Joseph P Harvey Pe Pc
Div Jp Harvey Engineering Solutions

CAGE Code: 1Y3Z4

NCAGE Code: 1Y3Z4

Status: Active

Type: Commercial Supplier

Dun & Bradstreet (DUNS): 121830525

CAGE 1Y3Z4 Joseph P Harvey Pe Pc Div Jp Harvey Engineering Solutions
CAGE 1Y3Z4 Joseph P Harvey Pe Pc

Summary

Joseph P Harvey Pe Pc, Div Jp Harvey Engineering Solutions is an Active Commercial Supplier with the Cage Code 1Y3Z4 and is tracked by Dun & Bradstreet under DUNS Number 121830525..

Address

29 Kings Way
Hampton VA 23669-3503
United States

Points of Contact

Related Information

Associated CAGE Codes People who viewed this 'CAGE Code' also viewed...

CAGE Code FAQ Frequently Asked Questions (FAQ) for CAGE 1Y3Z4

What is CAGE Code 1Y3Z4?
1Y3Z4 is the unique identifier used by NATO Organizations to reference the physical entity known as Joseph P Harvey Pe Pc Div Jp Harvey Engineering Solutions located at 29 Kings Way, Hampton VA 23669-3503, United States.
Who is CAGE Code 1Y3Z4?
1Y3Z4 refers to Joseph P Harvey Pe Pc Div Jp Harvey Engineering Solutions located at 29 Kings Way, Hampton VA 23669-3503, United States.
Where is CAGE Code 1Y3Z4 Located?
CAGE Code 1Y3Z4 is located in Hampton, VA, USA.

Contracting History for CAGE 1Y3Z4 Contracting History for CAGE 1Y3Z4 Most Recent 25 Records

