M.E.R.I.T., Inc.
CAGE Code: 3CCH6
NCAGE Code: 3CCH6
Status: Active
Type: Commercial Supplier
Dun & Bradstreet (DUNS): 801619425
Summary
M.E.R.I.T., Inc. is an Active Commercial Supplier with the Cage Code 3CCH6 and is tracked by Dun & Bradstreet under DUNS Number 801619425..
Address
211 Warren St
Ste 224
Newark NJ 07103-3572
United States
Points of Contact
No Points of Contact...
Related Information
People who viewed this 'CAGE Code' also viewed...
Aisha And Harper Domestic Awareness Mann Technical Corp Ametek, Inc. Lyndon Aircraft Inc Aa Food Service Inc Usm Corp Rockwell Division Smiths Detection, Inc Automatic Winding Co Metco Electronics Inc Leisure Fitness Equipment Llc Combined Kitchen Equipment Co Inc Stanton Equipment Co Inc Jerry Biro Spacenow! Corporation Zigzag Solutions Llc Artesian Lab Inc Fanning Frank G Co Out Of This World Syed Rasheedah Artisan Manufacturing Corporation
Frequently Asked Questions (FAQ) for CAGE 3CCH6
- What is CAGE Code 3CCH6?
- 3CCH6 is the unique identifier used by NATO Organizations to reference the physical entity known as M.E.R.I.T., Inc. located at 211 Warren St, Ste 224, Newark NJ 07103-3572, United States.
- Who is CAGE Code 3CCH6?
- 3CCH6 refers to M.E.R.I.T., Inc. located at 211 Warren St, Ste 224, Newark NJ 07103-3572, United States.
- Where is CAGE Code 3CCH6 Located?
- CAGE Code 3CCH6 is located in Newark, NJ, USA.
Contracting History for CAGE 3CCH6 Most Recent 25 Records
- FA448423F0273
- Macc Task Order: Contractor Shall Modernize Existing Elevator At Building 150, Jb Mdl
- 13 Sep 2023
- Macc Task Order: Contractor Shall Modernize Existing Elevator At Building 150, Jb Mdl
- Fa4484 87 Cons Pk
- Department Of Defense (Dod)
- $130,327.84
- Department Of Defense (Dod)
- FA448423F0260
- Macc Task Order: Contractor Shall Replace Building 6558 Swing Gate At Jb Mdl
- 30 Aug 2023
- Macc Task Order: Contractor Shall Replace Building 6558 Swing Gate At Jb Mdl
- Fa4484 87 Cons Pk
- Department Of Defense (Dod)
- $3,626.72
- Department Of Defense (Dod)
- FA448423F0161
- Macc Task Order: Project Number Ptfx 22-4001 Building 5656 Sign Replacement And Landscaping, Jb Mdl
- 8 May 2023
- Macc Task Order: Project Number Ptfx 22-4001 Building 5656 Sign Replacement And Landscaping, Jb Mdl
- Fa4484 87 Cons Pk
- Department Of Defense (Dod)
- $227,471.16
- Department Of Defense (Dod)
- FA448423F0164
- Macc Task Order: Project Number Ptfl 22-1013 - Contractor Shall Renovate Buildings 2315 And 5455 At Jb Mdl
- 11 May 2023
- Macc Task Order: Project Number Ptfl 22-1013 - Contractor Shall Renovate Buildings 2315 And 5455 At Jb Mdl
- Fa4484 87 Cons Pk
- Department Of Defense (Dod)
- $34,925.44
- Department Of Defense (Dod)
- FA448423F0159
- Macc Task Order: Project Number Ptfx 23-1002 - Contractor Shall Replace Bldg 5656 Chiller, Jb Mdl
- 15 May 2023
- Macc Task Order: Project Number Ptfx 23-1002 - Contractor Shall Replace Bldg 5656 Chiller, Jb Mdl
- Fa4484 87 Cons Pk
- Department Of Defense (Dod)
- $2,205,024.28
- Department Of Defense (Dod)
- FA448423F0130
- Macc Task Order Mod: Incorporated A Within Scope Additional Work To The Project At Building 678.
