Gray Hawk Technology Solutions Llc
CAGE Code: 1RU60
NCAGE Code: 1RU60
Status: Active
Type: Commercial Supplier
Dun & Bradstreet (DUNS): 884170817
Summary
Gray Hawk Technology Solutions Llc is an Active Commercial Supplier with the Cage Code 1RU60 and is tracked by Dun & Bradstreet under DUNS Number 884170817..
Address
7799 Leesburg Pike Ste 700 S
Falls Church VA 22043-2408
United States
Points of Contact
Related Information
People who viewed this 'CAGE Code' also viewed...
Manqi Environmental Group Inc The Dyncorp Don Wellen & Associates Intelligent Solutions Inc Financial Dynamics State Chemical Mfg Co Accelio Corp Deep Eyes Llc Liebenow & Torok, Inc. Jankovic & Associates Cycles, Inc. Junk Maven Llc Datatrac Information Services, Inc. Mantech Gray Hawk Systems, Inc. Dyntel Corporation I T Direct Inc M. Raina Associates, Inc. Haynes And Associates Inc Ast Engineering Services, Inc Energy And Environmental
Frequently Asked Questions (FAQ) for CAGE 1RU60
- What is CAGE Code 1RU60?
- 1RU60 is the unique identifier used by NATO Organizations to reference the physical entity known as Gray Hawk Technology Solutions Llc located at 7799 Leesburg Pike Ste 700 S, Falls Church VA 22043-2408, United States.
- Who is CAGE Code 1RU60?
- 1RU60 refers to Gray Hawk Technology Solutions Llc located at 7799 Leesburg Pike Ste 700 S, Falls Church VA 22043-2408, United States.
- Where is CAGE Code 1RU60 Located?
- CAGE Code 1RU60 is located in Falls Church, VA, USA.
Contracting History for CAGE 1RU60 Most Recent 25 Records
- GST1004EC346A
- This Is A Time And Materials Task Order Awarded Against Bpa #Gs10t05eca4508. Task Order Id: A4s15b0346a Funding Document A4i406020 Applies To This Task Order. In Addition To The Clauses In The Fss Schedule, The Following Clauses Apply To This Task Order: 1. Far 52.204-2, Security Requirements (Aug 1996) 2. Far 52.217-8, Option To Extend Services (Nov 1999) 3. Far 52.217-9, Option To Extend The Term Of A Contract (Mar 2000) 4. Far 52.227-14, Rights In Data - General (Jun 1987) 5. Far 52.232-7, Payments Under Time-And-Materials And Labor-Hour Contracts (Dec 2002) 6. Far 52.232-19, Availability Of Funds For The Next Fiscal Year (Apr 1984) 7. Subcontracting With Firms That Are Owned Or Controlled By The Government Of A Terrorist Country (See Full Text In The Bom/Sow In Itss) 8. Organizational Conflict Of Interest (See Full Text In The Bom/Sow In Itss) 9. Rights In Noncommercial Computer Software And Noncommercial Computer Software Documentation (See Full Text In The Bom/Sow In Itss) Iaw Far 52.232-7, The Government Will Withhold 5% Of The Amount Of Each Invoice Under The Labor Clin, Up To A Maximum Of $50,000. Once The Withhold Balance Equals $50,000, No Additional Dollars Will Be Withheld Under This Task Order. Upon Contractor Submission Of, And Government Acceptance Of The Final Invoice, The Contractor Will Be Paid The Withhold Balance. Contractor Is Not Authorized To Bill For Any Labor Categories Not Listed In Page 2 Of This Task Order Without Written Approval Of The Contracting Officer. Application Of General & Administrative Or Other Indirect Costs To Any Direct Costs Is Not Allowed. Note: Performance Under This Task Order Ends On 14 Oct 2005. No Payment For Services Beyond That Date Will Be Made Unless Authorized By Written Modification To This Order. If The Funding Is Not Sufficient For Performance To Go Through 14 Oct 2005, Performance Must Stop. No Payments Will Be Made For Work Accomplished Beyond The Funded Amount Without Being Authorized By Written Modification To This Order. Item No. (A) Supplies Or Services (B) Quantity Ordered (C) Unit (D) Unit Price (E) Amount (F) The Contractor Shall Provide Overall Seta And Technical Operations Support To Include Advanced Programmatics, Systems Engineering, Concept Analysis, System Reengineering Requirements And Execute At A High Level Of Detailed Specification Preparation, Configuration Management. See Page 2 For A Detailed List Of Clins (Located In The Bom/Sow In Itss) Ceiling Amount Is $7,965,032.00
- 15 Aug 2005
- This Is A Time And Materials Task Order Awarded Against Bpa #Gs10t05eca4508. Task Order Id: A4s15b0346a Funding Document A4i406020 Applies To This Task Order. In Addition To The Clauses In The Fss Schedule, The Following Clauses Apply To This Task Order: 1. Far 52.204-2, Security Requirements (Aug 1996) 2. Far 52.217-8, Option To Extend Services (Nov 1999) 3. Far 52.217-9, Option To Extend The Term Of A Contract (Mar 2000) 4. Far 52.227-14, Rights In Data - General (Jun 1987) 5. Far 52.232-7, Payments Under Time-And-Materials And Labor-Hour Contracts (Dec 2002) 6. Far 52.232-19, Availability Of Funds For The Next Fiscal Year (Apr 1984) 7. Subcontracting With Firms That Are Owned Or Controlled By The Government Of A Terrorist Country (See Full Text In The Bom/Sow In Itss) 8. Organizational Conflict Of Interest (See Full Text In The Bom/Sow In Itss) 9. Rights In Noncommercial Computer Software And Noncommercial Computer Software Documentation (See Full Text In The Bom/Sow In Itss) Iaw Far 52.232-7, The Government Will Withhold 5% Of The Amount Of Each Invoice Under The Labor Clin, Up To A Maximum Of $50,000. Once The Withhold Balance Equals $50,000, No Additional Dollars Will Be Withheld Under This Task Order. Upon Contractor Submission Of, And Government Acceptance Of The Final Invoice, The Contractor Will Be Paid The Withhold Balance. Contractor Is Not Authorized To Bill For Any Labor Categories Not Listed In Page 2 Of This Task Order Without Written Approval Of The Contracting Officer. Application Of General & Administrative Or Other Indirect Costs To Any Direct Costs Is Not Allowed. Note: Performance Under This Task Order Ends On 14 Oct 2005. No Payment For Services Beyond That Date Will Be Made Unless Authorized By Written Modification To This Order. If The Funding Is Not Sufficient For Performance To Go Through 14 Oct 2005, Performance Must Stop. No Payments Will Be Made For Work Accomplished Beyond The Funded Amount Without Being Authorized By Written Modification To This Order. Item No. (A) Supplies Or Services (B) Quantity Ordered (C) Unit (D) Unit Price (E) Amount (F) The Contractor Shall Provide Overall Seta And Technical Operations Support To Include Advanced Programmatics, Systems Engineering, Concept Analysis, System Reengineering Requirements And Execute At A High Level Of Detailed Specification Preparation, Configuration Management. See Page 2 For A Detailed List Of Clins (Located In The Bom/Sow In Itss) Ceiling Amount Is $7,965,032.00
- Gsa/Fts Contracting Staff
- General Services Administration (Gsa)
- $25,560,440.41
- General Services Administration (Gsa)
- GST1004EC347A
- This Is A Time And Materials Task Order Awarded Against Bpa #Gs10t05eca4508. Task Order Id: A4s15b0347a Funding Document A4i406293 Applies To This Task Order. In Addition To The Clauses In The Fss Schedule, The Following Clauses Apply To This Task Order: 1. Far 52.204-2, Security Requirements (Aug 1996) 2. Far 52.217-8, Option To Extend Services (Nov 1999) 3. Far 52.217-9, Option To Extend The Term Of A Contract (Mar 2000) 4. Far 52.227-14, Rights In Data - General (Jun 1987) 5. Far 52.232-7, Payments Under Time-And-Materials And Labor-Hour Contracts (Dec 2002) 6. Far 52.232-19, Availability Of Funds For The Next Fiscal Year (Apr 1984) 7. Far 52.232-22, Limitation Of Funds (Apr 1984) 8. Subcontracting With Firms That Are Owned Or Controlled By The Government Of A Terrorist Country (See Full Text In The Bom/Sow In Itss) 9. Organizational Conflict Of Interest (See Full Text In The Bom/Sow In Itss) 10. Rights In Noncommercial Computer Software And Noncommercial Computer Software Documentation (See Full Text In The Bom/Sow In Itss) Iaw Far 52.232-7, The Government Will Withhold 5% Of The Amount Of Each Invoice Under The Labor Clin, Up To A Maximum Of $50,000. Once The Withhold Balance Equals $50,000, No Additional Dollars Will Be Withheld Under This Task Order. Upon Contractor Submission Of, And Government Acceptance Of The Final Invoice, The Contractor Will Be Paid The Withhold Balance. Contractor Is Not Authorized To Bill For Any Labor Categories Not Listed In Page 2 Of This Task Order Without Written Approval Of The Contracting Officer. Application Of General & Administrative Or Other Indirect Costs To Any Direct Costs Is Not Allowed. Note: This Task Order Is Incrementally Funded Per Far 52.232-22 Limitation Of Funds (Apr 1984). Performance Under This Task Order Ends On 14 Oct 2005. No Payment For Services Beyond That Date Will Be Made Unless Authorized By Written Modification To This Order. If The Funding Is Not Sufficient For Performance To Go Through 14 Oct 2005, Performance Must Stop. No Payments Will Be Made For Work Accomplished Beyond The Funded Amount Without Being Authorized By Written Modification To This Order. Item No. (A) Supplies Or Services (B) Quantity Ordered (C) Unit (D) Unit Price (E) Amount (F) Provide Advanced Data Visualization, Dissemination And Integration Solutions Support To The Ftttf (Dvd). See Page 2 For A Detailed List Of Clins (Located In The Bom/Sow In Itss) Ceiling Amount Is $3,296,404.80
- 27 Mar 2006
