O'connor Construction Management,
Inc
Dba Oconnor Construction Management
Inc
CAGE Code: 1V0A2
NCAGE Code: 1V0A2
Status: Active
Type: Commercial Supplier
Dun & Bradstreet (DUNS): 108734468
Summary
O'connor Construction Management,, Inc, Dba Oconnor Construction Management, Inc is an Active Commercial Supplier with the Cage Code 1V0A2 and is tracked by Dun & Bradstreet under DUNS Number 108734468..
Address
8851 Research Dr
Irvine CA 92618-4236
United States
Points of Contact
Related Information
People who viewed this 'CAGE Code' also viewed...
Silicon Graphics Federal, Inc. Applied Microsystems Corp Synopsys Inc Global Data Center Ultrasystems Environmental Ultrasystems Environmental Automated Marine International Adaptiv Software Corp Inc World Library Inc Jonathan Engineered Solutions Corp. Bearing Engineers Inc Continus Software Corp Digicad Corp Elpac Electronics Inc Component Div Wbi Energy Services Inc Memory Intl Inc Love Charity Foundation Proteon Inc Developers General Contracting, Inc Oakley Inc
Frequently Asked Questions (FAQ) for CAGE 1V0A2
- What is CAGE Code 1V0A2?
- 1V0A2 is the unique identifier used by NATO Organizations to reference the physical entity known as O'connor Construction Management, Inc Dba Oconnor Construction Management Inc located at 8851 Research Dr, Irvine CA 92618-4236, United States.
- Who is CAGE Code 1V0A2?
- 1V0A2 refers to O'connor Construction Management, Inc Dba Oconnor Construction Management Inc located at 8851 Research Dr, Irvine CA 92618-4236, United States.
- Where is CAGE Code 1V0A2 Located?
- CAGE Code 1V0A2 is located in Irvine, CA, USA.
Contracting History for CAGE 1V0A2 Most Recent 25 Records
- GSP0908KS0028
- Cost Estimate For Domestic Water Retrofit Project
- 2 Jul 2008
- Cost Estimate For Domestic Water Retrofit Project
- Facilities Management&Svcs Program Division, Contracts Section
- General Services Administration (Gsa)
- $3,846.00
- General Services Administration (Gsa)
- GSP0915KT7011
- This Modification Is Being Issued To Extend The Pop End Date From 6/30/2018 To 9/30/2018 For The 450 Golden Gate Infrastructure Project At The Philip J Burton Federal Building And U.S. Courthouse Located In San Francisco, California. This Modification Is In The Amount Of $9,686.95 As Negotiated And Accepted On November 8, 2018. No Time Extension Will Be Added To Complete This Work. In Consideration Of This Modification Agreed To Herein As A Complete And Equitable Adjustment Of Both Cost And Time For The Work Incorporated In This Change, The Contractor Hereby Releases The Government From Any Further Liability Under This Contract For Any Additional Equitable Adjustment Attributable To The Circumstances Giving Rise To This Modification. End Of Modification
- 13 Nov 2018
- This Modification Is Being Issued To Extend The Pop End Date From 6/30/2018 To 9/30/2018 For The 450 Golden Gate Infrastructure Project At The Philip J Burton Federal Building And U.S. Courthouse Located In San Francisco, California. This Modification Is In The Amount Of $9,686.95 As Negotiated And Accepted On November 8, 2018. No Time Extension Will Be Added To Complete This Work. In Consideration Of This Modification Agreed To Herein As A Complete And Equitable Adjustment Of Both Cost And Time For The Work Incorporated In This Change, The Contractor Hereby Releases The Government From Any Further Liability Under This Contract For Any Additional Equitable Adjustment Attributable To The Circumstances Giving Rise To This Modification. End Of Modification
- Pbs R9 Acq Mgmt Div Projects Branch
- General Services Administration (Gsa)
- $1,108,602.17
- General Services Administration (Gsa)
- GSP0917NP0012
- Modification Ps04 - Implementation Of Section 889
- 30 Jan 2020
- Modification Ps04 - Implementation Of Section 889
- Pbs R9 - Los Angeles Service Center
- General Services Administration (Gsa)
- $687,816.55
- General Services Administration (Gsa)
- 47PK1718F0002
- "Cm Services: New U.S. Courthouse Follow-On Projects", U.S. Courthouse, 350 W. 1St Street, Los Angeles, Ca, Contract No. Gs-23F-0327P, Task Order No. 47Pk1718f0002, Modification Ps03 See Attached Modification Request 003, And Gsa Form 2630 Covering The Contract Modification. Your Proposal For Modification Request 003, Dated August 30, 2018, In The Amount Of $76,350.00 Is Hereby Accepted As An Addition To The Contract Task Order Referenced Above. This Modification Will Increase The Contract Amount By A Lump Sum Of $76,350.00, For A New Contract Total Amount Of $261,305.00. A Time Extension Of 122 Calendar Days Is Herein Incorporated For Work Associated With Modification Request 003. The Contract Completion Date Is Herein Extended To December 31, 2018. All Other Terms And Conditions Under The Contract Remain The Same.
