russell Cave National Monument.
- Ser East Mabo(51000)
- Department Of The Interior (Doi)
- $24,333.54
- Department Of The Interior (Doi)
- 140P5121F0027
- Architect-Engineer Design Services To Replace The Hvac System In Fire Station # 9 At The Martin Luther King Jr National Historical Park.
- 27 May 2021
- Architect-Engineer Design Services To Replace The Hvac System In Fire Station # 9 At The Martin Luther King Jr National Historical Park.
- Ser East Mabo(51000)
- Department Of The Interior (Doi)
- $0.00
- Department Of The Interior (Doi)
- 140P5121F0027
- Modification To De-Obligate The Funds And Close Out Task Order. Architect-Engineer Design Services To Replace The Hvac System In Fire Station # 9 At The Martin Luther King Jr National Historical Park.
- 26 Jul 2021
- Modification To De-Obligate The Funds And Close Out Task Order. Architect-Engineer Design Services To Replace The Hvac System In Fire Station # 9 At The Martin Luther King Jr National Historical Park.
- Ser East Mabo(51000)
- Department Of The Interior (Doi)
- $0.00
- Department Of The Interior (Doi)
- 140P5121F0026
- Architect And Engineering Services To Rehabilitate The Restrooms At The Lookout Mountain Visitor Center.
- 27 May 2021
- Architect And Engineering Services To Rehabilitate The Restrooms At The Lookout Mountain Visitor Center.
- Ser East Mabo(51000)
- Department Of The Interior (Doi)
- $84,062.14
- Department Of The Interior (Doi)
- 140P5121F0026
- Modification To De-Obligate Remaining Funds. Architect And Engineering Services To Rehabilitate The Restrooms At The Lookout Mountain Visitor Center.
- 20 Jun 2023
- Modification To De-Obligate Remaining Funds. Architect And Engineering Services To Rehabilitate The Restrooms At The Lookout Mountain Visitor Center.
- Ser East Mabo(51000)
- Department Of The Interior (Doi)
- $84,062.14
- Department Of The Interior (Doi)
- 140P5121F0026
- Modification To Add New Vendor Code. Architect And Engineering Services To Rehabilitate The Restrooms At The Lookout Mountain Visitor Center.
- 15 Mar 2022
- Modification To Add New Vendor Code. Architect And Engineering Services To Rehabilitate The Restrooms At The Lookout Mountain Visitor Center.
- Ser East Mabo(51000)
- Department Of The Interior (Doi)
- $85,172.92
- Department Of The Interior (Doi)
- 140P5121F0016
- Architect-Engineer Design Services To Repair/Replace 7 Sets Or Metal Stairs/Handrails At Fort Sumter National Historical Park
- 22 Apr 2021
- Architect-Engineer Design Services To Repair/Replace 7 Sets Or Metal Stairs/Handrails At Fort Sumter National Historical Park
- Ser East Mabo(51000)
- Department Of The Interior (Doi)
- $103,204.41
- Department Of The Interior (Doi)
- 140P5121F0016
- Modification To Extend Period Of Performance. Architect-Engineer Design Services To Repair/Replace 7 Sets Or Metal Stairs/Handrails At Fort Sumter National Historical Park
- 12 Dec 2021
- Modification To Extend Period Of Performance. Architect-Engineer Design Services To Repair/Replace 7 Sets Or Metal Stairs/Handrails At Fort Sumter National Historical Park
- Ser East Mabo(51000)
- Department Of The Interior (Doi)
- $103,204.41
- Department Of The Interior (Doi)
- 140P5121F0016
- Modification To Extend Period Of Performance And Add Alt Payee. Architect-Engineer Design Services To Repair/Replace 7 Sets Or Metal Stairs/Handrails At Fort Sumter National Historical Park
- 15 Feb 2023
- Modification To Extend Period Of Performance And Add Alt Payee. Architect-Engineer Design Services To Repair/Replace 7 Sets Or Metal Stairs/Handrails At Fort Sumter National Historical Park
- Ser East Mabo(51000)
- Department Of The Interior (Doi)
- $103,204.41
- Department Of The Interior (Doi)
- 140P2021F0182
- Grsm 149285 - Water/Wastewater System Rehab Modified Dd/Cd
- 25 May 2021
- Grsm 149285 - Water/Wastewater System Rehab Modified Dd/Cd
- Dsc Contracting Services Division
- Department Of The Interior (Doi)
- $428,988.04
- Department Of The Interior (Doi)
- 140P2020F0336
- Vick 310916 - Park Wide Road Study Modification 02: Task Vi, Subtask 4 And Subtask 7
- 31 Dec 2021
- Vick 310916 - Park Wide Road Study Modification 02: Task Vi, Subtask 4 And Subtask 7
- Dsc Contracting Services Division
- Department Of The Interior (Doi)
- $1,121,079.22
- Department Of The Interior (Doi)
- 140P2020F0336
- Vick 310916 - Park Wide Road Study Modification 01: Time Extension To Continue Work
- 9 Sep 2021
- Vick 310916 - Park Wide Road Study Modification 01: Time Extension To Continue Work
- Dsc Contracting Services Division
- Department Of The Interior (Doi)
- $1,121,079.22
- Department Of The Interior (Doi)
- 140P2020F0336
- Vick 310916 - Park Wide Road Study Modification 03 Extend Pop For Admin Closeout Final Invoice
- 16 Sep 2022
- Vick 310916 - Park Wide Road Study Modification 03 Extend Pop For Admin Closeout Final Invoice
- Dsc Contracting Services Division
- Department Of The Interior (Doi)
- $996,135.52
- Department Of The Interior (Doi)
- 140P5120F0066
- Architect And Engineering Services To Design The Hvac System At The Reconstruction Era National Historical Park.
- 27 Aug 2020
- Architect And Engineering Services To Design The Hvac System At The Reconstruction Era National Historical Park.
- Ser East Mabo(51000)
- Department Of The Interior (Doi)
- $62,482.29
- Department Of The Interior (Doi)
- 140P2020F0301
- Waso 310314
- 15 Sep 2020
- Waso 310314
- Dsc Contracting Services Division
- Department Of The Interior (Doi)
- $411,921.00
- Department Of The Interior (Doi)
- 140P5120F0052
- Modification To Update Description Is The Sow. Architect And Engineering Services To Replace French Drain At The Martin L. King Jr National Historic Park
- 14 Dec 2021
- Modification To Update Description Is The Sow. Architect And Engineering Services To Replace French Drain At The Martin L. King Jr National Historic Park
- Ser East Mabo(51000)
- Department Of The Interior (Doi)
- $99,630.14
- Department Of The Interior (Doi)