- This Is A Time And Materials Task Order Awarded Against Bpa #Gs10t05eca4508. Task Order Id: A4s15b0347a Funding Document A4i406293 Applies To This Task Order. In Addition To The Clauses In The Fss Schedule, The Following Clauses Apply To This Task Order: 1. Far 52.204-2, Security Requirements (Aug 1996) 2. Far 52.217-8, Option To Extend Services (Nov 1999) 3. Far 52.217-9, Option To Extend The Term Of A Contract (Mar 2000) 4. Far 52.227-14, Rights In Data - General (Jun 1987) 5. Far 52.232-7, Payments Under Time-And-Materials And Labor-Hour Contracts (Dec 2002) 6. Far 52.232-19, Availability Of Funds For The Next Fiscal Year (Apr 1984) 7. Far 52.232-22, Limitation Of Funds (Apr 1984) 8. Subcontracting With Firms That Are Owned Or Controlled By The Government Of A Terrorist Country (See Full Text In The Bom/Sow In Itss) 9. Organizational Conflict Of Interest (See Full Text In The Bom/Sow In Itss) 10. Rights In Noncommercial Computer Software And Noncommercial Computer Software Documentation (See Full Text In The Bom/Sow In Itss) Iaw Far 52.232-7, The Government Will Withhold 5% Of The Amount Of Each Invoice Under The Labor Clin, Up To A Maximum Of $50,000. Once The Withhold Balance Equals $50,000, No Additional Dollars Will Be Withheld Under This Task Order. Upon Contractor Submission Of, And Government Acceptance Of The Final Invoice, The Contractor Will Be Paid The Withhold Balance. Contractor Is Not Authorized To Bill For Any Labor Categories Not Listed In Page 2 Of This Task Order Without Written Approval Of The Contracting Officer. Application Of General & Administrative Or Other Indirect Costs To Any Direct Costs Is Not Allowed. Note: This Task Order Is Incrementally Funded Per Far 52.232-22 Limitation Of Funds (Apr 1984). Performance Under This Task Order Ends On 14 Oct 2005. No Payment For Services Beyond That Date Will Be Made Unless Authorized By Written Modification To This Order. If The Funding Is Not Sufficient For Performance To Go Through 14 Oct 2005, Performance Must Stop. No Payments Will Be Made For Work Accomplished Beyond The Funded Amount Without Being Authorized By Written Modification To This Order. Item No. (A) Supplies Or Services (B) Quantity Ordered (C) Unit (D) Unit Price (E) Amount (F) Provide Advanced Data Visualization, Dissemination And Integration Solutions Support To The Ftttf (Dvd). See Page 2 For A Detailed List Of Clins (Located In The Bom/Sow In Itss) Ceiling Amount Is $3,296,404.80
- Gsa/Fts Contracting Staff
- General Services Administration (Gsa)
- $12,194,761.44
- General Services Administration (Gsa)
- GST1004EC347A
- This Is A Time And Materials Task Order Awarded Against Bpa #Gs10t05eca4508. Task Order Id: A4s15b0347a Funding Document A4i406293 Applies To This Task Order. In Addition To The Clauses In The Fss Schedule, The Following Clauses Apply To This Task Order: 1. Far 52.204-2, Security Requirements (Aug 1996) 2. Far 52.217-8, Option To Extend Services (Nov 1999) 3. Far 52.217-9, Option To Extend The Term Of A Contract (Mar 2000) 4. Far 52.227-14, Rights In Data - General (Jun 1987) 5. Far 52.232-7, Payments Under Time-And-Materials And Labor-Hour Contracts (Dec 2002) 6. Far 52.232-19, Availability Of Funds For The Next Fiscal Year (Apr 1984) 7. Far 52.232-22, Limitation Of Funds (Apr 1984) 8. Subcontracting With Firms That Are Owned Or Controlled By The Government Of A Terrorist Country (See Full Text In The Bom/Sow In Itss) 9. Organizational Conflict Of Interest (See Full Text In The Bom/Sow In Itss) 10. Rights In Noncommercial Computer Software And Noncommercial Computer Software Documentation (See Full Text In The Bom/Sow In Itss) Iaw Far 52.232-7, The Government Will Withhold 5% Of The Amount Of Each Invoice Under The Labor Clin, Up To A Maximum Of $50,000. Once The Withhold Balance Equals $50,000, No Additional Dollars Will Be Withheld Under This Task Order. Upon Contractor Submission Of, And Government Acceptance Of The Final Invoice, The Contractor Will Be Paid The Withhold Balance. Contractor Is Not Authorized To Bill For Any Labor Categories Not Listed In Page 2 Of This Task Order Without Written Approval Of The Contracting Officer. Application Of General & Administrative Or Other Indirect Costs To Any Direct Costs Is Not Allowed. Note: This Task Order Is Incrementally Funded Per Far 52.232-22 Limitation Of Funds (Apr 1984). Performance Under This Task Order Ends On 14 Oct 2005. No Payment For Services Beyond That Date Will Be Made Unless Authorized By Written Modification To This Order. If The Funding Is Not Sufficient For Performance To Go Through 14 Oct 2005, Performance Must Stop. No Payments Will Be Made For Work Accomplished Beyond The Funded Amount Without Being Authorized By Written Modification To This Order. Item No. (A) Supplies Or Services (B) Quantity Ordered (C) Unit (D) Unit Price (E) Amount (F) Provide Advanced Data Visualization, Dissemination And Integration Solutions Support To The Ftttf (Dvd). See Page 2 For A Detailed List Of Clins (Located In The Bom/Sow In Itss) Ceiling Amount Is $3,296,404.80
- 15 Mar 2005
- This Is A Time And Materials Task Order Awarded Against Bpa #Gs10t05eca4508. Task Order Id: A4s15b0347a Funding Document A4i406293 Applies To This Task Order. In Addition To The Clauses In The Fss Schedule, The Following Clauses Apply To This Task Order: 1. Far 52.204-2, Security Requirements (Aug 1996) 2. Far 52.217-8, Option To Extend Services (Nov 1999) 3. Far 52.217-9, Option To Extend The Term Of A Contract (Mar 2000) 4. Far 52.227-14, Rights In Data - General (Jun 1987) 5. Far 52.232-7, Payments Under Time-And-Materials And Labor-Hour Contracts (Dec 2002) 6. Far 52.232-19, Availability Of Funds For The Next Fiscal Year (Apr 1984) 7. Far 52.232-22, Limitation Of Funds (Apr 1984) 8. Subcontracting With Firms That Are Owned Or Controlled By The Government Of A Terrorist Country (See Full Text In The Bom/Sow In Itss) 9. Organizational Conflict Of Interest (See Full Text In The Bom/Sow In Itss) 10. Rights In Noncommercial Computer Software And Noncommercial Computer Software Documentation (See Full Text In The Bom/Sow In Itss) Iaw Far 52.232-7, The Government Will Withhold 5% Of The Amount Of Each Invoice Under The Labor Clin, Up To A Maximum Of $50,000. Once The Withhold Balance Equals $50,000, No Additional Dollars Will Be Withheld Under This Task Order. Upon Contractor Submission Of, And Government Acceptance Of The Final Invoice, The Contractor Will Be Paid The Withhold Balance. Contractor Is Not Authorized To Bill For Any Labor Categories Not Listed In Page 2 Of This Task Order Without Written Approval Of The Contracting Officer. Application Of General & Administrative Or Other Indirect Costs To Any Direct Costs Is Not Allowed. Note: This Task Order Is Incrementally Funded Per Far 52.232-22 Limitation Of Funds (Apr 1984). Performance Under This Task Order Ends On 14 Oct 2005. No Payment For Services Beyond That Date Will Be Made Unless Authorized By Written Modification To This Order. If The Funding Is Not Sufficient For Performance To Go Through 14 Oct 2005, Performance Must Stop. No Payments Will Be Made For Work Accomplished Beyond The Funded Amount Without Being Authorized By Written Modification To This Order. Item No. (A) Supplies Or Services (B) Quantity Ordered (C) Unit (D) Unit Price (E) Amount (F) Provide Advanced Data Visualization, Dissemination And Integration Solutions Support To The Ftttf (Dvd). See Page 2 For A Detailed List Of Clins (Located In The Bom/Sow In Itss) Ceiling Amount Is $3,296,404.80
- Gsa/Fts Contracting Staff
- General Services Administration (Gsa)
- $12,194,761.44
- General Services Administration (Gsa)
- GST1004EC347A
- This Is A Time And Materials Task Order Awarded Against Bpa #Gs10t05eca4508. Task Order Id: A4s15b0347a Funding Document A4i406293 Applies To This Task Order. In Addition To The Clauses In The Fss Schedule, The Following Clauses Apply To This Task Order: 1. Far 52.204-2, Security Requirements (Aug 1996) 2. Far 52.217-8, Option To Extend Services (Nov 1999) 3. Far 52.217-9, Option To Extend The Term Of A Contract (Mar 2000) 4. Far 52.227-14, Rights In Data - General (Jun 1987) 5. Far 52.232-7, Payments Under Time-And-Materials And Labor-Hour Contracts (Dec 2002) 6. Far 52.232-19, Availability Of Funds For The Next Fiscal Year (Apr 1984) 7. Far 52.232-22, Limitation Of Funds (Apr 1984) 8. Subcontracting With Firms That Are Owned Or Controlled By The Government Of A Terrorist Country (See Full Text In The Bom/Sow In Itss) 9. Organizational Conflict Of Interest (See Full Text In The Bom/Sow In Itss) 10. Rights In Noncommercial Computer Software And Noncommercial Computer Software Documentation (See Full Text In The Bom/Sow In Itss) Iaw Far 52.232-7, The Government Will Withhold 5% Of The Amount Of Each Invoice Under The Labor Clin, Up To A Maximum Of $50,000. Once The Withhold Balance Equals $50,000, No Additional Dollars Will Be Withheld Under This Task Order. Upon Contractor Submission Of, And Government Acceptance Of The Final Invoice, The Contractor Will Be Paid The Withhold Balance. Contractor Is Not Authorized To Bill For Any Labor Categories Not Listed In Page 2 Of This Task Order Without Written Approval Of The Contracting Officer. Application Of General & Administrative Or Other Indirect Costs To Any Direct Costs Is Not Allowed. Note: This Task Order Is Incrementally Funded Per Far 52.232-22 Limitation Of Funds (Apr 1984). Performance Under This Task Order Ends On 14 Oct 2005. No Payment For Services Beyond That Date Will Be Made Unless Authorized By Written Modification To This Order. If The Funding Is Not Sufficient For Performance To Go Through 14 Oct 2005, Performance Must Stop. No Payments Will Be Made For Work Accomplished Beyond The Funded Amount Without Being Authorized By Written Modification To This Order. Item No. (A) Supplies Or Services (B) Quantity Ordered (C) Unit (D) Unit Price (E) Amount (F) Provide Advanced Data Visualization, Dissemination And Integration Solutions Support To The Ftttf (Dvd). See Page 2 For A Detailed List Of Clins (Located In The Bom/Sow In Itss) Ceiling Amount Is $3,296,404.80
