Hensel Phelps Construction Co
CAGE Code: 1T3K0
NCAGE Code: 1T3K0
Status: Active
Type: Commercial Supplier
Dun & Bradstreet (DUNS): 054055293
Summary
Hensel Phelps Construction Co is an Active Commercial Supplier with the Cage Code 1T3K0 and is tracked by Dun & Bradstreet under DUNS Number 054055293..
Address
6557 Hazeltine National Dr Ste 1
Orlando FL 32822-5209
United States
Points of Contact
Related Information
People who viewed this 'CAGE Code' also viewed...
Veterans Edge Solutions, Llc Omnisource Events, Llc Certified Crane Services Inc Engine Power Supply Inc Affil Of Software Development Scandinavian Boiler Service, Inc. Lockheed Martin Corporation Encap Systems Corporation S H And E Inc Remedial Engineering And Science Inc Environmental Conservation Kent Electronics Asap Office Buildings Inc Striving Independence Home Care Llc Yesterdays Industries Inc United States Crane Certification Sunshine Coast Group Llc Global Technology Associates Inc. Laquita D. Clay Stellar Lighting Systems Llc
Frequently Asked Questions (FAQ) for CAGE 1T3K0
- What is CAGE Code 1T3K0?
- 1T3K0 is the unique identifier used by NATO Organizations to reference the physical entity known as Hensel Phelps Construction Co located at 6557 Hazeltine National Dr Ste 1, Orlando FL 32822-5209, United States.
- Who is CAGE Code 1T3K0?
- 1T3K0 refers to Hensel Phelps Construction Co located at 6557 Hazeltine National Dr Ste 1, Orlando FL 32822-5209, United States.
- Where is CAGE Code 1T3K0 Located?
- CAGE Code 1T3K0 is located in Orlando, FL, USA.
Contracting History for CAGE 1T3K0 Most Recent 25 Records
- W9127823C0029
- Propulsion Systems Lab Redstone Arsenal, Alabama (Madison County)
- 29 Sep 2023
- Propulsion Systems Lab Redstone Arsenal, Alabama (Madison County)
- Us Army Engineer District Mobile
- Department Of Defense (Dod)
- $52,772,000.00
- Department Of Defense (Dod)
- W9127822C0024
- Fc002 Add Fiber Optic Cable
- 15 Aug 2023
- Fc002 Add Fiber Optic Cable
- Us Army Engineer District Mobile
- Department Of Defense (Dod)
- $78,142,340.00
- Department Of Defense (Dod)
- W9127822C0024
- Fc014 Delete Raised Access Flooring In Rm #210
- 22 Aug 2023
- Fc014 Delete Raised Access Flooring In Rm #210
- Us Army Engineer District Mobile
- Department Of Defense (Dod)
- $78,142,340.00
- Department Of Defense (Dod)
- W9127822C0024
- Fc008 First Floor Transom Window Deletion
- 31 May 2023
- Fc008 First Floor Transom Window Deletion
- Us Army Engineer District Mobile
- Department Of Defense (Dod)
- $77,788,411.00
- Department Of Defense (Dod)
- W9127822C0024
- Ntp D/B Ico Hq, Ccsfs, Fl
- 7 Sep 2022
- Ntp D/B Ico Hq, Ccsfs, Fl
- Us Army Engineer District Mobile
- Department Of Defense (Dod)
- $76,237,000.00
- Department Of Defense (Dod)
- W9127822C0024
- Fc024-2 Ff&E Design Revisions
- 30 Aug 2023
- Fc024-2 Ff&E Design Revisions
- Us Army Engineer District Mobile
- Department Of Defense (Dod)
- $78,142,948.00
- Department Of Defense (Dod)
- W9127822C0024
- Mod A00005 Fc015 Rea - Rf Shielding Design Cancellation
- 18 Jul 2023
- Mod A00005 Fc015 Rea - Rf Shielding Design Cancellation
- Us Army Engineer District Mobile
- Department Of Defense (Dod)
- $78,129,469.00
- Department Of Defense (Dod)
- W9127822C0024
- Contract For Design-Build Integrated Capabilities Office (Ico) Hq At Cape Canaveral Sfs, Fl. Reference No. P00004 Fc006 Change Site Generator To Tier #2 See Page 2.
- 14 Aug 2023
- Contract For Design-Build Integrated Capabilities Office (Ico) Hq At Cape Canaveral Sfs, Fl. Reference No. P00004 Fc006 Change Site Generator To Tier #2 See Page 2.
- Us Army Engineer District Mobile
- Department Of Defense (Dod)
- $78,142,340.00
- Department Of Defense (Dod)
- W9127822C0024
- The Purpose Of This Modification Is To Exercise Bid Option 3 (Clin 0006). All Other Terms And Conditions Remain Unchanged.
- 9 Jun 2023
- The Purpose Of This Modification Is To Exercise Bid Option 3 (Clin 0006). All Other Terms And Conditions Remain Unchanged.