- 18 Sep 2018
- "Cm Services: New U.S. Courthouse Follow-On Projects", U.S. Courthouse, 350 W. 1St Street, Los Angeles, Ca, Contract No. Gs-23F-0327P, Task Order No. 47Pk1718f0002, Modification Ps03 See Attached Modification Request 003, And Gsa Form 2630 Covering The Contract Modification. Your Proposal For Modification Request 003, Dated August 30, 2018, In The Amount Of $76,350.00 Is Hereby Accepted As An Addition To The Contract Task Order Referenced Above. This Modification Will Increase The Contract Amount By A Lump Sum Of $76,350.00, For A New Contract Total Amount Of $261,305.00. A Time Extension Of 122 Calendar Days Is Herein Incorporated For Work Associated With Modification Request 003. The Contract Completion Date Is Herein Extended To December 31, 2018. All Other Terms And Conditions Under The Contract Remain The Same.
- Pbs R9 - Los Angeles Service Center
- General Services Administration (Gsa)
- $419,303.22
- General Services Administration (Gsa)
- GSP1117YT0010
- Contract Number Gs-P-11-17-Yt-0010 Construction Quality Management Services At The Bostetter Courthouse For The Oversight Of 5 Consolidated Construction Projects Is Hereby Modified To De-Obligate A Total Of (-$30,940.18) As Follows: Clin 0001 (Replace Day Tank&Piping) - $4,571.25; Clin 0002 (Repaint&Replace Carpet In Basement) -$1,150; Clin 0003 (Replace Air Handling Units) -$23,465.18; And Clin 0004 (Furnish&Install New Domestic Water Booster Pump) -$1,753.75. As A Result Of This Modification, The Contract Completion Date Remains Unchanged At September 15, 2018. As A Result Of This Modification The Overall Contract Value Will Decrease By $30,940.18 From $299,115 To $268,174.82.
- 1 Feb 2019
- Contract Number Gs-P-11-17-Yt-0010 Construction Quality Management Services At The Bostetter Courthouse For The Oversight Of 5 Consolidated Construction Projects Is Hereby Modified To De-Obligate A Total Of (-$30,940.18) As Follows: Clin 0001 (Replace Day Tank&Piping) - $4,571.25; Clin 0002 (Repaint&Replace Carpet In Basement) -$1,150; Clin 0003 (Replace Air Handling Units) -$23,465.18; And Clin 0004 (Furnish&Install New Domestic Water Booster Pump) -$1,753.75. As A Result Of This Modification, The Contract Completion Date Remains Unchanged At September 15, 2018. As A Result Of This Modification The Overall Contract Value Will Decrease By $30,940.18 From $299,115 To $268,174.82.
- Pbs Ncr Repair&Alteration Ctr 3
- General Services Administration (Gsa)
- $268,174.82
- General Services Administration (Gsa)
- GSP0917KZ0004
- Igf::Ot::Igf Task Order Issued Againstfss Contract For Construction Management Services For The Oakland,Ca Us District Courtroom Renovation Project. The Period Of Performance Ends 3/4/2018.
- 4 Apr 2017
- Igf::Ot::Igf Task Order Issued Againstfss Contract For Construction Management Services For The Oakland,Ca Us District Courtroom Renovation Project. The Period Of Performance Ends 3/4/2018.
- Pbs R9 - San Fran Service Center
- General Services Administration (Gsa)
- $209,386.45
- General Services Administration (Gsa)
- GSP0406EX0009
- Cm Services
- 7 Aug 2008
- Cm Services
- Acquisition Division/Non-Prospectus (Section A)
- General Services Administration (Gsa)
- $3,949,416.52
- General Services Administration (Gsa)
- GSP0917KZ0004
- Igf::Ot::Igf This Modification Is Issued To Correct Billing Information In Easi By Changing Billing Codes From: 9Pcp/0001 To Bcfa/0001.
- 28 Aug 2017
- Igf::Ot::Igf This Modification Is Issued To Correct Billing Information In Easi By Changing Billing Codes From: 9Pcp/0001 To Bcfa/0001.
- Pbs R9 - San Fran Service Center
- General Services Administration (Gsa)
- $209,386.45
- General Services Administration (Gsa)
- GSP0917NP0012
- Mod Pa10 - Fix Accounting String
- 10 Mar 2021
- Mod Pa10 - Fix Accounting String
- Pbs R9 - Los Angeles Service Center
- General Services Administration (Gsa)
- $687,816.55
- General Services Administration (Gsa)
- GSP0406EX0009
- Deductive Modification For Services In Design Phase.
