Estes Bros. Const. Inc.
Dba Estes Bros Construction Inc
CAGE Code: 1TXC5
NCAGE Code: 1TXC5
Status: Active
Type: Commercial Supplier
Dun & Bradstreet (DUNS): 173437617
Summary
Estes Bros. Const. Inc., Dba Estes Bros Construction Inc is an Active Commercial Supplier with the Cage Code 1TXC5 and is tracked by Dun & Bradstreet under DUNS Number 173437617..
Address
126 Sugar Run Rd
Jonesville VA 24263-8491
United States
Points of Contact
No Points of Contact...
Related Information
People who viewed this 'CAGE Code' also viewed...
Champlin Net Company Russell Wright Harry J Lossin Sr Killingsworth, Roger & Associates Meyers, Dwaine Johnson, Karen T & A Logging, Inc Hines Real Estate & Auction Co Roger K. Waddell Trunzler, Joe Mike's Cycle Inc Lee County Va Fineline Tool & Engineering, Inc. Union Fabricator & Fitters Inc Lifetyme Boats, Inc. Cornerpost Software Llc Myers Home Center Inc B & B Pest Control, Inc. Pepsi-Cola Co Vaco Products Co
Frequently Asked Questions (FAQ) for CAGE 1TXC5
- What is CAGE Code 1TXC5?
- 1TXC5 is the unique identifier used by NATO Organizations to reference the physical entity known as Estes Bros. Const. Inc. Dba Estes Bros Construction Inc located at 126 Sugar Run Rd, Jonesville VA 24263-8491, United States.
- Who is CAGE Code 1TXC5?
- 1TXC5 refers to Estes Bros. Const. Inc. Dba Estes Bros Construction Inc located at 126 Sugar Run Rd, Jonesville VA 24263-8491, United States.
- Where is CAGE Code 1TXC5 Located?
- CAGE Code 1TXC5 is located in Jonesville, VA, USA.
Contracting History for CAGE 1TXC5 Most Recent 25 Records
- 140P5323C0043
- Great Smoky Mountains Np Rehab Balsam/Heintooga Wastewater: Purpose Of Modification P0001 Is To Correct Error In Engineer Plans To Reflect The Actual Lf To Pipe-Brust Waterlines.
- 13 Dec 2023
- Great Smoky Mountains Np Rehab Balsam/Heintooga Wastewater: Purpose Of Modification P0001 Is To Correct Error In Engineer Plans To Reflect The Actual Lf To Pipe-Brust Waterlines.
- Ser North Mabo (53000)
- Department Of The Interior (Doi)
- $535,668.72
- Department Of The Interior (Doi)
- 140P5323C0043
- Great Smoky Mountains Np Rehab Balsam/Heintooga Wastewater
- 16 Aug 2023
- Great Smoky Mountains Np Rehab Balsam/Heintooga Wastewater
- Ser North Mabo (53000)
- Department Of The Interior (Doi)
- $487,881.94
- Department Of The Interior (Doi)
- 140P5323C0035
- Great Smoky Mountains Np Rehab Balsam/Heintooga Water Tank Rehab System
- 11 Sep 2023
- Great Smoky Mountains Np Rehab Balsam/Heintooga Water Tank Rehab System
- Ser North Mabo (53000)
- Department Of The Interior (Doi)
- $857,304.82
- Department Of The Interior (Doi)
- 140P5323C0035
- Great Smoky Mountains Np Rehab Balsam/Heintooga Water Tank Rehab System: Purpose Of Modification P00001 Is To De-Scope Supplies Needed For Road And Add Material Erosion Control Material For Ditches.
- 13 Nov 2023
- Great Smoky Mountains Np Rehab Balsam/Heintooga Water Tank Rehab System: Purpose Of Modification P00001 Is To De-Scope Supplies Needed For Road And Add Material Erosion Control Material For Ditches.
