Tunheim Construction, Llc
CAGE Code: 36UY4
NCAGE Code: 36UY4
Status: Active
Type: Commercial Supplier
Dun & Bradstreet (DUNS): 179613372
Summary
Tunheim Construction, Llc is an Active Commercial Supplier with the Cage Code 36UY4 and is tracked by Dun & Bradstreet under DUNS Number 179613372..
Address
4256 40Th Ave S
Moorhead MN 56560-7500
United States
Points of Contact
No Points of Contact...
Related Information
People who viewed this 'CAGE Code' also viewed...
Hannahers Inc Gonzalez Desiree Municipal Industrial Contracting Haldeman Homme Inc Jiffy Jons Inc Xerox Corp Eckroth Music Brians Scuba Inc Dba Paradise Divers Abbott, Arne, Schwindt, Inc Moorhead State University Office Of Northwest Divers Inc D & M Industries Inc. The Concordia College Corporation Nova Tech Of Fargo-Moorhead Rick Electric, Inc. Regency Inn And Conference Center Tidywerkz Llc Wagners Yard Services, Llc Stenerson Bros. Lumber Company Transport Inc
Frequently Asked Questions (FAQ) for CAGE 36UY4
- What is CAGE Code 36UY4?
- 36UY4 is the unique identifier used by NATO Organizations to reference the physical entity known as Tunheim Construction, Llc located at 4256 40Th Ave S, Moorhead MN 56560-7500, United States.
- Who is CAGE Code 36UY4?
- 36UY4 refers to Tunheim Construction, Llc located at 4256 40Th Ave S, Moorhead MN 56560-7500, United States.
- Where is CAGE Code 36UY4 Located?
- CAGE Code 36UY4 is located in Moorhead, MN, USA.
Contracting History for CAGE 36UY4 Most Recent 25 Records
- 47PF0022F0695
- Removing Pavement, New Asphalt, New Concrete Pavement, New Pavement Markings, Temporary Work Zone Traffic Control, New Canopy Downspouts And Gutter, Painting Canopy Steel, New Sanitary Sewer Service - Paving And Drainage Repairs - Baudette, Minnesota
- 16 Jun 2022
- Removing Pavement, New Asphalt, New Concrete Pavement, New Pavement Markings, Temporary Work Zone Traffic Control, New Canopy Downspouts And Gutter, Painting Canopy Steel, New Sanitary Sewer Service - Paving And Drainage Repairs - Baudette, Minnesota
- Pbs R5
- General Services Administration (Gsa)
- $463,245.23
- General Services Administration (Gsa)
- 47PF0022F0695
- Perform Sealcoating, Painting, Replace Four Stoops, Replace Rock With Concrete, Remove Asphalt And Sonotube - Paving And Drainage Repairs - Land Port Of Entry/Border Station - Mn0600zz - Warroad, Minnesota
- 15 Sep 2022
- Perform Sealcoating, Painting, Replace Four Stoops, Replace Rock With Concrete, Remove Asphalt And Sonotube - Paving And Drainage Repairs - Land Port Of Entry/Border Station - Mn0600zz - Warroad, Minnesota
- Pbs R5
- General Services Administration (Gsa)
- $464,864.28
- General Services Administration (Gsa)
- 47PF0022F0695
- Update Funding Fixed Asset Rmn00315mn0600zz Information From Cipimp To Improvmnt - Paving & Drainage Repairs - Land Port Of Entry-Border Station - Baudette, Minnesota
- 26 Jan 2023
- Update Funding Fixed Asset Rmn00315mn0600zz Information From Cipimp To Improvmnt - Paving & Drainage Repairs - Land Port Of Entry-Border Station - Baudette, Minnesota
- Pbs R5
- General Services Administration (Gsa)
- $464,864.28
- General Services Administration (Gsa)
- 12FPC321C0010
- Hoffman & Erickson Wetland Restoration Easement
- 15 Oct 2021
- Hoffman & Erickson Wetland Restoration Easement
- Fpac Bus Cntr-Acq Div-Ops Bra-Sec 3
- Department Of Agriculture (Usda)
- $138,498.11
- Department Of Agriculture (Usda)
- 12FPC321C0010
- Hoffman & Erickson Wetland Restoration Easement
- 19 Apr 2021
- Hoffman & Erickson Wetland Restoration Easement
- Fpac Bus Cntr-Acq Div-Ops Bra-Sec 3
- Department Of Agriculture (Usda)
- $138,498.11
- Department Of Agriculture (Usda)
- W912ES21C0006
- Adjust The Estimated Quantities To Final Quantities For Clin 0006Ab (Stripping), Clin 0008Aa (Subgrade Excavation First 5,000 Cy) And Clin 0008Ab (Subgrade Excavation Over 5,000 Cy).
