Rc Mechanical Inc
CAGE Code: 3DG94
NCAGE Code: 3DG94
Status: Active
Type: Commercial Supplier
Dun & Bradstreet (DUNS): 938048725
Summary
Rc Mechanical Inc is an Active Commercial Supplier with the Cage Code 3DG94 and is tracked by Dun & Bradstreet under DUNS Number 938048725..
Address
51231 Us Highway 41
Hancock MI 49930-9820
United States
Points of Contact
No Points of Contact...
Related Information
People who viewed this 'CAGE Code' also viewed...
Premier Peak Enterprises Llc Solar Farm Staffing Llc Netletric Llc Waubik Inc Vianna Mccormack Maki Oil Co Traverse Engineering Svcs Pc Auto Buff Inc Seaton Appraisal Associates Lake Portage Development Realty Houghton County Road Commission Iozzi, Joseph Inc Bacon Construction The George Wright Society Copper Country Intermediate School Houghton County Medical Care Pennsylvania Hardwood Sales Inc J C M Environmental Llc Roper John K Associates Inc Formatic Inc
Frequently Asked Questions (FAQ) for CAGE 3DG94
- What is CAGE Code 3DG94?
- 3DG94 is the unique identifier used by NATO Organizations to reference the physical entity known as Rc Mechanical Inc located at 51231 Us Highway 41, Hancock MI 49930-9820, United States.
- Who is CAGE Code 3DG94?
- 3DG94 refers to Rc Mechanical Inc located at 51231 Us Highway 41, Hancock MI 49930-9820, United States.
- Where is CAGE Code 3DG94 Located?
- CAGE Code 3DG94 is located in Hancock, MI, USA.
Contracting History for CAGE 3DG94 Most Recent 25 Records
- INP17PC00162
- Igf::Ot::Igf G:Estar Construction, Quincy Mine Office Heating System Replacement, Consisting Of Removal, Disposal Of And The Replacement Of The Boiler Heating System At Keweenaw Np, Boiler Unit With High Efficiency, P12*, 52.223-15 Energy Efficiency In Energy-Consuming Products December 2007
- 21 Apr 2017
- Igf::Ot::Igf G:Estar Construction, Quincy Mine Office Heating System Replacement, Consisting Of Removal, Disposal Of And The Replacement Of The Boiler Heating System At Keweenaw Np, Boiler Unit With High Efficiency, P12*, 52.223-15 Energy Efficiency In Energy-Consuming Products December 2007
- Mwr Ohio(64000)
- Department Of The Interior (Doi)
- $219,128.31
- Department Of The Interior (Doi)
- 140P6419C0005
- Igf::Ot::Igf Project Work Consists Of Work Will Involve The Installation Of Two (2) New Gas-Fired High Efficiency Boilers With Associated Controls And Piping To Provide Moderate Levels Of Heat During The Shoulder Seasons. The New Boilers Will Be Connected To The Buildings Air Handling Unit And Designed To Work In Coordination With The Air Conditioning System.
- 25 Apr 2019
- Igf::Ot::Igf Project Work Consists Of Work Will Involve The Installation Of Two (2) New Gas-Fired High Efficiency Boilers With Associated Controls And Piping To Provide Moderate Levels Of Heat During The Shoulder Seasons. The New Boilers Will Be Connected To The Buildings Air Handling Unit And Designed To Work In Coordination With The Air Conditioning System.
- Mwr Ohio(64000)
- Department Of The Interior (Doi)
- $66,611.50
- Department Of The Interior (Doi)
- 1263PX19P0064
- Fan Replacements On Hru-1 At Houghton Lab.
- 25 Jun 2019
- Fan Replacements On Hru-1 At Houghton Lab.