- Ser North Mabo (53000)
- Department Of The Interior (Doi)
- $809,517.82
- Department Of The Interior (Doi)
- 693C7323C000018
- Project: Np Np Blri 1L9, 1M22, Etc - The Project Consists Of The Rehabilitation Of Approximately 24 Miles Of The Blue Ridge Parkway (Blri) Between Milepost (Mp) 97 And 121 In Bedford, Botetourt, And Roanoke Counties, Virginia. The Work Consists Of Re
- 6 Sep 2023
- Project: Np Np Blri 1L9, 1M22, Etc - The Project Consists Of The Rehabilitation Of Approximately 24 Miles Of The Blue Ridge Parkway (Blri) Between Milepost (Mp) 97 And 121 In Bedford, Botetourt, And Roanoke Counties, Virginia. The Work Consists Of Re
- 693C73 Eastern Fed Lands Division
- Department Of Transportation (Dot)
- $35,449,559.47
- Department Of Transportation (Dot)
- 693C7323F00009N
- Al Erfo Fw Bose 2020-1(1) 693C7320d000008/693C7323f00009n Cm #1 No Change To Contract Amount No Change To Contract Time Change Lines Of Accounting
- 13 Sep 2023
- Al Erfo Fw Bose 2020-1(1) 693C7320d000008/693C7323f00009n Cm #1 No Change To Contract Amount No Change To Contract Time Change Lines Of Accounting
- 693C73 Eastern Fed Lands Division
- Department Of Transportation (Dot)
- $525,421.60
- Department Of Transportation (Dot)
- 693C7323F00009N
- Al Erfo Fw Bose 2020-1(1) 693C7320d000008/693C7323f00009n Cm #2 No Change To Contract Amount No Change To Contract Time Extend Period Of Performance To December 31, 2024
- 1 Nov 2023
- Al Erfo Fw Bose 2020-1(1) 693C7320d000008/693C7323f00009n Cm #2 No Change To Contract Amount No Change To Contract Time Extend Period Of Performance To December 31, 2024
- 693C73 Eastern Fed Lands Division
- Department Of Transportation (Dot)
- $525,421.60
- Department Of Transportation (Dot)
- 693C7323C000001
- Tn Erfo Fs 2019-1(4) 693C7323c000001 Cm #2 No Change To Contract Amount No Change To Contract Time Extend Period Of Performance To May 31, 2025
- 30 Mar 2023
- Tn Erfo Fs 2019-1(4) 693C7323c000001 Cm #2 No Change To Contract Amount No Change To Contract Time Extend Period Of Performance To May 31, 2025
- 693C73 Eastern Fed Lands Division
- Department Of Transportation (Dot)
- $1,896,890.91
- Department Of Transportation (Dot)
- 693C7323C000001
- Tn Erfo Fs 2019-1(4) 693C7323c000001 Cm #3 Increase Contract Amount By $23,007.46 No Change To Contract Time Finalize Existing Quantities
- 9 Aug 2023
- Tn Erfo Fs 2019-1(4) 693C7323c000001 Cm #3 Increase Contract Amount By $23,007.46 No Change To Contract Time Finalize Existing Quantities
- 693C73 Eastern Fed Lands Division
- Department Of Transportation (Dot)
- $1,919,898.37
- Department Of Transportation (Dot)
- 693C7323C000001
- Tn Erfo Fs 2019-1(4) 693C7323c000001 Cm #1 Increase Contract Amount By $150,505.21 Increase Contract Time By 21 Calendar Days
- 2 Mar 2023
- Tn Erfo Fs 2019-1(4) 693C7323c000001 Cm #1 Increase Contract Amount By $150,505.21 Increase Contract Time By 21 Calendar Days
- 693C73 Eastern Fed Lands Division
- Department Of Transportation (Dot)
- $1,896,890.91
- Department Of Transportation (Dot)
- 693C7323C000001
- Project Tn Erfo Fs 2019-1(4): The Project Consists Of The Repair Of Various Damaged Sites On Round Knob Road (Fs-88), Greystone Spur (Fs-88A), Greene Mountain Road (Fs-98). The Work Includes Roadway Resurfacing, Construction Of Gabion Walls, Replace
- 28 Oct 2022
- Project Tn Erfo Fs 2019-1(4): The Project Consists Of The Repair Of Various Damaged Sites On Round Knob Road (Fs-88), Greystone Spur (Fs-88A), Greene Mountain Road (Fs-98). The Work Includes Roadway Resurfacing, Construction Of Gabion Walls, Replace