FA480022F0086
The Original Award Was For An A-E Repair Of The Infrastructure Systems On A F-22 Hangar On Langley Afb. Va. This Mod Extends The Period Of Performance By 123 Days Due To Mutual Delays Caused By The Government And The Contractor.
20 Dec 2022
Fa4800 633 Cons Pkp
Department Of Defense (Dod)
$403,707.46
FA480022F0086
The Purpose Of This Requirement Is For An A&E Design To Repair Infrastructure Systems, F-22 Hangar, 1 Fw F. 791.
23 Jun 2022
Fa4800 633 Cons Pkp
Department Of Defense (Dod)
$403,707.46
FA480022F0086
This Project Is The Design To Repair Infrastructure Systems, F-22 Hangar, Facility 791.
28 Jul 2023
Fa4800 633 Cons Pkp
Department Of Defense (Dod)
$403,707.46
FA480022F0086
This Design Is To Repair The Infrastructure Systems For The F-22 Hangar, 1Fw, Facility 791.
17 May 2023
Fa4800 633 Cons Pkp
Department Of Defense (Dod)
$403,707.46
FA480022F0046
The Original Award Was For The A-E To Design The Repair Of Failing Hvac System In Facility 361. This Modification Extends The Period Of Performance By 32 Days To Allow The Government Time To Determine If The Project Shall Continue.
5 Oct 2022
Fa4800 633 Cons Pkp
Department Of Defense (Dod)
$139,890.58
FA480022F0065
The Original Purpose Of This Award Is To Rehabilitate And Repair Dormitory, B. 699. The Purpose Of This Modification Is To Extend The Period Of Performance Due To Delays In Reviewing And Accepting The Previous Submittal.
3 Apr 2023
Fa4800 633 Cons Pkp
Department Of Defense (Dod)
$583,624.09
FA480022F0065
The Purpose Of This Award For Project Hert 18-3057 Is A Design To Rehabilitate And Repair Dormitory B699
15 Jul 2022
Fa4800 633 Cons Pkp
Department Of Defense (Dod)
$583,624.09
FA480022F0065
This Design Is To Rehabilitate And Repair Dormitory Building 699.
2 Jun 2023
Fa4800 633 Cons Pkp
Department Of Defense (Dod)
$583,624.09
FA480021F0242
Original Award Was For Architect-Engineer Design To Replace/Relocate Acc Campus Cooling Tower. This Modification Extends The Period Of Performance 27 Calendar Days To Allow The Contractor To Complete The Design Due To Government Delays.
22 Sep 2022
Fa4800 633 Cons Pkp
Department Of Defense (Dod)
$210,285.84
FA480021F0242
The Original Award Was For The A-E To Accomplish A Design To Replace/Relocate The Acc Campus Cooling Tower On Langley, Afb, Va. The Period Of Performance Is Being Extended 142 Days To Allow Time For Potential Design Changes To Be Finalized.
20 Dec 2022
Fa4800 633 Cons Pkp
Department Of Defense (Dod)
$210,285.84
FA480021F0242
The Original Purpose Of This Award Is An A&E Design To Replace And Relocate The Acc Cooling Towers.
17 Apr 2023
Fa4800 633 Cons Pkp
Department Of Defense (Dod)
$210,285.84
FA480021F0242
Original Award Was For Architect-Engineer Design To Replace/Relocate Acc Campus Cooling Tower. This Modification Extends The Period Of Performance 13 Calendar Days To Allow The Contractor To Complete The Design Due To Government Delays.
18 Oct 2022
Fa4800 633 Cons Pkp
Department Of Defense (Dod)
$210,285.84
FA480021F0242
This Project Is For The Design To Repair And Relocate The Acc Campus Cooling Tower. This Mod Extends The Completion Date From 21 June 2022 To 22 September 2022. Additional Time Provided Due To Government Delays In Deciding Location For Cooling Tower.
2 Mar 2022
Fa4800 633 Cons Pkp
Department Of Defense (Dod)
$210,285.84
FA480021F0242
The Original Award Was For The A-E To Accomplish A Design To Replace And Relocate Acc Campus Cooling Tower. The Purpose Of This Modification Is To Extend The Pop By 61 Calendar Days And To Suspend The Progress On The Design Pending Government Changes
22 Mar 2023
Fa4800 633 Cons Pkp
Department Of Defense (Dod)
$210,285.84
FA480021F0242
Muhj 17-4025, Replace And Relocate Cooling Tower/At Joint Base Langley-Eustis
24 Sep 2021
Fa4800 633 Cons Pkp
Department Of Defense (Dod)
$210,285.84
FA480021D0005
Provides Architect And Engineer (A-E) Title I Services (Design) And Title Ii Services (Construction Support) For Joint Base Langley-Eustis, Va.
19 Jul 2023
Fa4800 633 Cons Pkp
Department Of Defense (Dod)
$0.00
FA480021D0005
Joint Base Langley-Eustis (Jble) Va Architect And Engineer (A-E) Services. This Contract Provides Title I, Design Services, And/Or Title Ii, Construction Support Services In Support Of Jble.
20 Aug 2021
Fa4800 633 Cons Pkp
Department Of Defense (Dod)
$0.00
FA480021D0005
This Joint Base Langley-Eustis (Jble), Virginia Architect And Engineer (A-E) Services Contract Is For Title I, Design Services And Title Ii, Construction Support Services. This Modification (P00001) Exercises Option Year 1 Of The Contract.
21 Jul 2022
Fa4800 633 Cons Pkp
Department Of Defense (Dod)
$0.00
FA480018F0406
Igf::Ot::Igf Muhj 17-4103 Repair Pad Mounted Transf
17 Sep 2018
Fa4800 633 Cons Pkp
Department Of Defense (Dod)
$127,777.00
FA480018F0215
Muhj 18-7003 Design Airfield Fence
27 Aug 2018
Fa4800 633 Cons Pkp
Department Of Defense (Dod)
$158,662.49
FA480020F0062
Ae Design: Muhj 20-4021, Ftu Parking And Crosswalk Study
10 Mar 2020
Fa4800 633 Cons Pkp
Department Of Defense (Dod)
$91,204.92
FA480021F0299
The Original Purpose Of This Contract Is A&E: Repair Hangar For 2Nd Weapons Load Trainer, Mxg, F. 751. This Mod Will Extend The Completion Date To 11 July 2022 And Incorporate A Revised Sow To Include Additional Specifications In The Design.
18 Apr 2022
Fa4800 633 Cons Pkp
Department Of Defense (Dod)
$211,704.05
FA480021F0183
Joint Base Langley-Eustis (Jble) Architect And Engineer (A-E) Services - Minimum Guarantee
31 Aug 2021
Fa4800 633 Cons Pkp
Department Of Defense (Dod)
$2,000.00
FA480019FA292
A-E Design For Repair Wheel/Tire Shop F750 On Langley Afb, Va.
21 Sep 2019
Fa4800 633 Cons Pkp
Department Of Defense (Dod)
$154,092.38
FA480020F0065
Muhj 20-4030, (F-22 Ftu) Ae Design For Repair Parts Store Vault And Rate Mezzanine, Lrs, F. 777
10 Mar 2020
Fa4800 633 Cons Pkp
Department Of Defense (Dod)
$183,399.02