- 12 May 2023
- Macc Task Order Mod: Incorporated A Within Scope Additional Work To The Project At Building 678.
- Fa4484 87 Cons Pk
- Department Of Defense (Dod)
- $35,348.29
- Department Of Defense (Dod)
- FA448423F0130
- Macc Task Order: Work Order Number 1212-5484: Contractor Shall Convert Room 119 In Building 678 At Jb Mdl To A Security Room
- 24 Mar 2023
- Macc Task Order: Work Order Number 1212-5484: Contractor Shall Convert Room 119 In Building 678 At Jb Mdl To A Security Room
- Fa4484 87 Cons Pk
- Department Of Defense (Dod)
- $35,348.29
- Department Of Defense (Dod)
- FA448423F0125
- B4309 Replace Gas-Fired Duct Furnace.
- 21 Mar 2023
- B4309 Replace Gas-Fired Duct Furnace.
- Fa4484 87 Cons Pk
- Department Of Defense (Dod)
- $12,391.37
- Department Of Defense (Dod)
- FA448423F0125
- B4309 Replace Gas-Fired Duct Furnace - Modification To Extend The Period Of Performance From 22 May 2023 To 30 August 2023 Due To Manufacturer Delay.
- 22 May 2023
- B4309 Replace Gas-Fired Duct Furnace - Modification To Extend The Period Of Performance From 22 May 2023 To 30 August 2023 Due To Manufacturer Delay.
- Fa4484 87 Cons Pk
- Department Of Defense (Dod)
- $12,391.37
- Department Of Defense (Dod)
- FA448423F0168
- Macc Task Order: Project Number Ptfl 17-1016: The Contractor Shall Replace The Roof At Building 2901, Jb Mdl
- 19 May 2023
- Macc Task Order: Project Number Ptfl 17-1016: The Contractor Shall Replace The Roof At Building 2901, Jb Mdl
- Fa4484 87 Cons Pk
- Department Of Defense (Dod)
- $1,701,717.28
- Department Of Defense (Dod)
- FA448423F0125
- B4309 Replace Gas-Fired Duct Furnace - Modification To Extend The Period Of Performance From 30 August 2023 To 29 September 2023.
- 30 Aug 2023
- B4309 Replace Gas-Fired Duct Furnace - Modification To Extend The Period Of Performance From 30 August 2023 To 29 September 2023.
- Fa4484 87 Cons Pk
- Department Of Defense (Dod)
- $12,391.37
- Department Of Defense (Dod)
- FA448423F0168
- Macc Task Order Mod: Extended The Completion Date Of The Project At Building 2901
- 13 Sep 2023
- Macc Task Order Mod: Extended The Completion Date Of The Project At Building 2901
- Fa4484 87 Cons Pk
- Department Of Defense (Dod)
- $1,701,717.28
- Department Of Defense (Dod)
- FA448423F0124
- Macc Task Order: Project Number Msbl 17-1009: The Contractor Shall Repair Retaining Wall And Swale At Building 620 Jb Mdl
- 20 Mar 2023
- Macc Task Order: Project Number Msbl 17-1009: The Contractor Shall Repair Retaining Wall And Swale At Building 620 Jb Mdl
- Fa4484 87 Cons Pk
- Department Of Defense (Dod)
- $134,179.53
- Department Of Defense (Dod)
- FA448423F0111
- Macc Task Order Mod: Incorporated A Within Scope Additional Work To The Project In Building 5317
- 9 Aug 2023
- Macc Task Order Mod: Incorporated A Within Scope Additional Work To The Project In Building 5317
- Fa4484 87 Cons Pk
- Department Of Defense (Dod)
- $194,127.60
- Department Of Defense (Dod)
- FA448423F0111
- Macc Task Order Mod: The Purpose Of This Modification Is To Extend The Task Order Completion Date
- 28 Sep 2023
- Macc Task Order Mod: The Purpose Of This Modification Is To Extend The Task Order Completion Date
- Fa4484 87 Cons Pk
- Department Of Defense (Dod)
- $194,127.60
- Department Of Defense (Dod)
- FA448423F0111
- Macc Task Order: Project Number Hekp22-1013: The Contractor Shall Repair Building 5317, Jb Mdl
- 23 Feb 2023
- Macc Task Order: Project Number Hekp22-1013: The Contractor Shall Repair Building 5317, Jb Mdl
- Fa4484 87 Cons Pk
- Department Of Defense (Dod)
- $164,009.66
- Department Of Defense (Dod)
- FA448423F0134
- Task Order B2424 Repair Hvac
- 3 Apr 2023
- Task Order B2424 Repair Hvac
- Fa4484 87 Cons Pk
- Department Of Defense (Dod)
- $2,861,349.89
- Department Of Defense (Dod)
- FA448423F0058
- B5321 Hvac Frontend Installation - Modification To Add Clin 0002 For Additional Work Within Scope In The Amount Of $8,782.53 Increasing The Total Contract From $38,468.43 To $47,250.96.
