Shimmick Construction Company, Inc.
CAGE Code: 3LYB5
NCAGE Code: 3LYB5
Status: Active
Type: Commercial Supplier
Dun & Bradstreet (DUNS): 608210977
Summary
Shimmick Construction Company, Inc. is an Active Commercial Supplier with the Cage Code 3LYB5 and is tracked by Dun & Bradstreet under DUNS Number 608210977..
Address
530 Technology Dr
Ste 300
Irvine CA 92618-1350
United States
Points of Contact
No Points of Contact...
Related Information
People who viewed this 'CAGE Code' also viewed...
Silicon Graphics Federal, Inc. Applied Microsystems Corp Synopsys Inc Global Data Center Ultrasystems Environmental Ultrasystems Environmental Automated Marine International Adaptiv Software Corp Inc World Library Inc Jonathan Engineered Solutions Corp. Bearing Engineers Inc Continus Software Corp Digicad Corp Elpac Electronics Inc Component Div Wbi Energy Services Inc Memory Intl Inc Love Charity Foundation Proteon Inc Developers General Contracting, Inc Oakley Inc
Frequently Asked Questions (FAQ) for CAGE 3LYB5
- What is CAGE Code 3LYB5?
- 3LYB5 is the unique identifier used by NATO Organizations to reference the physical entity known as Shimmick Construction Company, Inc. located at 530 Technology Dr, Ste 300, Irvine CA 92618-1350, United States.
- Who is CAGE Code 3LYB5?
- 3LYB5 refers to Shimmick Construction Company, Inc. located at 530 Technology Dr, Ste 300, Irvine CA 92618-1350, United States.
- Where is CAGE Code 3LYB5 Located?
- CAGE Code 3LYB5 is located in Irvine, CA, USA.
Contracting History for CAGE 3LYB5 Most Recent 25 Records
- 140R2024C0004
- A No-Cost Contract Completion Time Extension To 12/30/2023.
- 12 Dec 2023
- A No-Cost Contract Completion Time Extension To 12/30/2023.
- Mp-Regional Office
- Department Of The Interior (Doi)
- $323,000.00
- Department Of The Interior (Doi)
- 140R2024C0004
- The Temperature Control Device (Tcd) Is A Steel Structure Consisting Of A Shutter Structure And Low Level Intake Structure That Are Attached To The Upstream Face Of Shasta Dam. The Device Encloses All Five Existing Power Penstock Intakes And Permits
- 15 Nov 2023
- The Temperature Control Device (Tcd) Is A Steel Structure Consisting Of A Shutter Structure And Low Level Intake Structure That Are Attached To The Upstream Face Of Shasta Dam. The Device Encloses All Five Existing Power Penstock Intakes And Permits
- Mp-Regional Office
- Department Of The Interior (Doi)
- $323,000.00
- Department Of The Interior (Doi)
- W912P523F0157
- Dale Hollow Dam Spillway Gate Recoating And Machinery Control Rehabilitation
- 18 Sep 2023
- Dale Hollow Dam Spillway Gate Recoating And Machinery Control Rehabilitation
- W072 Endist Nashville
- Department Of Defense (Dod)
- $9,071,450.00
- Department Of Defense (Dod)
- W912P523D0001
- Fy22 Usace Lrd Regional Construction
- 14 Feb 2023
- Fy22 Usace Lrd Regional Construction
- Us Army Engineer District Nashville
- Department Of Defense (Dod)
- $0.00
- Department Of Defense (Dod)
- W9123723D0009
- Design Bid Build Land-Based Construction Projects Assigned To The Rivers Districts Of The Great Lakes And Ohio River Division Which Include Huntington, Louisville, Nashville And Pittsburgh Districts
- 23 Dec 2022
- Design Bid Build Land-Based Construction Projects Assigned To The Rivers Districts Of The Great Lakes And Ohio River Division Which Include Huntington, Louisville, Nashville And Pittsburgh Districts
- Us Army Engineer District Huntingto
- Department Of Defense (Dod)
- $0.00
- Department Of Defense (Dod)
- W9126G22C0005
- Lewisville Dam Lake Repairs
- 24 May 2022
- Lewisville Dam Lake Repairs
- Us Army Engineer District Ft Worth
- Department Of Defense (Dod)
- $76,089,805.00
- Department Of Defense (Dod)
- W9126G22C0005
- Decrease $72,000.88 And No Time. Changes Recess Drilling Method, Addresses Staging Area Changes, Addresses The Acrow Bridge Closures, And Covers Cost Associated With Additional Asr Testing.
- 7 Jul 2023
- Decrease $72,000.88 And No Time. Changes Recess Drilling Method, Addresses Staging Area Changes, Addresses The Acrow Bridge Closures, And Covers Cost Associated With Additional Asr Testing.