- 14 Oct 2005
- This Is A Time And Materials Task Order Awarded Against Bpa #Gs10t05eca4508. Task Order Id: A4s15b0347a Funding Document A4i406293 Applies To This Task Order. In Addition To The Clauses In The Fss Schedule, The Following Clauses Apply To This Task Order: 1. Far 52.204-2, Security Requirements (Aug 1996) 2. Far 52.217-8, Option To Extend Services (Nov 1999) 3. Far 52.217-9, Option To Extend The Term Of A Contract (Mar 2000) 4. Far 52.227-14, Rights In Data - General (Jun 1987) 5. Far 52.232-7, Payments Under Time-And-Materials And Labor-Hour Contracts (Dec 2002) 6. Far 52.232-19, Availability Of Funds For The Next Fiscal Year (Apr 1984) 7. Far 52.232-22, Limitation Of Funds (Apr 1984) 8. Subcontracting With Firms That Are Owned Or Controlled By The Government Of A Terrorist Country (See Full Text In The Bom/Sow In Itss) 9. Organizational Conflict Of Interest (See Full Text In The Bom/Sow In Itss) 10. Rights In Noncommercial Computer Software And Noncommercial Computer Software Documentation (See Full Text In The Bom/Sow In Itss) Iaw Far 52.232-7, The Government Will Withhold 5% Of The Amount Of Each Invoice Under The Labor Clin, Up To A Maximum Of $50,000. Once The Withhold Balance Equals $50,000, No Additional Dollars Will Be Withheld Under This Task Order. Upon Contractor Submission Of, And Government Acceptance Of The Final Invoice, The Contractor Will Be Paid The Withhold Balance. Contractor Is Not Authorized To Bill For Any Labor Categories Not Listed In Page 2 Of This Task Order Without Written Approval Of The Contracting Officer. Application Of General & Administrative Or Other Indirect Costs To Any Direct Costs Is Not Allowed. Note: This Task Order Is Incrementally Funded Per Far 52.232-22 Limitation Of Funds (Apr 1984). Performance Under This Task Order Ends On 14 Oct 2005. No Payment For Services Beyond That Date Will Be Made Unless Authorized By Written Modification To This Order. If The Funding Is Not Sufficient For Performance To Go Through 14 Oct 2005, Performance Must Stop. No Payments Will Be Made For Work Accomplished Beyond The Funded Amount Without Being Authorized By Written Modification To This Order. Item No. (A) Supplies Or Services (B) Quantity Ordered (C) Unit (D) Unit Price (E) Amount (F) Provide Advanced Data Visualization, Dissemination And Integration Solutions Support To The Ftttf (Dvd). See Page 2 For A Detailed List Of Clins (Located In The Bom/Sow In Itss) Ceiling Amount Is $3,296,404.80
- Gsa/Fts Contracting Staff
- General Services Administration (Gsa)
- $12,194,761.44
- General Services Administration (Gsa)
- GST1004EC348A
- This Is A Time And Materials Task Order Awarded Against Bpa #Gs10t05eca4508. Task Order Id: A4s15b0348a Funding Document A4i406009 Applies To This Task Order. In Addition To The Clauses In The Fss Schedule, The Following Clauses Apply To This Task Order: 1. Far 52.204-2, Security Requirements (Aug 1996) 2. Far 52.217-8, Option To Extend Services (Nov 1999) 3. Far 52.217-9, Option To Extend The Term Of A Contract (Mar 2000) 4. Far 52.227-14, Rights In Data - General (Jun 1987) 5. Far 52.232-7, Payments Under Time-And-Materials And Labor-Hour Contracts 6. Far 52.232-19, Availability Of Funds For The Next Fiscal Year (Apr 1984) 7. Far 52.232-22, Limitation Of Funds (Apr 1984) 8. Subcontracting With Firms That Are Owned Or Controlled By The Government Of A Terrorist Country (See Full Text In The Bom/Sow In Itss) 9. Organizational Conflict Of Interest (See Full Text In The Bom/Sow In Itss) 10. Rights In Noncommercial Computer Software And Noncommercial Computer Software Documentation (See Full Text In The Bom/Sow In Itss) Iaw Far 52.232-7, The Government Will Withhold 5% Of The Amount Of Each Invoice Under The Labor Clin, Up To A Maximum Of $50,000. Once The Withhold Balance Equals $50,000, No Additional Dollars Will Be Withheld Under This Task Order. Upon Contractor Submission Of, And Government Acceptance Of The Final Invoice, The Contractor Will Be Paid The Withhold Balance. Contractor Is Not Authorized To Bill For Any Labor Categories Not Listed In Page 2 Of This Task Order Without Written Approval Of The Contracting Officer. Application Of General & Administrative Or Other Indirect Costs To Any Direct Costs Is Not Allowed. Note: This Task Order Is Incrementally Funded Per Far 52.232-22 Limitation Of Funds (Apr 1984). Performance Under This Task Order Ends On 14 Oct 2005. No Payment For Services Beyond That Date Will Be Made Unless Authorized By Written Modification To This Order. If The Funding Is Not Sufficient For Performance To Go Through 14 Oct 2005, Performance Must Stop. No Payments Will Be Made For Work Accomplished Beyond The Funded Amount Without Being Authorized By Written Modification To This Order. Item No. (A) Supplies Or Services (B) Quantity Ordered (C) Unit (D) Unit Price (E) Amount (F) The Contractor Shall Provide Support To Define And Develop User Requirements, Provide Quick Reaction Support And Integrated Analytical And Operational Support To The Ftttf (Iaos) See Page 2 For A Detailed List Of Clins (Located In The Bom/Sow In Itss) Ceiling Amount Is $4,556,843.20
- 28 Nov 2005
- This Is A Time And Materials Task Order Awarded Against Bpa #Gs10t05eca4508. Task Order Id: A4s15b0348a Funding Document A4i406009 Applies To This Task Order. In Addition To The Clauses In The Fss Schedule, The Following Clauses Apply To This Task Order: 1. Far 52.204-2, Security Requirements (Aug 1996) 2. Far 52.217-8, Option To Extend Services (Nov 1999) 3. Far 52.217-9, Option To Extend The Term Of A Contract (Mar 2000) 4. Far 52.227-14, Rights In Data - General (Jun 1987) 5. Far 52.232-7, Payments Under Time-And-Materials And Labor-Hour Contracts 6. Far 52.232-19, Availability Of Funds For The Next Fiscal Year (Apr 1984) 7. Far 52.232-22, Limitation Of Funds (Apr 1984) 8. Subcontracting With Firms That Are Owned Or Controlled By The Government Of A Terrorist Country (See Full Text In The Bom/Sow In Itss) 9. Organizational Conflict Of Interest (See Full Text In The Bom/Sow In Itss) 10. Rights In Noncommercial Computer Software And Noncommercial Computer Software Documentation (See Full Text In The Bom/Sow In Itss) Iaw Far 52.232-7, The Government Will Withhold 5% Of The Amount Of Each Invoice Under The Labor Clin, Up To A Maximum Of $50,000. Once The Withhold Balance Equals $50,000, No Additional Dollars Will Be Withheld Under This Task Order. Upon Contractor Submission Of, And Government Acceptance Of The Final Invoice, The Contractor Will Be Paid The Withhold Balance. Contractor Is Not Authorized To Bill For Any Labor Categories Not Listed In Page 2 Of This Task Order Without Written Approval Of The Contracting Officer. Application Of General & Administrative Or Other Indirect Costs To Any Direct Costs Is Not Allowed. Note: This Task Order Is Incrementally Funded Per Far 52.232-22 Limitation Of Funds (Apr 1984). Performance Under This Task Order Ends On 14 Oct 2005. No Payment For Services Beyond That Date Will Be Made Unless Authorized By Written Modification To This Order. If The Funding Is Not Sufficient For Performance To Go Through 14 Oct 2005, Performance Must Stop. No Payments Will Be Made For Work Accomplished Beyond The Funded Amount Without Being Authorized By Written Modification To This Order. Item No. (A) Supplies Or Services (B) Quantity Ordered (C) Unit (D) Unit Price (E) Amount (F) The Contractor Shall Provide Support To Define And Develop User Requirements, Provide Quick Reaction Support And Integrated Analytical And Operational Support To The Ftttf (Iaos) See Page 2 For A Detailed List Of Clins (Located In The Bom/Sow In Itss) Ceiling Amount Is $4,556,843.20
- Gsa/Fts Contracting Staff
- General Services Administration (Gsa)
- $15,389,205.25
- General Services Administration (Gsa)
- GST1004EC348A
- This Is A Time And Materials Task Order Awarded Against Bpa #Gs10t05eca4508. Task Order Id: A4s15b0348a Funding Document A4i406009 Applies To This Task Order. In Addition To The Clauses In The Fss Schedule, The Following Clauses Apply To This Task Order: 1. Far 52.204-2, Security Requirements (Aug 1996) 2. Far 52.217-8, Option To Extend Services (Nov 1999) 3. Far 52.217-9, Option To Extend The Term Of A Contract (Mar 2000) 4. Far 52.227-14, Rights In Data - General (Jun 1987) 5. Far 52.232-7, Payments Under Time-And-Materials And Labor-Hour Contracts 6. Far 52.232-19, Availability Of Funds For The Next Fiscal Year (Apr 1984) 7. Far 52.232-22, Limitation Of Funds (Apr 1984) 8. Subcontracting With Firms That Are Owned Or Controlled By The Government Of A Terrorist Country (See Full Text In The Bom/Sow In Itss) 9. Organizational Conflict Of Interest (See Full Text In The Bom/Sow In Itss) 10. Rights In Noncommercial Computer Software And Noncommercial Computer Software Documentation (See Full Text In The Bom/Sow In Itss) Iaw Far 52.232-7, The Government Will Withhold 5% Of The Amount Of Each Invoice Under The Labor Clin, Up To A Maximum Of $50,000. Once The Withhold Balance Equals $50,000, No Additional Dollars Will Be Withheld Under This Task Order. Upon Contractor Submission Of, And Government Acceptance Of The Final Invoice, The Contractor Will Be Paid The Withhold Balance. Contractor Is Not Authorized To Bill For Any Labor Categories Not Listed In Page 2 Of This Task Order Without Written Approval Of The Contracting Officer. Application Of General & Administrative Or Other Indirect Costs To Any Direct Costs Is Not Allowed. Note: This Task Order Is Incrementally Funded Per Far 52.232-22 Limitation Of Funds (Apr 1984). Performance Under This Task Order Ends On 14 Oct 2005. No Payment For Services Beyond That Date Will Be Made Unless Authorized By Written Modification To This Order. If The Funding Is Not Sufficient For Performance To Go Through 14 Oct 2005, Performance Must Stop. No Payments Will Be Made For Work Accomplished Beyond The Funded Amount Without Being Authorized By Written Modification To This Order. Item No. (A) Supplies Or Services (B) Quantity Ordered (C) Unit (D) Unit Price (E) Amount (F) The Contractor Shall Provide Support To Define And Develop User Requirements, Provide Quick Reaction Support And Integrated Analytical And Operational Support To The Ftttf (Iaos) See Page 2 For A Detailed List Of Clins (Located In The Bom/Sow In Itss) Ceiling Amount Is $4,556,843.20