- 14 Aug 2023
- B5321 Hvac Frontend Installation - Modification To Add Clin 0002 For Additional Work Within Scope In The Amount Of $8,782.53 Increasing The Total Contract From $38,468.43 To $47,250.96.
- Fa4484 87 Cons Pk
- Department Of Defense (Dod)
- $47,250.96
- Department Of Defense (Dod)
- FA448423F0058
- B5321 Jace Frontend Installation
- 12 Dec 2022
- B5321 Jace Frontend Installation
- Fa4484 87 Cons Pk
- Department Of Defense (Dod)
- $47,250.96
- Department Of Defense (Dod)
- FA448423F0058
- B5321 Hvac Frontend Installation - Modification To Extend The Period Of Performance From 12 June 2023 To 31 August 2023.
- 8 Jun 2023
- B5321 Hvac Frontend Installation - Modification To Extend The Period Of Performance From 12 June 2023 To 31 August 2023.
- Fa4484 87 Cons Pk
- Department Of Defense (Dod)
- $47,250.96
- Department Of Defense (Dod)
- FA448423F0058
- B5321 Hvac Front End Installation - Modification To Extend The Period Of Performance From 31 August 2023 To 29 September 2023.
- 1 Sep 2023
- B5321 Hvac Front End Installation - Modification To Extend The Period Of Performance From 31 August 2023 To 29 September 2023.
- Fa4484 87 Cons Pk
- Department Of Defense (Dod)
- $47,250.96
- Department Of Defense (Dod)
- FA448423F0067
- B2426 Fire Suppression Upgrade
- 29 Dec 2022
- B2426 Fire Suppression Upgrade
- Fa4484 87 Cons Pk
- Department Of Defense (Dod)
- $12,687.58
- Department Of Defense (Dod)
- FA448423F0075
- Macc Task Order: Project Number Ptfl22-1014 - The Contractor Shall Repair 1St Floor In Building 1907, Joint Base Mcguire Dix Lakehurst.
- 10 Jan 2023
- Macc Task Order: Project Number Ptfl22-1014 - The Contractor Shall Repair 1St Floor In Building 1907, Joint Base Mcguire Dix Lakehurst.
- Fa4484 87 Cons Pk
- Department Of Defense (Dod)
- $2,730,264.72
- Department Of Defense (Dod)
- FA448423F0075
- Macc Task Order Mod: Incorporate A Combined Within Scope Additional Work To The Project In Bldg 1907
- 21 Apr 2023
- Macc Task Order Mod: Incorporate A Combined Within Scope Additional Work To The Project In Bldg 1907
- Fa4484 87 Cons Pk
- Department Of Defense (Dod)
- $4,217,319.74
- Department Of Defense (Dod)
- FA448423F0075
- Macc Task Order Mod: Incorporated A Combined Within Scope Additional Work To The Project In Building 1907
- 27 Jun 2023
- Macc Task Order Mod: Incorporated A Combined Within Scope Additional Work To The Project In Building 1907
- Fa4484 87 Cons Pk
- Department Of Defense (Dod)
- $4,217,319.74
- Department Of Defense (Dod)