- Us Army Engineer District Ft Worth
- Department Of Defense (Dod)
- $76,360,890.12
- Department Of Defense (Dod)
- W9126G22C0005
- Apron Overlay
- 12 Jul 2022
- Apron Overlay
- Us Army Engineer District Ft Worth
- Department Of Defense (Dod)
- $76,089,805.00
- Department Of Defense (Dod)
- W9126G22C0005
- Increase $34,858 & No Time. Perform Topographic Surveying Of The Abutments For The Acrow Bridge.
- 27 Jul 2023
- Increase $34,858 & No Time. Perform Topographic Surveying Of The Abutments For The Acrow Bridge.
- Us Army Engineer District Ft Worth
- Department Of Defense (Dod)
- $76,548,059.84
- Department Of Defense (Dod)
- W9126G22C0005
- Mi005 Drainage Spec Change
- 28 Aug 2023
- Mi005 Drainage Spec Change
- W076 Endist Ft Worth
- Department Of Defense (Dod)
- $76,548,059.84
- Department Of Defense (Dod)
- W9126G22C0005
- Increase $291,746 And No Time. Install 1 Load Cell On Monoliths C, 2, 4, 6, 8, 10, 12, And D And Install 13 Dynaforce Load Sensors On Monoliths 1 Thru 13 As Shown On Revised Sheet Bi-102.A.
- 31 May 2023
- Increase $291,746 And No Time. Install 1 Load Cell On Monoliths C, 2, 4, 6, 8, 10, 12, And D And Install 13 Dynaforce Load Sensors On Monoliths 1 Thru 13 As Shown On Revised Sheet Bi-102.A.
- Us Army Engineer District Ft Worth
- Department Of Defense (Dod)
- $76,360,890.12
- Department Of Defense (Dod)
- W9126G22C0005
- Contract Modification To Correct The Wage Rates
- 2 Jun 2022
- Contract Modification To Correct The Wage Rates
- Us Army Engineer District Ft Worth
- Department Of Defense (Dod)
- $76,089,805.00
- Department Of Defense (Dod)
- W9123821C0022
- Tule River Basin Phase 2
- 6 Aug 2021
- Tule River Basin Phase 2
- Us Army Engineer District Sacrament
- Department Of Defense (Dod)
- $500,000.00
- Department Of Defense (Dod)
- W9123821C0022
- Tule River Basin Phase 2. Modification P00001 Terminates The Contract For Convenience Of The Government And Deobligates Excess Funding.
- 10 Dec 2021
- Tule River Basin Phase 2. Modification P00001 Terminates The Contract For Convenience Of The Government And Deobligates Excess Funding.
- Us Army Engineer District Sacrament
- Department Of Defense (Dod)
- $500,000.00
- Department Of Defense (Dod)
- W912EK19C0002
- Illinois River Basin, Lagrange Lock And Dam, Major Rehabilitation At Illinois River Basin. The Reason For This Modification Is For A Settlement Of Reas.
- 26 Aug 2022
- Illinois River Basin, Lagrange Lock And Dam, Major Rehabilitation At Illinois River Basin. The Reason For This Modification Is For A Settlement Of Reas.
- W07v Endist Rock Island
- Department Of Defense (Dod)
- $129,231,036.39
- Department Of Defense (Dod)
- W912EK19C0002
- Contract For Illinois River Basin, Lagrange Lock And Dam, Major Rehabilitation At Illinois River Basin. R00049 Reason For Modification Is Perform Onsite Inspections And Work On The Generator Load Shed.
- 23 Aug 2021
- Contract For Illinois River Basin, Lagrange Lock And Dam, Major Rehabilitation At Illinois River Basin. R00049 Reason For Modification Is Perform Onsite Inspections And Work On The Generator Load Shed.
- W07v Endist Rock Island
- Department Of Defense (Dod)
- $121,970,358.39
- Department Of Defense (Dod)
- W912EK19C0002
- Contract For River Basin, Lagrange Lock And Dam, Major Rehabilitation At Illinois River Basin. R00045 Reason For Modification Is To Install Chamber Ladder, Provide New Check-Post, And Modify Check-Post At Various Monoliths.
- 15 Jul 2021
- Contract For River Basin, Lagrange Lock And Dam, Major Rehabilitation At Illinois River Basin. R00045 Reason For Modification Is To Install Chamber Ladder, Provide New Check-Post, And Modify Check-Post At Various Monoliths.
- W07v Endist Rock Island
- Department Of Defense (Dod)
- $121,898,754.26
- Department Of Defense (Dod)
- W912EK19C0002
- Contract For Major Rehabilitation At Il River Basin. Ref No. R00058. Modification For Actuator Cable & Generator Monitoring And Increase To Contract Price Not To Exceed $25,000. No Change To Contract Completion Date.