- 8 May 2007
- This Is A Time And Materials Task Order Awarded Against Bpa #Gs10t05eca4508. Task Order Id: A4s15b0348a Funding Document A4i406009 Applies To This Task Order. In Addition To The Clauses In The Fss Schedule, The Following Clauses Apply To This Task Order: 1. Far 52.204-2, Security Requirements (Aug 1996) 2. Far 52.217-8, Option To Extend Services (Nov 1999) 3. Far 52.217-9, Option To Extend The Term Of A Contract (Mar 2000) 4. Far 52.227-14, Rights In Data - General (Jun 1987) 5. Far 52.232-7, Payments Under Time-And-Materials And Labor-Hour Contracts 6. Far 52.232-19, Availability Of Funds For The Next Fiscal Year (Apr 1984) 7. Far 52.232-22, Limitation Of Funds (Apr 1984) 8. Subcontracting With Firms That Are Owned Or Controlled By The Government Of A Terrorist Country (See Full Text In The Bom/Sow In Itss) 9. Organizational Conflict Of Interest (See Full Text In The Bom/Sow In Itss) 10. Rights In Noncommercial Computer Software And Noncommercial Computer Software Documentation (See Full Text In The Bom/Sow In Itss) Iaw Far 52.232-7, The Government Will Withhold 5% Of The Amount Of Each Invoice Under The Labor Clin, Up To A Maximum Of $50,000. Once The Withhold Balance Equals $50,000, No Additional Dollars Will Be Withheld Under This Task Order. Upon Contractor Submission Of, And Government Acceptance Of The Final Invoice, The Contractor Will Be Paid The Withhold Balance. Contractor Is Not Authorized To Bill For Any Labor Categories Not Listed In Page 2 Of This Task Order Without Written Approval Of The Contracting Officer. Application Of General & Administrative Or Other Indirect Costs To Any Direct Costs Is Not Allowed. Note: This Task Order Is Incrementally Funded Per Far 52.232-22 Limitation Of Funds (Apr 1984). Performance Under This Task Order Ends On 14 Oct 2005. No Payment For Services Beyond That Date Will Be Made Unless Authorized By Written Modification To This Order. If The Funding Is Not Sufficient For Performance To Go Through 14 Oct 2005, Performance Must Stop. No Payments Will Be Made For Work Accomplished Beyond The Funded Amount Without Being Authorized By Written Modification To This Order. Item No. (A) Supplies Or Services (B) Quantity Ordered (C) Unit (D) Unit Price (E) Amount (F) The Contractor Shall Provide Support To Define And Develop User Requirements, Provide Quick Reaction Support And Integrated Analytical And Operational Support To The Ftttf (Iaos) See Page 2 For A Detailed List Of Clins (Located In The Bom/Sow In Itss) Ceiling Amount Is $4,556,843.20
- Gsa/Fts Contracting Staff
- General Services Administration (Gsa)
- $15,389,205.25
- General Services Administration (Gsa)
- DJF141200G0006818
- Igf::Ot::Igf - Services
- 1 May 2014
- Igf::Ot::Igf - Services
- Dept Of Just/Federal Bureau Of Investigation
- Department Of Justice (Doj)
- $134,464.44
- Department Of Justice (Doj)
- DJFA0G005632
- System Engineering Technical Assistance
- 14 Aug 2010
- System Engineering Technical Assistance
- Dept Of Just/Federal Bureau Of Investigation
- Department Of Justice (Doj)
- $4,259,829.12
- Department Of Justice (Doj)
- DJFA3G304456
- Igf::Ot::Igf-Services
- 8 Jun 2015
- Igf::Ot::Igf-Services
- Dept Of Just/Federal Bureau Of Investigation
- Department Of Justice (Doj)
- $361,383.31
- Department Of Justice (Doj)
- GST1004EC346A
- This Is A Time And Materials Task Order Awarded Against Bpa #Gs10t05eca4508. Task Order Id: A4s15b0346a Funding Document A4i406020 Applies To This Task Order. In Addition To The Clauses In The Fss Schedule, The Following Clauses Apply To This Task Order: 1. Far 52.204-2, Security Requirements (Aug 1996) 2. Far 52.217-8, Option To Extend Services (Nov 1999) 3. Far 52.217-9, Option To Extend The Term Of A Contract (Mar 2000) 4. Far 52.227-14, Rights In Data - General (Jun 1987) 5. Far 52.232-7, Payments Under Time-And-Materials And Labor-Hour Contracts (Dec 2002) 6. Far 52.232-19, Availability Of Funds For The Next Fiscal Year (Apr 1984) 7. Subcontracting With Firms That Are Owned Or Controlled By The Government Of A Terrorist Country (See Full Text In The Bom/Sow In Itss) 8. Organizational Conflict Of Interest (See Full Text In The Bom/Sow In Itss) 9. Rights In Noncommercial Computer Software And Noncommercial Computer Software Documentation (See Full Text In The Bom/Sow In Itss) Iaw Far 52.232-7, The Government Will Withhold 5% Of The Amount Of Each Invoice Under The Labor Clin, Up To A Maximum Of $50,000. Once The Withhold Balance Equals $50,000, No Additional Dollars Will Be Withheld Under This Task Order. Upon Contractor Submission Of, And Government Acceptance Of The Final Invoice, The Contractor Will Be Paid The Withhold Balance. Contractor Is Not Authorized To Bill For Any Labor Categories Not Listed In Page 2 Of This Task Order Without Written Approval Of The Contracting Officer. Application Of General & Administrative Or Other Indirect Costs To Any Direct Costs Is Not Allowed. Note: Performance Under This Task Order Ends On 14 Oct 2005. No Payment For Services Beyond That Date Will Be Made Unless Authorized By Written Modification To This Order. If The Funding Is Not Sufficient For Performance To Go Through 14 Oct 2005, Performance Must Stop. No Payments Will Be Made For Work Accomplished Beyond The Funded Amount Without Being Authorized By Written Modification To This Order. Item No. (A) Supplies Or Services (B) Quantity Ordered (C) Unit (D) Unit Price (E) Amount (F) The Contractor Shall Provide Overall Seta And Technical Operations Support To Include Advanced Programmatics, Systems Engineering, Concept Analysis, System Reengineering Requirements And Execute At A High Level Of Detailed Specification Preparation, Configuration Management. See Page 2 For A Detailed List Of Clins (Located In The Bom/Sow In Itss) Ceiling Amount Is $7,965,032.00
- 6 Dec 2005
- This Is A Time And Materials Task Order Awarded Against Bpa #Gs10t05eca4508. Task Order Id: A4s15b0346a Funding Document A4i406020 Applies To This Task Order. In Addition To The Clauses In The Fss Schedule, The Following Clauses Apply To This Task Order: 1. Far 52.204-2, Security Requirements (Aug 1996) 2. Far 52.217-8, Option To Extend Services (Nov 1999) 3. Far 52.217-9, Option To Extend The Term Of A Contract (Mar 2000) 4. Far 52.227-14, Rights In Data - General (Jun 1987) 5. Far 52.232-7, Payments Under Time-And-Materials And Labor-Hour Contracts (Dec 2002) 6. Far 52.232-19, Availability Of Funds For The Next Fiscal Year (Apr 1984) 7. Subcontracting With Firms That Are Owned Or Controlled By The Government Of A Terrorist Country (See Full Text In The Bom/Sow In Itss) 8. Organizational Conflict Of Interest (See Full Text In The Bom/Sow In Itss) 9. Rights In Noncommercial Computer Software And Noncommercial Computer Software Documentation (See Full Text In The Bom/Sow In Itss) Iaw Far 52.232-7, The Government Will Withhold 5% Of The Amount Of Each Invoice Under The Labor Clin, Up To A Maximum Of $50,000. Once The Withhold Balance Equals $50,000, No Additional Dollars Will Be Withheld Under This Task Order. Upon Contractor Submission Of, And Government Acceptance Of The Final Invoice, The Contractor Will Be Paid The Withhold Balance. Contractor Is Not Authorized To Bill For Any Labor Categories Not Listed In Page 2 Of This Task Order Without Written Approval Of The Contracting Officer. Application Of General & Administrative Or Other Indirect Costs To Any Direct Costs Is Not Allowed. Note: Performance Under This Task Order Ends On 14 Oct 2005. No Payment For Services Beyond That Date Will Be Made Unless Authorized By Written Modification To This Order. If The Funding Is Not Sufficient For Performance To Go Through 14 Oct 2005, Performance Must Stop. No Payments Will Be Made For Work Accomplished Beyond The Funded Amount Without Being Authorized By Written Modification To This Order. Item No. (A) Supplies Or Services (B) Quantity Ordered (C) Unit (D) Unit Price (E) Amount (F) The Contractor Shall Provide Overall Seta And Technical Operations Support To Include Advanced Programmatics, Systems Engineering, Concept Analysis, System Reengineering Requirements And Execute At A High Level Of Detailed Specification Preparation, Configuration Management. See Page 2 For A Detailed List Of Clins (Located In The Bom/Sow In Itss) Ceiling Amount Is $7,965,032.00
- Gsa/Fts Contracting Staff
- General Services Administration (Gsa)
- $25,560,440.41
- General Services Administration (Gsa)
- GST1004EC346A