- Us Army Engineer District Mobile
- Department Of Defense (Dod)
- $77,788,411.00
- Department Of Defense (Dod)
- W9127822C0024
- Integrated Capabilities Office (Ico) Headquarters
- 29 Jul 2022
- Integrated Capabilities Office (Ico) Headquarters
- Us Army Engineer District Mobile
- Department Of Defense (Dod)
- $76,237,000.00
- Department Of Defense (Dod)
- W9127822C0024
- Fc027 Additional Equipment
- 27 Sep 2023
- Fc027 Additional Equipment
- Us Army Engineer District Mobile
- Department Of Defense (Dod)
- $78,428,127.00
- Department Of Defense (Dod)
- W9127822C0024
- Fc004 Add Construction Security Plan (Csp)
- 19 Jul 2023
- Fc004 Add Construction Security Plan (Csp)
- Us Army Engineer District Mobile
- Department Of Defense (Dod)
- $78,129,469.00
- Department Of Defense (Dod)
- W9127822C0024
- Fc030 Ff&E Design Change Bid Option 1 - Cup
- 22 Sep 2023
- Fc030 Ff&E Design Change Bid Option 1 - Cup
- Us Army Engineer District Mobile
- Department Of Defense (Dod)
- $78,428,127.00
- Department Of Defense (Dod)
- W9127822C0024
- Base Bid
- 22 Jun 2023
- Base Bid
- Us Army Engineer District Mobile
- Department Of Defense (Dod)
- $77,761,471.00
- Department Of Defense (Dod)
- W9127822C0024
- Fc010-Building 35420 Utility Pole Replacement Fc011- Ess Manufacturer Change
- 24 May 2023
- Fc010-Building 35420 Utility Pole Replacement Fc011- Ess Manufacturer Change
- Us Army Engineer District Mobile
- Department Of Defense (Dod)
- $77,822,062.00
- Department Of Defense (Dod)
- W9127822C0024
- Fc009 Reduce Spare Conduits Comm Duct Bank
- 23 Jun 2023
- Fc009 Reduce Spare Conduits Comm Duct Bank
- Us Army Engineer District Mobile
- Department Of Defense (Dod)
- $77,788,411.00
- Department Of Defense (Dod)
- W9127822C0024
- Fc024-1 Ff&E Design Revisions
- 12 Jul 2023
- Fc024-1 Ff&E Design Revisions
- Us Army Engineer District Mobile
- Department Of Defense (Dod)
- $78,129,469.00
- Department Of Defense (Dod)
- W9127822C0024
- Fc025-1 Increase Size Of Lift Station
- 25 Jul 2023
- Fc025-1 Increase Size Of Lift Station
- Us Army Engineer District Mobile
- Department Of Defense (Dod)
- $78,129,469.00
- Department Of Defense (Dod)
- W9127822C0024
- Fc031 Ff&E Design Changes Bid Option 3 - Base
- 21 Sep 2023
- Fc031 Ff&E Design Changes Bid Option 3 - Base
- Us Army Engineer District Mobile
- Department Of Defense (Dod)
- $78,428,127.00
- Department Of Defense (Dod)
- W9127822C0024
- Fc013 Vecp Electrical Switchgear Arrangement
- 24 Aug 2023
- Fc013 Vecp Electrical Switchgear Arrangement
- Us Army Engineer District Mobile
- Department Of Defense (Dod)
- $78,142,340.00
- Department Of Defense (Dod)
- W912HN22F3001
- Tr007 Stainless Steel Toilet Hinges
- 29 Aug 2023
- Tr007 Stainless Steel Toilet Hinges
- Us Army Engineer District Mobile
- Department Of Defense (Dod)
- $133,756,153.00
- Department Of Defense (Dod)
- W912HN22F3001
- Base-Construction Of Dorm 2 Add Funds For Ffe Omission At Contract Award.
- 27 Sep 2023
- Base-Construction Of Dorm 2 Add Funds For Ffe Omission At Contract Award.
- Us Army Engineer District Mobile
- Department Of Defense (Dod)
- $133,823,353.00
- Department Of Defense (Dod)
- W912HN22F3001
- Tr003 Asbestos Removal
- 8 Mar 2023
- Tr003 Asbestos Removal
- Us Army Engineer District Mobile
- Department Of Defense (Dod)
- $132,088,228.00
- Department Of Defense (Dod)
- W912HN22F3001
- Base-Construction Of Dorm 2
- 28 Sep 2023
- Base-Construction Of Dorm 2
- Us Army Engineer District Mobile
- Department Of Defense (Dod)
- $133,823,353.00
- Department Of Defense (Dod)
- W912HN22F3001
- Base-Construction Of Dorm 1 Ntp
- 21 Dec 2021
- Base-Construction Of Dorm 1 Ntp
- Us Army Engineer District Mobile
- Department Of Defense (Dod)
- $129,253,000.00
- Department Of Defense (Dod)