- Usda Forest Service
- Department Of Agriculture (Usda)
- $3,800.00
- Department Of Agriculture (Usda)
- 140P6419P0012
- Igf::Ot::Igf Estar Boiler Repair - Visitor Center Sow Page 2
- 4 Feb 2019
- Igf::Ot::Igf Estar Boiler Repair - Visitor Center Sow Page 2
- Mwr Ohio(64000)
- Department Of The Interior (Doi)
- $8,300.00
- Department Of The Interior (Doi)
- INP17PC00162
- Igf::Ot::Igf G:Estar Construction, Quincy Mine Office Heating System Replacement, Consisting Of Removal, Disposal Of And The Replacement Of The Boiler Heating System At Keweenaw Np, Boiler Unit With High Efficiency, P12*, 52.223-15 Energy Efficiency In Energy-Consuming Products December 2007 The Purpose Of This Modification Is The Following: 1. Mutually Agreed Upon Performance Of Work Within Scope For The Purchase Of 21Ea New Cast Iron Radiators To Replace The Existing Radiators And The Replacement Of Unserviceable Flooring. 2. Add Funding For Work Within Scope.
- 9 Jun 2017
- Igf::Ot::Igf G:Estar Construction, Quincy Mine Office Heating System Replacement, Consisting Of Removal, Disposal Of And The Replacement Of The Boiler Heating System At Keweenaw Np, Boiler Unit With High Efficiency, P12*, 52.223-15 Energy Efficiency In Energy-Consuming Products December 2007 The Purpose Of This Modification Is The Following: 1. Mutually Agreed Upon Performance Of Work Within Scope For The Purchase Of 21Ea New Cast Iron Radiators To Replace The Existing Radiators And The Replacement Of Unserviceable Flooring. 2. Add Funding For Work Within Scope.
- Mwr Ohio(64000)
- Department Of The Interior (Doi)
- $219,128.31
- Department Of The Interior (Doi)
- INP17PC00162
- Igf::Ot::Igf G:Estar Construction, Quincy Mine Office Heating System Replacement, Consisting Of Removal, Disposal Of And The Replacement Of The Boiler Heating System At Keweenaw Np, Boiler Unit With High Efficiency, P12*, 52.223-15 Energy Efficiency In Energy-Consuming Products December 2007 The Purpose Of This Modification Is The Following: 1. Funding Action Only, The De-Obligation Of .09 Cents In Order To Remove Excess Funding And Close Out Contract.
- 23 Oct 2017
- Igf::Ot::Igf G:Estar Construction, Quincy Mine Office Heating System Replacement, Consisting Of Removal, Disposal Of And The Replacement Of The Boiler Heating System At Keweenaw Np, Boiler Unit With High Efficiency, P12*, 52.223-15 Energy Efficiency In Energy-Consuming Products December 2007 The Purpose Of This Modification Is The Following: 1. Funding Action Only, The De-Obligation Of .09 Cents In Order To Remove Excess Funding And Close Out Contract.
- Mwr Ohio(64000)
- Department Of The Interior (Doi)
- $219,128.31
- Department Of The Interior (Doi)
- INP17PC00162
- Igf::Ot::Igf G:Estar Construction, Quincy Mine Office Heating System Replacement, Consisting Of Removal, Disposal Of And The Replacement Of The Boiler Heating System At Keweenaw Np, Boiler Unit With High Efficiency, P12*, 52.223-15 Energy Efficiency In Energy-Consuming Products December 2007 The Purpose Of This Modification Is The Following: 1. Administrative Change To The Period Of Performance End Date. Period Of Performance End Date Is Changed From 11/3/17 To 9/27/17. Project Work Is Complete And Final Payment Has Been Authorized.
- 27 Sep 2017
- Igf::Ot::Igf G:Estar Construction, Quincy Mine Office Heating System Replacement, Consisting Of Removal, Disposal Of And The Replacement Of The Boiler Heating System At Keweenaw Np, Boiler Unit With High Efficiency, P12*, 52.223-15 Energy Efficiency In Energy-Consuming Products December 2007 The Purpose Of This Modification Is The Following: 1. Administrative Change To The Period Of Performance End Date. Period Of Performance End Date Is Changed From 11/3/17 To 9/27/17. Project Work Is Complete And Final Payment Has Been Authorized.
- Mwr Ohio(64000)
- Department Of The Interior (Doi)
- $219,128.31
- Department Of The Interior (Doi)