- This Is A Time And Materials Task Order Awarded Against Bpa #Gs10t05eca4508. Task Order Id: A4s15b0346a Funding Document A4i406020 Applies To This Task Order. In Addition To The Clauses In The Fss Schedule, The Following Clauses Apply To This Task Order: 1. Far 52.204-2, Security Requirements (Aug 1996) 2. Far 52.217-8, Option To Extend Services (Nov 1999) 3. Far 52.217-9, Option To Extend The Term Of A Contract (Mar 2000) 4. Far 52.227-14, Rights In Data - General (Jun 1987) 5. Far 52.232-7, Payments Under Time-And-Materials And Labor-Hour Contracts (Dec 2002) 6. Far 52.232-19, Availability Of Funds For The Next Fiscal Year (Apr 1984) 7. Subcontracting With Firms That Are Owned Or Controlled By The Government Of A Terrorist Country (See Full Text In The Bom/Sow In Itss) 8. Organizational Conflict Of Interest (See Full Text In The Bom/Sow In Itss) 9. Rights In Noncommercial Computer Software And Noncommercial Computer Software Documentation (See Full Text In The Bom/Sow In Itss) Iaw Far 52.232-7, The Government Will Withhold 5% Of The Amount Of Each Invoice Under The Labor Clin, Up To A Maximum Of $50,000. Once The Withhold Balance Equals $50,000, No Additional Dollars Will Be Withheld Under This Task Order. Upon Contractor Submission Of, And Government Acceptance Of The Final Invoice, The Contractor Will Be Paid The Withhold Balance. Contractor Is Not Authorized To Bill For Any Labor Categories Not Listed In Page 2 Of This Task Order Without Written Approval Of The Contracting Officer. Application Of General & Administrative Or Other Indirect Costs To Any Direct Costs Is Not Allowed. Note: Performance Under This Task Order Ends On 14 Oct 2005. No Payment For Services Beyond That Date Will Be Made Unless Authorized By Written Modification To This Order. If The Funding Is Not Sufficient For Performance To Go Through 14 Oct 2005, Performance Must Stop. No Payments Will Be Made For Work Accomplished Beyond The Funded Amount Without Being Authorized By Written Modification To This Order. Item No. (A) Supplies Or Services (B) Quantity Ordered (C) Unit (D) Unit Price (E) Amount (F) The Contractor Shall Provide Overall Seta And Technical Operations Support To Include Advanced Programmatics, Systems Engineering, Concept Analysis, System Reengineering Requirements And Execute At A High Level Of Detailed Specification Preparation, Configuration Management. See Page 2 For A Detailed List Of Clins (Located In The Bom/Sow In Itss) Ceiling Amount Is $7,965,032.00
- 19 May 2005
- This Is A Time And Materials Task Order Awarded Against Bpa #Gs10t05eca4508. Task Order Id: A4s15b0346a Funding Document A4i406020 Applies To This Task Order. In Addition To The Clauses In The Fss Schedule, The Following Clauses Apply To This Task Order: 1. Far 52.204-2, Security Requirements (Aug 1996) 2. Far 52.217-8, Option To Extend Services (Nov 1999) 3. Far 52.217-9, Option To Extend The Term Of A Contract (Mar 2000) 4. Far 52.227-14, Rights In Data - General (Jun 1987) 5. Far 52.232-7, Payments Under Time-And-Materials And Labor-Hour Contracts (Dec 2002) 6. Far 52.232-19, Availability Of Funds For The Next Fiscal Year (Apr 1984) 7. Subcontracting With Firms That Are Owned Or Controlled By The Government Of A Terrorist Country (See Full Text In The Bom/Sow In Itss) 8. Organizational Conflict Of Interest (See Full Text In The Bom/Sow In Itss) 9. Rights In Noncommercial Computer Software And Noncommercial Computer Software Documentation (See Full Text In The Bom/Sow In Itss) Iaw Far 52.232-7, The Government Will Withhold 5% Of The Amount Of Each Invoice Under The Labor Clin, Up To A Maximum Of $50,000. Once The Withhold Balance Equals $50,000, No Additional Dollars Will Be Withheld Under This Task Order. Upon Contractor Submission Of, And Government Acceptance Of The Final Invoice, The Contractor Will Be Paid The Withhold Balance. Contractor Is Not Authorized To Bill For Any Labor Categories Not Listed In Page 2 Of This Task Order Without Written Approval Of The Contracting Officer. Application Of General & Administrative Or Other Indirect Costs To Any Direct Costs Is Not Allowed. Note: Performance Under This Task Order Ends On 14 Oct 2005. No Payment For Services Beyond That Date Will Be Made Unless Authorized By Written Modification To This Order. If The Funding Is Not Sufficient For Performance To Go Through 14 Oct 2005, Performance Must Stop. No Payments Will Be Made For Work Accomplished Beyond The Funded Amount Without Being Authorized By Written Modification To This Order. Item No. (A) Supplies Or Services (B) Quantity Ordered (C) Unit (D) Unit Price (E) Amount (F) The Contractor Shall Provide Overall Seta And Technical Operations Support To Include Advanced Programmatics, Systems Engineering, Concept Analysis, System Reengineering Requirements And Execute At A High Level Of Detailed Specification Preparation, Configuration Management. See Page 2 For A Detailed List Of Clins (Located In The Bom/Sow In Itss) Ceiling Amount Is $7,965,032.00
- Gsa/Fts Contracting Staff
- General Services Administration (Gsa)
- $25,560,440.41
- General Services Administration (Gsa)
- GST1004EC346A
- This Is A Time And Materials Task Order Awarded Against Bpa #Gs10t05eca4508. Task Order Id: A4s15b0346a Funding Document A4i406020 Applies To This Task Order. In Addition To The Clauses In The Fss Schedule, The Following Clauses Apply To This Task Order: 1. Far 52.204-2, Security Requirements (Aug 1996) 2. Far 52.217-8, Option To Extend Services (Nov 1999) 3. Far 52.217-9, Option To Extend The Term Of A Contract (Mar 2000) 4. Far 52.227-14, Rights In Data - General (Jun 1987) 5. Far 52.232-7, Payments Under Time-And-Materials And Labor-Hour Contracts (Dec 2002) 6. Far 52.232-19, Availability Of Funds For The Next Fiscal Year (Apr 1984) 7. Subcontracting With Firms That Are Owned Or Controlled By The Government Of A Terrorist Country (See Full Text In The Bom/Sow In Itss) 8. Organizational Conflict Of Interest (See Full Text In The Bom/Sow In Itss) 9. Rights In Noncommercial Computer Software And Noncommercial Computer Software Documentation (See Full Text In The Bom/Sow In Itss) Iaw Far 52.232-7, The Government Will Withhold 5% Of The Amount Of Each Invoice Under The Labor Clin, Up To A Maximum Of $50,000. Once The Withhold Balance Equals $50,000, No Additional Dollars Will Be Withheld Under This Task Order. Upon Contractor Submission Of, And Government Acceptance Of The Final Invoice, The Contractor Will Be Paid The Withhold Balance. Contractor Is Not Authorized To Bill For Any Labor Categories Not Listed In Page 2 Of This Task Order Without Written Approval Of The Contracting Officer. Application Of General & Administrative Or Other Indirect Costs To Any Direct Costs Is Not Allowed. Note: Performance Under This Task Order Ends On 14 Oct 2005. No Payment For Services Beyond That Date Will Be Made Unless Authorized By Written Modification To This Order. If The Funding Is Not Sufficient For Performance To Go Through 14 Oct 2005, Performance Must Stop. No Payments Will Be Made For Work Accomplished Beyond The Funded Amount Without Being Authorized By Written Modification To This Order. Item No. (A) Supplies Or Services (B) Quantity Ordered (C) Unit (D) Unit Price (E) Amount (F) The Contractor Shall Provide Overall Seta And Technical Operations Support To Include Advanced Programmatics, Systems Engineering, Concept Analysis, System Reengineering Requirements And Execute At A High Level Of Detailed Specification Preparation, Configuration Management. See Page 2 For A Detailed List Of Clins (Located In The Bom/Sow In Itss) Ceiling Amount Is $7,965,032.00
- 12 Feb 2007
- This Is A Time And Materials Task Order Awarded Against Bpa #Gs10t05eca4508. Task Order Id: A4s15b0346a Funding Document A4i406020 Applies To This Task Order. In Addition To The Clauses In The Fss Schedule, The Following Clauses Apply To This Task Order: 1. Far 52.204-2, Security Requirements (Aug 1996) 2. Far 52.217-8, Option To Extend Services (Nov 1999) 3. Far 52.217-9, Option To Extend The Term Of A Contract (Mar 2000) 4. Far 52.227-14, Rights In Data - General (Jun 1987) 5. Far 52.232-7, Payments Under Time-And-Materials And Labor-Hour Contracts (Dec 2002) 6. Far 52.232-19, Availability Of Funds For The Next Fiscal Year (Apr 1984) 7. Subcontracting With Firms That Are Owned Or Controlled By The Government Of A Terrorist Country (See Full Text In The Bom/Sow In Itss) 8. Organizational Conflict Of Interest (See Full Text In The Bom/Sow In Itss) 9. Rights In Noncommercial Computer Software And Noncommercial Computer Software Documentation (See Full Text In The Bom/Sow In Itss) Iaw Far 52.232-7, The Government Will Withhold 5% Of The Amount Of Each Invoice Under The Labor Clin, Up To A Maximum Of $50,000. Once The Withhold Balance Equals $50,000, No Additional Dollars Will Be Withheld Under This Task Order. Upon Contractor Submission Of, And Government Acceptance Of The Final Invoice, The Contractor Will Be Paid The Withhold Balance. Contractor Is Not Authorized To Bill For Any Labor Categories Not Listed In Page 2 Of This Task Order Without Written Approval Of The Contracting Officer. Application Of General & Administrative Or Other Indirect Costs To Any Direct Costs Is Not Allowed. Note: Performance Under This Task Order Ends On 14 Oct 2005. No Payment For Services Beyond That Date Will Be Made Unless Authorized By Written Modification To This Order. If The Funding Is Not Sufficient For Performance To Go Through 14 Oct 2005, Performance Must Stop. No Payments Will Be Made For Work Accomplished Beyond The Funded Amount Without Being Authorized By Written Modification To This Order. Item No. (A) Supplies Or Services (B) Quantity Ordered (C) Unit (D) Unit Price (E) Amount (F) The Contractor Shall Provide Overall Seta And Technical Operations Support To Include Advanced Programmatics, Systems Engineering, Concept Analysis, System Reengineering Requirements And Execute At A High Level Of Detailed Specification Preparation, Configuration Management. See Page 2 For A Detailed List Of Clins (Located In The Bom/Sow In Itss) Ceiling Amount Is $7,965,032.00