- 14 Sep 2023
- Adjust The Estimated Quantities To Final Quantities For Clin 0006Ab (Stripping), Clin 0008Aa (Subgrade Excavation First 5,000 Cy) And Clin 0008Ab (Subgrade Excavation Over 5,000 Cy).
- W07v Endist St Paul
- Department Of Defense (Dod)
- $2,956,514.79
- Department Of Defense (Dod)
- W912ES21C0006
- First 95,000 Cy
- 29 Oct 2021
- First 95,000 Cy
- W07v Endist St Paul
- Department Of Defense (Dod)
- $2,249,362.29
- Department Of Defense (Dod)
- W912ES21C0006
- First 95,000 Cy
- 20 Apr 2021
- First 95,000 Cy
- W07v Endist St Paul
- Department Of Defense (Dod)
- $2,231,275.00
- Department Of Defense (Dod)
- W912ES21C0006
- : Increasing Clins 0009Ab Excavation, 0010Ab Borrow Excavation, And 0013Ab Topsoil Respread And Decreasing Clins 0005 Road Removal, 0011 Geotextile - Type 2, 0031 R140 Riprap, 0033 B2 Bedding And 0034 Geotextile - Type 1.
- 25 Jan 2023
- : Increasing Clins 0009Ab Excavation, 0010Ab Borrow Excavation, And 0013Ab Topsoil Respread And Decreasing Clins 0005 Road Removal, 0011 Geotextile - Type 2, 0031 R140 Riprap, 0033 B2 Bedding And 0034 Geotextile - Type 1.
- W07v Endist St Paul
- Department Of Defense (Dod)
- $2,975,009.00
- Department Of Defense (Dod)
- W912ES21C0006
- Final Veq, Buy American Act Waiver, And Misc Changes.
- 21 Jun 2023
- Final Veq, Buy American Act Waiver, And Misc Changes.
- W07v Endist St Paul
- Department Of Defense (Dod)
- $2,956,514.79
- Department Of Defense (Dod)
- W912ES21C0006
- Fmm Se-1
- 24 Feb 2023
- Fmm Se-1
- W07v Endist St Paul
- Department Of Defense (Dod)
- $2,975,009.00
- Department Of Defense (Dod)
- W912ES21C0006
- Modification To Compensate Contactor For Additional Effort Due To The Discovery Of Wet And Unstable Material.
- 13 Apr 2022
- Modification To Compensate Contactor For Additional Effort Due To The Discovery Of Wet And Unstable Material.
- W07v Endist St Paul
- Department Of Defense (Dod)
- $2,683,201.49
- Department Of Defense (Dod)
- W912ES21C0006
- This Contract Is Modified To: R-017: Contract Modification To Recover The Fixed Costs Associated With The Underruns Of Clins 0008Aa, 0030, 0031, 0032, 0033, And 0034.
- 10 Mar 2023
- This Contract Is Modified To: R-017: Contract Modification To Recover The Fixed Costs Associated With The Underruns Of Clins 0008Aa, 0030, 0031, 0032, 0033, And 0034.
- W07v Endist St Paul
- Department Of Defense (Dod)
- $2,975,009.00
- Department Of Defense (Dod)
- W912ES21C0006
- Add Internet To Jobsite Trailer
- 25 Jun 2021
- Add Internet To Jobsite Trailer
- W07v Endist St Paul
- Department Of Defense (Dod)
- $2,231,275.00
- Department Of Defense (Dod)
- W912ES21C0006
- Fmm Southern Embankment Reach Se-1
- 1 Apr 2021
- Fmm Southern Embankment Reach Se-1
- W07v Endist St Paul
- Department Of Defense (Dod)
- $2,231,275.00
- Department Of Defense (Dod)
- W912ES21C0006
- First 95,000 Cy
- 9 Dec 2021
- First 95,000 Cy
- W07v Endist St Paul
- Department Of Defense (Dod)
- $2,249,362.29
- Department Of Defense (Dod)
- W912ES21C0006
- Adjust The Estimated Contract Quantities For Clins 0009Ab Excavation, 0010Ab Borrow Excavation, 0015 Turf Reinforcing Mat, 0019 15 Csp, 0020 30 Csp, And 0021 36 Csp To An Interim Quantity Based On Calculated And Ed Overruns.