- 20 May 2022
- Contract For Major Rehabilitation At Il River Basin. Ref No. R00058. Modification For Actuator Cable & Generator Monitoring And Increase To Contract Price Not To Exceed $25,000. No Change To Contract Completion Date.
- W07v Endist Rock Island
- Department Of Defense (Dod)
- $125,931,036.39
- Department Of Defense (Dod)
- W912EK19C0002
- Contract For Unrestricted, Best Value Tradeoff Illinois River Basin, Lagrange Lock And Dam, Major Rehabilitation At Illinois River Basin. Reference No. R00053. The Reason For This Modification Is The Agreement To Pay The Contractor For Rea's In Mod.
- 20 Dec 2021
- Contract For Unrestricted, Best Value Tradeoff Illinois River Basin, Lagrange Lock And Dam, Major Rehabilitation At Illinois River Basin. Reference No. R00053. The Reason For This Modification Is The Agreement To Pay The Contractor For Rea's In Mod.
- W07v Endist Rock Island
- Department Of Defense (Dod)
- $125,493,123.39
- Department Of Defense (Dod)
- W912EK19C0002
- Illinois River Basin, Lagrange Lock And Dam, Major Rehabilitation At Illinois River Basin. Reference No. R00052 Ea115 Proximity Cable Sensors Ea117 Internet Service After Turnover To Usace
- 22 Oct 2021
- Illinois River Basin, Lagrange Lock And Dam, Major Rehabilitation At Illinois River Basin. Reference No. R00052 Ea115 Proximity Cable Sensors Ea117 Internet Service After Turnover To Usace
- W07v Endist Rock Island
- Department Of Defense (Dod)
- $125,470,358.39
- Department Of Defense (Dod)
- W912EK19C0002
- Unrestricted, Best Value Tradeoff Illinois River Basin, Lagrange Lock And Dam, Major Rehabilitation At Illinois River Basin. R00046 Reason For This Modification Is To Conduct Various Repairs And Mg Sector Arm/Shaft Pinning Among Other Items.
- 19 Jul 2021
- Unrestricted, Best Value Tradeoff Illinois River Basin, Lagrange Lock And Dam, Major Rehabilitation At Illinois River Basin. R00046 Reason For This Modification Is To Conduct Various Repairs And Mg Sector Arm/Shaft Pinning Among Other Items.
- W07v Endist Rock Island
- Department Of Defense (Dod)
- $121,898,754.26
- Department Of Defense (Dod)
- W912EK19C0002
- Contract For Unrestricted, Best Value Tradeoff At Il River Basin Lagrange L&D Major Rehab. Ref.No.R00056. Modification Is For Access Road Changes And Changes To Contract Drawings And Price Is Increased By$199,457.00. Completion Date Remains Unchanged
- 25 Mar 2022
- Contract For Unrestricted, Best Value Tradeoff At Il River Basin Lagrange L&D Major Rehab. Ref.No.R00056. Modification Is For Access Road Changes And Changes To Contract Drawings And Price Is Increased By$199,457.00. Completion Date Remains Unchanged
- W07v Endist Rock Island
- Department Of Defense (Dod)
- $125,717,580.39
- Department Of Defense (Dod)
- W912EK19C0002
- Contract For Lagrange Ld Major Rehabilitation At Il River Basin. Ref. No. R00057. Reason For Modification Is Due To High Water Time From 02Feb - 22Apr By 61 Days To 22Jun2022. No Change To Contract Price.
- 22 Apr 2022
- Contract For Lagrange Ld Major Rehabilitation At Il River Basin. Ref. No. R00057. Reason For Modification Is Due To High Water Time From 02Feb - 22Apr By 61 Days To 22Jun2022. No Change To Contract Price.
- W07v Endist Rock Island
- Department Of Defense (Dod)
- $125,717,580.39
- Department Of Defense (Dod)
- W912EK19C0002
- Illinois River Basin, Lagrange Lock And Dam, Major Rehabilitation At Illinois River Basin. The Reason For This Modification Is For Handrail Corrections And Lift Station Discharge Cleanout.
- 29 Jul 2021
- Illinois River Basin, Lagrange Lock And Dam, Major Rehabilitation At Illinois River Basin. The Reason For This Modification Is For Handrail Corrections And Lift Station Discharge Cleanout.
- W07v Endist Rock Island
- Department Of Defense (Dod)
- $121,970,358.39
- Department Of Defense (Dod)
- W912EK19C0002
- Illinois River Basin, Lagrange Lock And Dam, Major Rehabilitation At Illinoi River Basin. The Reason For This Modification Is 2021 June/July High Water Time Extension
- 16 Sep 2021
- Illinois River Basin, Lagrange Lock And Dam, Major Rehabilitation At Illinoi River Basin. The Reason For This Modification Is 2021 June/July High Water Time Extension
- W07v Endist Rock Island
- Department Of Defense (Dod)
- $121,970,358.39
- Department Of Defense (Dod)