- Gsa/Fts Contracting Staff
- General Services Administration (Gsa)
- $25,560,440.41
- General Services Administration (Gsa)
- GST1004EC346A
- This Is A Time And Materials Task Order Awarded Against Bpa #Gs10t05eca4508. Task Order Id: A4s15b0346a Funding Document A4i406020 Applies To This Task Order. In Addition To The Clauses In The Fss Schedule, The Following Clauses Apply To This Task Order: 1. Far 52.204-2, Security Requirements (Aug 1996) 2. Far 52.217-8, Option To Extend Services (Nov 1999) 3. Far 52.217-9, Option To Extend The Term Of A Contract (Mar 2000) 4. Far 52.227-14, Rights In Data - General (Jun 1987) 5. Far 52.232-7, Payments Under Time-And-Materials And Labor-Hour Contracts (Dec 2002) 6. Far 52.232-19, Availability Of Funds For The Next Fiscal Year (Apr 1984) 7. Subcontracting With Firms That Are Owned Or Controlled By The Government Of A Terrorist Country (See Full Text In The Bom/Sow In Itss) 8. Organizational Conflict Of Interest (See Full Text In The Bom/Sow In Itss) 9. Rights In Noncommercial Computer Software And Noncommercial Computer Software Documentation (See Full Text In The Bom/Sow In Itss) Iaw Far 52.232-7, The Government Will Withhold 5% Of The Amount Of Each Invoice Under The Labor Clin, Up To A Maximum Of $50,000. Once The Withhold Balance Equals $50,000, No Additional Dollars Will Be Withheld Under This Task Order. Upon Contractor Submission Of, And Government Acceptance Of The Final Invoice, The Contractor Will Be Paid The Withhold Balance. Contractor Is Not Authorized To Bill For Any Labor Categories Not Listed In Page 2 Of This Task Order Without Written Approval Of The Contracting Officer. Application Of General & Administrative Or Other Indirect Costs To Any Direct Costs Is Not Allowed. Note: Performance Under This Task Order Ends On 14 Oct 2005. No Payment For Services Beyond That Date Will Be Made Unless Authorized By Written Modification To This Order. If The Funding Is Not Sufficient For Performance To Go Through 14 Oct 2005, Performance Must Stop. No Payments Will Be Made For Work Accomplished Beyond The Funded Amount Without Being Authorized By Written Modification To This Order. Item No. (A) Supplies Or Services (B) Quantity Ordered (C) Unit (D) Unit Price (E) Amount (F) The Contractor Shall Provide Overall Seta And Technical Operations Support To Include Advanced Programmatics, Systems Engineering, Concept Analysis, System Reengineering Requirements And Execute At A High Level Of Detailed Specification Preparation, Configuration Management. See Page 2 For A Detailed List Of Clins (Located In The Bom/Sow In Itss) Ceiling Amount Is $7,965,032.00
- 8 May 2007
- This Is A Time And Materials Task Order Awarded Against Bpa #Gs10t05eca4508. Task Order Id: A4s15b0346a Funding Document A4i406020 Applies To This Task Order. In Addition To The Clauses In The Fss Schedule, The Following Clauses Apply To This Task Order: 1. Far 52.204-2, Security Requirements (Aug 1996) 2. Far 52.217-8, Option To Extend Services (Nov 1999) 3. Far 52.217-9, Option To Extend The Term Of A Contract (Mar 2000) 4. Far 52.227-14, Rights In Data - General (Jun 1987) 5. Far 52.232-7, Payments Under Time-And-Materials And Labor-Hour Contracts (Dec 2002) 6. Far 52.232-19, Availability Of Funds For The Next Fiscal Year (Apr 1984) 7. Subcontracting With Firms That Are Owned Or Controlled By The Government Of A Terrorist Country (See Full Text In The Bom/Sow In Itss) 8. Organizational Conflict Of Interest (See Full Text In The Bom/Sow In Itss) 9. Rights In Noncommercial Computer Software And Noncommercial Computer Software Documentation (See Full Text In The Bom/Sow In Itss) Iaw Far 52.232-7, The Government Will Withhold 5% Of The Amount Of Each Invoice Under The Labor Clin, Up To A Maximum Of $50,000. Once The Withhold Balance Equals $50,000, No Additional Dollars Will Be Withheld Under This Task Order. Upon Contractor Submission Of, And Government Acceptance Of The Final Invoice, The Contractor Will Be Paid The Withhold Balance. Contractor Is Not Authorized To Bill For Any Labor Categories Not Listed In Page 2 Of This Task Order Without Written Approval Of The Contracting Officer. Application Of General & Administrative Or Other Indirect Costs To Any Direct Costs Is Not Allowed. Note: Performance Under This Task Order Ends On 14 Oct 2005. No Payment For Services Beyond That Date Will Be Made Unless Authorized By Written Modification To This Order. If The Funding Is Not Sufficient For Performance To Go Through 14 Oct 2005, Performance Must Stop. No Payments Will Be Made For Work Accomplished Beyond The Funded Amount Without Being Authorized By Written Modification To This Order. Item No. (A) Supplies Or Services (B) Quantity Ordered (C) Unit (D) Unit Price (E) Amount (F) The Contractor Shall Provide Overall Seta And Technical Operations Support To Include Advanced Programmatics, Systems Engineering, Concept Analysis, System Reengineering Requirements And Execute At A High Level Of Detailed Specification Preparation, Configuration Management. See Page 2 For A Detailed List Of Clins (Located In The Bom/Sow In Itss) Ceiling Amount Is $7,965,032.00
- Gsa/Fts Contracting Staff
- General Services Administration (Gsa)
- $25,560,440.41
- General Services Administration (Gsa)
- GST1004EC347A
- This Is A Time And Materials Task Order Awarded Against Bpa #Gs10t05eca4508. Task Order Id: A4s15b0347a Funding Document A4i406293 Applies To This Task Order. In Addition To The Clauses In The Fss Schedule, The Following Clauses Apply To This Task Order: 1. Far 52.204-2, Security Requirements (Aug 1996) 2. Far 52.217-8, Option To Extend Services (Nov 1999) 3. Far 52.217-9, Option To Extend The Term Of A Contract (Mar 2000) 4. Far 52.227-14, Rights In Data - General (Jun 1987) 5. Far 52.232-7, Payments Under Time-And-Materials And Labor-Hour Contracts (Dec 2002) 6. Far 52.232-19, Availability Of Funds For The Next Fiscal Year (Apr 1984) 7. Far 52.232-22, Limitation Of Funds (Apr 1984) 8. Subcontracting With Firms That Are Owned Or Controlled By The Government Of A Terrorist Country (See Full Text In The Bom/Sow In Itss) 9. Organizational Conflict Of Interest (See Full Text In The Bom/Sow In Itss) 10. Rights In Noncommercial Computer Software And Noncommercial Computer Software Documentation (See Full Text In The Bom/Sow In Itss) Iaw Far 52.232-7, The Government Will Withhold 5% Of The Amount Of Each Invoice Under The Labor Clin, Up To A Maximum Of $50,000. Once The Withhold Balance Equals $50,000, No Additional Dollars Will Be Withheld Under This Task Order. Upon Contractor Submission Of, And Government Acceptance Of The Final Invoice, The Contractor Will Be Paid The Withhold Balance. Contractor Is Not Authorized To Bill For Any Labor Categories Not Listed In Page 2 Of This Task Order Without Written Approval Of The Contracting Officer. Application Of General & Administrative Or Other Indirect Costs To Any Direct Costs Is Not Allowed. Note: This Task Order Is Incrementally Funded Per Far 52.232-22 Limitation Of Funds (Apr 1984). Performance Under This Task Order Ends On 14 Oct 2005. No Payment For Services Beyond That Date Will Be Made Unless Authorized By Written Modification To This Order. If The Funding Is Not Sufficient For Performance To Go Through 14 Oct 2005, Performance Must Stop. No Payments Will Be Made For Work Accomplished Beyond The Funded Amount Without Being Authorized By Written Modification To This Order. Item No. (A) Supplies Or Services (B) Quantity Ordered (C) Unit (D) Unit Price (E) Amount (F) Provide Advanced Data Visualization, Dissemination And Integration Solutions Support To The Ftttf (Dvd). See Page 2 For A Detailed List Of Clins (Located In The Bom/Sow In Itss) Ceiling Amount Is $3,296,404.80
- 1 Jul 2005
- This Is A Time And Materials Task Order Awarded Against Bpa #Gs10t05eca4508. Task Order Id: A4s15b0347a Funding Document A4i406293 Applies To This Task Order. In Addition To The Clauses In The Fss Schedule, The Following Clauses Apply To This Task Order: 1. Far 52.204-2, Security Requirements (Aug 1996) 2. Far 52.217-8, Option To Extend Services (Nov 1999) 3. Far 52.217-9, Option To Extend The Term Of A Contract (Mar 2000) 4. Far 52.227-14, Rights In Data - General (Jun 1987) 5. Far 52.232-7, Payments Under Time-And-Materials And Labor-Hour Contracts (Dec 2002) 6. Far 52.232-19, Availability Of Funds For The Next Fiscal Year (Apr 1984) 7. Far 52.232-22, Limitation Of Funds (Apr 1984) 8. Subcontracting With Firms That Are Owned Or Controlled By The Government Of A Terrorist Country (See Full Text In The Bom/Sow In Itss) 9. Organizational Conflict Of Interest (See Full Text In The Bom/Sow In Itss) 10. Rights In Noncommercial Computer Software And Noncommercial Computer Software Documentation (See Full Text In The Bom/Sow In Itss) Iaw Far 52.232-7, The Government Will Withhold 5% Of The Amount Of Each Invoice Under The Labor Clin, Up To A Maximum Of $50,000. Once The Withhold Balance Equals $50,000, No Additional Dollars Will Be Withheld Under This Task Order. Upon Contractor Submission Of, And Government Acceptance Of The Final Invoice, The Contractor Will Be Paid The Withhold Balance. Contractor Is Not Authorized To Bill For Any Labor Categories Not Listed In Page 2 Of This Task Order Without Written Approval Of The Contracting Officer. Application Of General & Administrative Or Other Indirect Costs To Any Direct Costs Is Not Allowed. Note: This Task Order Is Incrementally Funded Per Far 52.232-22 Limitation Of Funds (Apr 1984). Performance Under This Task Order Ends On 14 Oct 2005. No Payment For Services Beyond That Date Will Be Made Unless Authorized By Written Modification To This Order. If The Funding Is Not Sufficient For Performance To Go Through 14 Oct 2005, Performance Must Stop. No Payments Will Be Made For Work Accomplished Beyond The Funded Amount Without Being Authorized By Written Modification To This Order. Item No. (A) Supplies Or Services (B) Quantity Ordered (C) Unit (D) Unit Price (E) Amount (F) Provide Advanced Data Visualization, Dissemination And Integration Solutions Support To The Ftttf (Dvd). See Page 2 For A Detailed List Of Clins (Located In The Bom/Sow In Itss) Ceiling Amount Is $3,296,404.80