- 4 Jan 2010
- Deductive Modification For Services In Design Phase.
- Acquisition Div/Program Support&Capital Projects
- General Services Administration (Gsa)
- $3,949,416.52
- General Services Administration (Gsa)
- VA101F17F2798
- Igf::Ot::Igf Time Extension
- 19 Dec 2017
- Igf::Ot::Igf Time Extension
- Office Of Construction & Facilities Mgmt (36C10f)
- Department Of Veterans Affairs (Va)
- $52,040.00
- Department Of Veterans Affairs (Va)
- GS23F0327P
- Federal Supply Schedule Contract
- 5 Feb 2017
- Federal Supply Schedule Contract
- Gsa Fas Msc Acquisition
- General Services Administration (Gsa)
- $0.00
- General Services Administration (Gsa)
- GSP0917KT0004
- Purpose Of This Modification Is To Extend The Period Of Performance To 11/30/2018. Igf::Ct::Igf
- 18 Jul 2018
- Purpose Of This Modification Is To Extend The Period Of Performance To 11/30/2018. Igf::Ct::Igf
- Pbs R9 Acq Mgmt Div Projects Branch
- General Services Administration (Gsa)
- $319,630.00
- General Services Administration (Gsa)
- GSP0917NP0012
- Modification Ps08
- 14 Dec 2020
- Modification Ps08
- Pbs R9 - Los Angeles Service Center
- General Services Administration (Gsa)
- $687,816.55
- General Services Administration (Gsa)
- GS09P08KNC0039
- Correct The Expiration Date To September 30, 2011 Without Or Liability To Either Party.
- 29 Apr 2010
- Correct The Expiration Date To September 30, 2011 Without Or Liability To Either Party.
- Portfolio Management Division
- General Services Administration (Gsa)
- $844,525.27
- General Services Administration (Gsa)
- VA101F17F2798
- Igf::Ot::Igf Time Extension
- 28 Feb 2018
- Igf::Ot::Igf Time Extension
- Office Of Construction & Facilities Mgmt (36C10f)
- Department Of Veterans Affairs (Va)
- $52,040.00
- Department Of Veterans Affairs (Va)
- GS23F0327P
- Federal Supply Schedule Contract
- 16 Oct 2018
- Federal Supply Schedule Contract
- Gsa/Fas/Pshc/Prof Srvcs Sched-Pss
- General Services Administration (Gsa)
- $0.00
- General Services Administration (Gsa)
- GSP0917NP0012
- Executed Modification Ps07
- 16 Apr 2020
- Executed Modification Ps07
- Pbs R9 - Los Angeles Service Center
- General Services Administration (Gsa)
- $687,816.55
- General Services Administration (Gsa)
- GSP0406EX0009
- Construction Manager As-Agent Construction Phase Services
- 22 Dec 2009
- Construction Manager As-Agent Construction Phase Services
- Acquisition Division/Non-Prospectus (Section A)
- General Services Administration (Gsa)
- $3,949,416.52
- General Services Administration (Gsa)
- GSP0406EX0009
- Cm Services
- 8 Nov 2005
- Cm Services
- Acquisition Division/Non-Prospectus (Section A)
- General Services Administration (Gsa)
- $3,949,416.52
- General Services Administration (Gsa)
- GSP0406EX0009
- Cm Services
- 20 Sep 2007
- Cm Services
- Acquisition Division/Non-Prospectus (Section A)
- General Services Administration (Gsa)
- $3,949,416.52
- General Services Administration (Gsa)
- GSP0908KS0039
- Cost Estimate Of Lighting Changes And Cafeteria Relocation, Fb 300 N. Los Angeles St.
- 8 Sep 2008
- Cost Estimate Of Lighting Changes And Cafeteria Relocation, Fb 300 N. Los Angeles St.
- Facilities Management&Svcs Program Division, Contracts Section
- General Services Administration (Gsa)
- $4,133.00
- General Services Administration (Gsa)
- GS10F09LPA0021
- Construction Management Services Bpa
- 28 Sep 2009
- Construction Management Services Bpa
- Gsa/Pbs
- General Services Administration (Gsa)
- $0.00
- General Services Administration (Gsa)
- GS09P08KNC0039
- Deobligate Excess Funds For Service Rendered Fiscal Year 2010 Through December 2010 In Accordance With Terms And Conditions Of The Existing Contract.
- 2 Feb 2011
- Deobligate Excess Funds For Service Rendered Fiscal Year 2010 Through December 2010 In Accordance With Terms And Conditions Of The Existing Contract.
- Portfolio Management Division
- General Services Administration (Gsa)
- $844,525.27
- General Services Administration (Gsa)
- GSP0917NP0012
- Modification Ps06
- 16 Mar 2020
- Modification Ps06
- Pbs R9 - Los Angeles Service Center
- General Services Administration (Gsa)
- $687,816.55
- General Services Administration (Gsa)