- 693C73 Eastern Fed Lands Division
- Department Of Transportation (Dot)
- $1,746,385.70
- Department Of Transportation (Dot)
- 693C7322F00109N
- Np-Bisc 10(2) 693C7320d000017/693C7322f00109n Cm #1 No Change To Contract Amount No Change To Contract Time Extend Period Of Performance To September 30, 2025
- 2 Aug 2023
- Np-Bisc 10(2) 693C7320d000017/693C7322f00109n Cm #1 No Change To Contract Amount No Change To Contract Time Extend Period Of Performance To September 30, 2025
- 693C73 Eastern Fed Lands Division
- Department Of Transportation (Dot)
- $3,362,508.15
- Department Of Transportation (Dot)
- 693C7322F00109N
- Np-Bisc 10(2) 693C7320d000017/693C7322f00109n Cm #2 Increase Contract Amount By $376,332.71 Extend Contract Time By 16 Calendar Days
- 7 Sep 2023
- Np-Bisc 10(2) 693C7320d000017/693C7322f00109n Cm #2 Increase Contract Amount By $376,332.71 Extend Contract Time By 16 Calendar Days
- 693C73 Eastern Fed Lands Division
- Department Of Transportation (Dot)
- $3,738,840.86
- Department Of Transportation (Dot)
- 693C7322F00109N
- Project Np-Bisc 10(2): The Project Consists Of Designing And Rehabilitation/Reconstruction Of The Roadway And Parking Areas, Pavement Marking, Development And Implementation Of A Traffic Control Plan, Installation Of Erosion And Sediment Control Mea
- 6 Sep 2022
- Project Np-Bisc 10(2): The Project Consists Of Designing And Rehabilitation/Reconstruction Of The Roadway And Parking Areas, Pavement Marking, Development And Implementation Of A Traffic Control Plan, Installation Of Erosion And Sediment Control Mea
- 693C73 Eastern Fed Lands Division
- Department Of Transportation (Dot)
- $3,362,508.15
- Department Of Transportation (Dot)
- 693C7322F00111N
- Project Nc Np Blri Br 5140-097P: Cm #1 No Change To Contract Amount No Change To Contract Time Extend Period Of Performance To September 30, 2024
- 15 Nov 2022
- Project Nc Np Blri Br 5140-097P: Cm #1 No Change To Contract Amount No Change To Contract Time Extend Period Of Performance To September 30, 2024
- 693C73 Eastern Fed Lands Division
- Department Of Transportation (Dot)
- $539,673.37
- Department Of Transportation (Dot)
- 693C7322F00111N
- Nc Np Blri Br 5140-097P 693C7320d000017/693C7322f00111n Cm #3 Increase Contract Amount By $31,549.36 No Change To Contract Time
- 10 Jul 2023
- Nc Np Blri Br 5140-097P 693C7320d000017/693C7322f00111n Cm #3 Increase Contract Amount By $31,549.36 No Change To Contract Time
- 693C73 Eastern Fed Lands Division
- Department Of Transportation (Dot)
- $565,017.83
- Department Of Transportation (Dot)
- 693C7322F00111N
- Project Nc Np Blri Br 5140-097P: The Project Consists Of Reducing Lake Water Level, Repairing Damage To The Bridge Piers, And Replacing Pre-Compressed Foam-Supported Silicone Material At Abutment Bridge Joints And Asphalt Concrete Wearing Surface
- 8 Sep 2022
- Project Nc Np Blri Br 5140-097P: The Project Consists Of Reducing Lake Water Level, Repairing Damage To The Bridge Piers, And Replacing Pre-Compressed Foam-Supported Silicone Material At Abutment Bridge Joints And Asphalt Concrete Wearing Surface
- 693C73 Eastern Fed Lands Division
- Department Of Transportation (Dot)
- $539,673.37
- Department Of Transportation (Dot)
- 693C7322F00111N
- Nc Np Blri Br 5140-097P 693C7320d000017/693C7322f00111n Cm #2 Decrease Contract Amount By $6,204.90 No Change To Contract Time
- 19 May 2023