- Gsa/Fts Contracting Staff
- General Services Administration (Gsa)
- $12,194,761.44
- General Services Administration (Gsa)
- GST1004EC347A
- This Is A Time And Materials Task Order Awarded Against Bpa #Gs10t05eca4508. Task Order Id: A4s15b0347a Funding Document A4i406293 Applies To This Task Order. In Addition To The Clauses In The Fss Schedule, The Following Clauses Apply To This Task Order: 1. Far 52.204-2, Security Requirements (Aug 1996) 2. Far 52.217-8, Option To Extend Services (Nov 1999) 3. Far 52.217-9, Option To Extend The Term Of A Contract (Mar 2000) 4. Far 52.227-14, Rights In Data - General (Jun 1987) 5. Far 52.232-7, Payments Under Time-And-Materials And Labor-Hour Contracts (Dec 2002) 6. Far 52.232-19, Availability Of Funds For The Next Fiscal Year (Apr 1984) 7. Far 52.232-22, Limitation Of Funds (Apr 1984) 8. Subcontracting With Firms That Are Owned Or Controlled By The Government Of A Terrorist Country (See Full Text In The Bom/Sow In Itss) 9. Organizational Conflict Of Interest (See Full Text In The Bom/Sow In Itss) 10. Rights In Noncommercial Computer Software And Noncommercial Computer Software Documentation (See Full Text In The Bom/Sow In Itss) Iaw Far 52.232-7, The Government Will Withhold 5% Of The Amount Of Each Invoice Under The Labor Clin, Up To A Maximum Of $50,000. Once The Withhold Balance Equals $50,000, No Additional Dollars Will Be Withheld Under This Task Order. Upon Contractor Submission Of, And Government Acceptance Of The Final Invoice, The Contractor Will Be Paid The Withhold Balance. Contractor Is Not Authorized To Bill For Any Labor Categories Not Listed In Page 2 Of This Task Order Without Written Approval Of The Contracting Officer. Application Of General & Administrative Or Other Indirect Costs To Any Direct Costs Is Not Allowed. Note: This Task Order Is Incrementally Funded Per Far 52.232-22 Limitation Of Funds (Apr 1984). Performance Under This Task Order Ends On 14 Oct 2005. No Payment For Services Beyond That Date Will Be Made Unless Authorized By Written Modification To This Order. If The Funding Is Not Sufficient For Performance To Go Through 14 Oct 2005, Performance Must Stop. No Payments Will Be Made For Work Accomplished Beyond The Funded Amount Without Being Authorized By Written Modification To This Order. Item No. (A) Supplies Or Services (B) Quantity Ordered (C) Unit (D) Unit Price (E) Amount (F) Provide Advanced Data Visualization, Dissemination And Integration Solutions Support To The Ftttf (Dvd). See Page 2 For A Detailed List Of Clins (Located In The Bom/Sow In Itss) Ceiling Amount Is $3,296,404.80
- 14 Sep 2005
- This Is A Time And Materials Task Order Awarded Against Bpa #Gs10t05eca4508. Task Order Id: A4s15b0347a Funding Document A4i406293 Applies To This Task Order. In Addition To The Clauses In The Fss Schedule, The Following Clauses Apply To This Task Order: 1. Far 52.204-2, Security Requirements (Aug 1996) 2. Far 52.217-8, Option To Extend Services (Nov 1999) 3. Far 52.217-9, Option To Extend The Term Of A Contract (Mar 2000) 4. Far 52.227-14, Rights In Data - General (Jun 1987) 5. Far 52.232-7, Payments Under Time-And-Materials And Labor-Hour Contracts (Dec 2002) 6. Far 52.232-19, Availability Of Funds For The Next Fiscal Year (Apr 1984) 7. Far 52.232-22, Limitation Of Funds (Apr 1984) 8. Subcontracting With Firms That Are Owned Or Controlled By The Government Of A Terrorist Country (See Full Text In The Bom/Sow In Itss) 9. Organizational Conflict Of Interest (See Full Text In The Bom/Sow In Itss) 10. Rights In Noncommercial Computer Software And Noncommercial Computer Software Documentation (See Full Text In The Bom/Sow In Itss) Iaw Far 52.232-7, The Government Will Withhold 5% Of The Amount Of Each Invoice Under The Labor Clin, Up To A Maximum Of $50,000. Once The Withhold Balance Equals $50,000, No Additional Dollars Will Be Withheld Under This Task Order. Upon Contractor Submission Of, And Government Acceptance Of The Final Invoice, The Contractor Will Be Paid The Withhold Balance. Contractor Is Not Authorized To Bill For Any Labor Categories Not Listed In Page 2 Of This Task Order Without Written Approval Of The Contracting Officer. Application Of General & Administrative Or Other Indirect Costs To Any Direct Costs Is Not Allowed. Note: This Task Order Is Incrementally Funded Per Far 52.232-22 Limitation Of Funds (Apr 1984). Performance Under This Task Order Ends On 14 Oct 2005. No Payment For Services Beyond That Date Will Be Made Unless Authorized By Written Modification To This Order. If The Funding Is Not Sufficient For Performance To Go Through 14 Oct 2005, Performance Must Stop. No Payments Will Be Made For Work Accomplished Beyond The Funded Amount Without Being Authorized By Written Modification To This Order. Item No. (A) Supplies Or Services (B) Quantity Ordered (C) Unit (D) Unit Price (E) Amount (F) Provide Advanced Data Visualization, Dissemination And Integration Solutions Support To The Ftttf (Dvd). See Page 2 For A Detailed List Of Clins (Located In The Bom/Sow In Itss) Ceiling Amount Is $3,296,404.80
- Gsa/Fts Contracting Staff
- General Services Administration (Gsa)
- $12,194,761.44
- General Services Administration (Gsa)
- DJFA3G301093
- Igf::Ot::Igf - Services
- 11 Feb 2013
- Igf::Ot::Igf - Services
- Dept Of Just/Federal Bureau Of Investigation
- Department Of Justice (Doj)
- $828,928.48
- Department Of Justice (Doj)
- DJFA3G304452
- Igf::Ot::Igf-Services
- 8 Jun 2015
- Igf::Ot::Igf-Services
- Dept Of Just/Federal Bureau Of Investigation
- Department Of Justice (Doj)
- $236,151.28
- Department Of Justice (Doj)
- DJFA2G201494
- Igf::Ot::Igf Other Functions - Services
- 28 Jun 2012
- Igf::Ot::Igf Other Functions - Services
- Dept Of Just/Federal Bureau Of Investigation
- Department Of Justice (Doj)
- $544,841.43
- Department Of Justice (Doj)
- GST1004EC346A
- This Is A Time And Materials Task Order Awarded Against Bpa #Gs10t05eca4508. Task Order Id: A4s15b0346a Funding Document A4i406020 Applies To This Task Order. In Addition To The Clauses In The Fss Schedule, The Following Clauses Apply To This Task Order: 1. Far 52.204-2, Security Requirements (Aug 1996) 2. Far 52.217-8, Option To Extend Services (Nov 1999) 3. Far 52.217-9, Option To Extend The Term Of A Contract (Mar 2000) 4. Far 52.227-14, Rights In Data - General (Jun 1987) 5. Far 52.232-7, Payments Under Time-And-Materials And Labor-Hour Contracts (Dec 2002) 6. Far 52.232-19, Availability Of Funds For The Next Fiscal Year (Apr 1984) 7. Subcontracting With Firms That Are Owned Or Controlled By The Government Of A Terrorist Country (See Full Text In The Bom/Sow In Itss) 8. Organizational Conflict Of Interest (See Full Text In The Bom/Sow In Itss) 9. Rights In Noncommercial Computer Software And Noncommercial Computer Software Documentation (See Full Text In The Bom/Sow In Itss) Iaw Far 52.232-7, The Government Will Withhold 5% Of The Amount Of Each Invoice Under The Labor Clin, Up To A Maximum Of $50,000. Once The Withhold Balance Equals $50,000, No Additional Dollars Will Be Withheld Under This Task Order. Upon Contractor Submission Of, And Government Acceptance Of The Final Invoice, The Contractor Will Be Paid The Withhold Balance. Contractor Is Not Authorized To Bill For Any Labor Categories Not Listed In Page 2 Of This Task Order Without Written Approval Of The Contracting Officer. Application Of General & Administrative Or Other Indirect Costs To Any Direct Costs Is Not Allowed. Note: Performance Under This Task Order Ends On 14 Oct 2005. No Payment For Services Beyond That Date Will Be Made Unless Authorized By Written Modification To This Order. If The Funding Is Not Sufficient For Performance To Go Through 14 Oct 2005, Performance Must Stop. No Payments Will Be Made For Work Accomplished Beyond The Funded Amount Without Being Authorized By Written Modification To This Order. Item No. (A) Supplies Or Services (B) Quantity Ordered (C) Unit (D) Unit Price (E) Amount (F) The Contractor Shall Provide Overall Seta And Technical Operations Support To Include Advanced Programmatics, Systems Engineering, Concept Analysis, System Reengineering Requirements And Execute At A High Level Of Detailed Specification Preparation, Configuration Management. See Page 2 For A Detailed List Of Clins (Located In The Bom/Sow In Itss) Ceiling Amount Is $7,965,032.00
- 6 Nov 2006