- 27 Jun 2022
- Adjust The Estimated Contract Quantities For Clins 0009Ab Excavation, 0010Ab Borrow Excavation, 0015 Turf Reinforcing Mat, 0019 15 Csp, 0020 30 Csp, And 0021 36 Csp To An Interim Quantity Based On Calculated And Ed Overruns.
- W07v Endist St Paul
- Department Of Defense (Dod)
- $2,761,447.98
- Department Of Defense (Dod)
- W912ES21C0006
- Veq To Increase Clin 0012 From 7000 Tons To 11,109 Tons. Veq Is Due To An Error In The Quantity Calculation During Design.
- 24 Feb 2023
- Veq To Increase Clin 0012 From 7000 Tons To 11,109 Tons. Veq Is Due To An Error In The Quantity Calculation During Design.
- W07v Endist St Paul
- Department Of Defense (Dod)
- $2,975,009.00
- Department Of Defense (Dod)
- W912ES21C0006
- Fmm Se-1
- 20 May 2022
- Fmm Se-1
- W07v Endist St Paul
- Department Of Defense (Dod)
- $2,683,201.49
- Department Of Defense (Dod)
- W912ES21C0006
- Correction To A Prior Modification To Correct A Quantity That Inadvertently Got Changed.
- 12 Jul 2023
- Correction To A Prior Modification To Correct A Quantity That Inadvertently Got Changed.
- W07v Endist St Paul
- Department Of Defense (Dod)
- $2,956,514.79
- Department Of Defense (Dod)
- 12FPC320F0103
- Wrp Easement Maintenance - Mn
- 1 Sep 2020
- Wrp Easement Maintenance - Mn
- Fpac Bus Cntr-Acq Div-Ops Bra-Sec 3
- Department Of Agriculture (Usda)
- $0.00
- Department Of Agriculture (Usda)
- 12FPC320F0035
- Wrp Easement Construction Mn
- 3 Mar 2020
- Wrp Easement Construction Mn
- Fpac Bus Cntr-Acq Div-Ops Bra-Sec 3
- Department Of Agriculture (Usda)
- $0.00
- Department Of Agriculture (Usda)
- 12FPC319D0003
- Modification P00006: The Purpose Of This Modification Is To Change The Following: 1. Change The Contract Specialist From Madeline Allison To Amy Smith. 2. Change The Contracting Officer From Oriel Velez-Olivieri To Ryan Lorimer. All Other Te
- 7 Nov 2022
- Modification P00006: The Purpose Of This Modification Is To Change The Following: 1. Change The Contract Specialist From Madeline Allison To Amy Smith. 2. Change The Contracting Officer From Oriel Velez-Olivieri To Ryan Lorimer. All Other Te
- Fpac Bus Cntr-Acq Div-Ops Bra-Sec 3
- Department Of Agriculture (Usda)
- $3,349,898.81
- Department Of Agriculture (Usda)
- 12FPC320F0234
- Wrp Easement Maintenance Mn
- 4 Sep 2020
- Wrp Easement Maintenance Mn
- Fpac Bus Cntr-Acq Div-Ops Bra-Sec 3
- Department Of Agriculture (Usda)
- $0.00
- Department Of Agriculture (Usda)
- 12FPC319D0003
- Add Funds - Bid Line Item 13 Matter Site Gully Repairs And The Removal Of Two Pipe Structures
- 16 Dec 2021
- Add Funds - Bid Line Item 13 Matter Site Gully Repairs And The Removal Of Two Pipe Structures
- Fpac Bus Cntr-Acq Div-Ops Bra-Sec 3
- Department Of Agriculture (Usda)
- $3,349,898.81
- Department Of Agriculture (Usda)