- Nc Np Blri Br 5140-097P 693C7320d000017/693C7322f00111n Cm #2 Decrease Contract Amount By $6,204.90 No Change To Contract Time
- 693C73 Eastern Fed Lands Division
- Department Of Transportation (Dot)
- $533,468.47
- Department Of Transportation (Dot)
- 693C7322F00111N
- Nc Np Blri Br 5140-097P 693C7320d000017/693C7322f00111n Cm #4 Decrease Contract Amount By $19,663.00 No Change To Contract Time Finalize Existing Quantities
- 16 Aug 2023
- Nc Np Blri Br 5140-097P 693C7320d000017/693C7322f00111n Cm #4 Decrease Contract Amount By $19,663.00 No Change To Contract Time Finalize Existing Quantities
- 693C73 Eastern Fed Lands Division
- Department Of Transportation (Dot)
- $545,354.83
- Department Of Transportation (Dot)
- 693C7322C000006
- Np-Foot 8G16, 8H10 Cm #1 No Change To Contract Amount No Change To Contract Time Extended Period Of Performance To December 31, 2023
- 2 Mar 2022
- Np-Foot 8G16, 8H10 Cm #1 No Change To Contract Amount No Change To Contract Time Extended Period Of Performance To December 31, 2023
- 693C73 Eastern Fed Lands Division
- Department Of Transportation (Dot)
- $31,098,543.33
- Department Of Transportation (Dot)
- 693C7322C000006
- Np-Foot 8G16, 8H10 693C7322c000006 Cm #3 Decrease Contract Amount By $1.62 No Change To Contract Time
- 25 May 2023
- Np-Foot 8G16, 8H10 693C7322c000006 Cm #3 Decrease Contract Amount By $1.62 No Change To Contract Time
- 693C73 Eastern Fed Lands Division
- Department Of Transportation (Dot)
- $31,098,541.49
- Department Of Transportation (Dot)
- 693C7322C000006
- Np-Foot 8G16, 8H10 693C7322c000006 Cm #4 Decrease Contract Amount By $2,530,893.79 No Change To Contract Time Finalize Existing Quantities
- 6 Sep 2023
- Np-Foot 8G16, 8H10 693C7322c000006 Cm #4 Decrease Contract Amount By $2,530,893.79 No Change To Contract Time Finalize Existing Quantities
- 693C73 Eastern Fed Lands Division
- Department Of Transportation (Dot)
- $28,567,647.70
- Department Of Transportation (Dot)
- 693C7322C000006
- Np-Foot 8G16, 8H10 693C7322c000006 Cm #2 Decrease Contract Amount By $0.22 No Change To Contract Time
- 19 Apr 2023
- Np-Foot 8G16, 8H10 693C7322c000006 Cm #2 Decrease Contract Amount By $0.22 No Change To Contract Time
- 693C73 Eastern Fed Lands Division
- Department Of Transportation (Dot)
- $31,098,543.11
- Department Of Transportation (Dot)
- 693C7322C000006
- Project Np-Foot 8G16, 8H10: The Work Includes Full Depth Reclamation Of Foothills Parkway Sections 8G And 8H Mainline, Parking Areas, And Pull-Offs; Establishing Roadside Ditches And Reconditioning Paved Waterways; Replacing Signs And Pavement Marki
- 26 Jan 2022
- Project Np-Foot 8G16, 8H10: The Work Includes Full Depth Reclamation Of Foothills Parkway Sections 8G And 8H Mainline, Parking Areas, And Pull-Offs; Establishing Roadside Ditches And Reconditioning Paved Waterways; Replacing Signs And Pavement Marki
- 693C73 Eastern Fed Lands Division
- Department Of Transportation (Dot)
- $31,098,543.33
- Department Of Transportation (Dot)
- 693C7322F000009
- Ms Erfo Nps Vick 2020-1(1) 693C7320d000008/693C7322f000009 Cm #3 Decrease Contract Amount By $97,903.31 No Change To Contract Time Finalize Existing Quantities
- 24 Aug 2023
- Ms Erfo Nps Vick 2020-1(1) 693C7320d000008/693C7322f000009 Cm #3 Decrease Contract Amount By $97,903.31 No Change To Contract Time Finalize Existing Quantities
- 693C73 Eastern Fed Lands Division
- Department Of Transportation (Dot)
- $2,064,212.44
- Department Of Transportation (Dot)