- This Is A Time And Materials Task Order Awarded Against Bpa #Gs10t05eca4508. Task Order Id: A4s15b0346a Funding Document A4i406020 Applies To This Task Order. In Addition To The Clauses In The Fss Schedule, The Following Clauses Apply To This Task Order: 1. Far 52.204-2, Security Requirements (Aug 1996) 2. Far 52.217-8, Option To Extend Services (Nov 1999) 3. Far 52.217-9, Option To Extend The Term Of A Contract (Mar 2000) 4. Far 52.227-14, Rights In Data - General (Jun 1987) 5. Far 52.232-7, Payments Under Time-And-Materials And Labor-Hour Contracts (Dec 2002) 6. Far 52.232-19, Availability Of Funds For The Next Fiscal Year (Apr 1984) 7. Subcontracting With Firms That Are Owned Or Controlled By The Government Of A Terrorist Country (See Full Text In The Bom/Sow In Itss) 8. Organizational Conflict Of Interest (See Full Text In The Bom/Sow In Itss) 9. Rights In Noncommercial Computer Software And Noncommercial Computer Software Documentation (See Full Text In The Bom/Sow In Itss) Iaw Far 52.232-7, The Government Will Withhold 5% Of The Amount Of Each Invoice Under The Labor Clin, Up To A Maximum Of $50,000. Once The Withhold Balance Equals $50,000, No Additional Dollars Will Be Withheld Under This Task Order. Upon Contractor Submission Of, And Government Acceptance Of The Final Invoice, The Contractor Will Be Paid The Withhold Balance. Contractor Is Not Authorized To Bill For Any Labor Categories Not Listed In Page 2 Of This Task Order Without Written Approval Of The Contracting Officer. Application Of General & Administrative Or Other Indirect Costs To Any Direct Costs Is Not Allowed. Note: Performance Under This Task Order Ends On 14 Oct 2005. No Payment For Services Beyond That Date Will Be Made Unless Authorized By Written Modification To This Order. If The Funding Is Not Sufficient For Performance To Go Through 14 Oct 2005, Performance Must Stop. No Payments Will Be Made For Work Accomplished Beyond The Funded Amount Without Being Authorized By Written Modification To This Order. Item No. (A) Supplies Or Services (B) Quantity Ordered (C) Unit (D) Unit Price (E) Amount (F) The Contractor Shall Provide Overall Seta And Technical Operations Support To Include Advanced Programmatics, Systems Engineering, Concept Analysis, System Reengineering Requirements And Execute At A High Level Of Detailed Specification Preparation, Configuration Management. See Page 2 For A Detailed List Of Clins (Located In The Bom/Sow In Itss) Ceiling Amount Is $7,965,032.00
- Gsa/Fts Contracting Staff
- General Services Administration (Gsa)
- $25,560,440.41
- General Services Administration (Gsa)
- GST1004EC347A
- This Is A Time And Materials Task Order Awarded Against Bpa #Gs10t05eca4508. Task Order Id: A4s15b0347a Funding Document A4i406293 Applies To This Task Order. In Addition To The Clauses In The Fss Schedule, The Following Clauses Apply To This Task Order: 1. Far 52.204-2, Security Requirements (Aug 1996) 2. Far 52.217-8, Option To Extend Services (Nov 1999) 3. Far 52.217-9, Option To Extend The Term Of A Contract (Mar 2000) 4. Far 52.227-14, Rights In Data - General (Jun 1987) 5. Far 52.232-7, Payments Under Time-And-Materials And Labor-Hour Contracts (Dec 2002) 6. Far 52.232-19, Availability Of Funds For The Next Fiscal Year (Apr 1984) 7. Far 52.232-22, Limitation Of Funds (Apr 1984) 8. Subcontracting With Firms That Are Owned Or Controlled By The Government Of A Terrorist Country (See Full Text In The Bom/Sow In Itss) 9. Organizational Conflict Of Interest (See Full Text In The Bom/Sow In Itss) 10. Rights In Noncommercial Computer Software And Noncommercial Computer Software Documentation (See Full Text In The Bom/Sow In Itss) Iaw Far 52.232-7, The Government Will Withhold 5% Of The Amount Of Each Invoice Under The Labor Clin, Up To A Maximum Of $50,000. Once The Withhold Balance Equals $50,000, No Additional Dollars Will Be Withheld Under This Task Order. Upon Contractor Submission Of, And Government Acceptance Of The Final Invoice, The Contractor Will Be Paid The Withhold Balance. Contractor Is Not Authorized To Bill For Any Labor Categories Not Listed In Page 2 Of This Task Order Without Written Approval Of The Contracting Officer. Application Of General & Administrative Or Other Indirect Costs To Any Direct Costs Is Not Allowed. Note: This Task Order Is Incrementally Funded Per Far 52.232-22 Limitation Of Funds (Apr 1984). Performance Under This Task Order Ends On 14 Oct 2005. No Payment For Services Beyond That Date Will Be Made Unless Authorized By Written Modification To This Order. If The Funding Is Not Sufficient For Performance To Go Through 14 Oct 2005, Performance Must Stop. No Payments Will Be Made For Work Accomplished Beyond The Funded Amount Without Being Authorized By Written Modification To This Order. Item No. (A) Supplies Or Services (B) Quantity Ordered (C) Unit (D) Unit Price (E) Amount (F) Provide Advanced Data Visualization, Dissemination And Integration Solutions Support To The Ftttf (Dvd). See Page 2 For A Detailed List Of Clins (Located In The Bom/Sow In Itss) Ceiling Amount Is $3,296,404.80
- 29 Jul 2005
- This Is A Time And Materials Task Order Awarded Against Bpa #Gs10t05eca4508. Task Order Id: A4s15b0347a Funding Document A4i406293 Applies To This Task Order. In Addition To The Clauses In The Fss Schedule, The Following Clauses Apply To This Task Order: 1. Far 52.204-2, Security Requirements (Aug 1996) 2. Far 52.217-8, Option To Extend Services (Nov 1999) 3. Far 52.217-9, Option To Extend The Term Of A Contract (Mar 2000) 4. Far 52.227-14, Rights In Data - General (Jun 1987) 5. Far 52.232-7, Payments Under Time-And-Materials And Labor-Hour Contracts (Dec 2002) 6. Far 52.232-19, Availability Of Funds For The Next Fiscal Year (Apr 1984) 7. Far 52.232-22, Limitation Of Funds (Apr 1984) 8. Subcontracting With Firms That Are Owned Or Controlled By The Government Of A Terrorist Country (See Full Text In The Bom/Sow In Itss) 9. Organizational Conflict Of Interest (See Full Text In The Bom/Sow In Itss) 10. Rights In Noncommercial Computer Software And Noncommercial Computer Software Documentation (See Full Text In The Bom/Sow In Itss) Iaw Far 52.232-7, The Government Will Withhold 5% Of The Amount Of Each Invoice Under The Labor Clin, Up To A Maximum Of $50,000. Once The Withhold Balance Equals $50,000, No Additional Dollars Will Be Withheld Under This Task Order. Upon Contractor Submission Of, And Government Acceptance Of The Final Invoice, The Contractor Will Be Paid The Withhold Balance. Contractor Is Not Authorized To Bill For Any Labor Categories Not Listed In Page 2 Of This Task Order Without Written Approval Of The Contracting Officer. Application Of General & Administrative Or Other Indirect Costs To Any Direct Costs Is Not Allowed. Note: This Task Order Is Incrementally Funded Per Far 52.232-22 Limitation Of Funds (Apr 1984). Performance Under This Task Order Ends On 14 Oct 2005. No Payment For Services Beyond That Date Will Be Made Unless Authorized By Written Modification To This Order. If The Funding Is Not Sufficient For Performance To Go Through 14 Oct 2005, Performance Must Stop. No Payments Will Be Made For Work Accomplished Beyond The Funded Amount Without Being Authorized By Written Modification To This Order. Item No. (A) Supplies Or Services (B) Quantity Ordered (C) Unit (D) Unit Price (E) Amount (F) Provide Advanced Data Visualization, Dissemination And Integration Solutions Support To The Ftttf (Dvd). See Page 2 For A Detailed List Of Clins (Located In The Bom/Sow In Itss) Ceiling Amount Is $3,296,404.80
- Gsa/Fts Contracting Staff
- General Services Administration (Gsa)
- $12,194,761.44
- General Services Administration (Gsa)
- GST1004EC347A
- This Is A Time And Materials Task Order Awarded Against Bpa #Gs10t05eca4508. Task Order Id: A4s15b0347a Funding Document A4i406293 Applies To This Task Order. In Addition To The Clauses In The Fss Schedule, The Following Clauses Apply To This Task Order: 1. Far 52.204-2, Security Requirements (Aug 1996) 2. Far 52.217-8, Option To Extend Services (Nov 1999) 3. Far 52.217-9, Option To Extend The Term Of A Contract (Mar 2000) 4. Far 52.227-14, Rights In Data - General (Jun 1987) 5. Far 52.232-7, Payments Under Time-And-Materials And Labor-Hour Contracts (Dec 2002) 6. Far 52.232-19, Availability Of Funds For The Next Fiscal Year (Apr 1984) 7. Far 52.232-22, Limitation Of Funds (Apr 1984) 8. Subcontracting With Firms That Are Owned Or Controlled By The Government Of A Terrorist Country (See Full Text In The Bom/Sow In Itss) 9. Organizational Conflict Of Interest (See Full Text In The Bom/Sow In Itss) 10. Rights In Noncommercial Computer Software And Noncommercial Computer Software Documentation (See Full Text In The Bom/Sow In Itss) Iaw Far 52.232-7, The Government Will Withhold 5% Of The Amount Of Each Invoice Under The Labor Clin, Up To A Maximum Of $50,000. Once The Withhold Balance Equals $50,000, No Additional Dollars Will Be Withheld Under This Task Order. Upon Contractor Submission Of, And Government Acceptance Of The Final Invoice, The Contractor Will Be Paid The Withhold Balance. Contractor Is Not Authorized To Bill For Any Labor Categories Not Listed In Page 2 Of This Task Order Without Written Approval Of The Contracting Officer. Application Of General & Administrative Or Other Indirect Costs To Any Direct Costs Is Not Allowed. Note: This Task Order Is Incrementally Funded Per Far 52.232-22 Limitation Of Funds (Apr 1984). Performance Under This Task Order Ends On 14 Oct 2005. No Payment For Services Beyond That Date Will Be Made Unless Authorized By Written Modification To This Order. If The Funding Is Not Sufficient For Performance To Go Through 14 Oct 2005, Performance Must Stop. No Payments Will Be Made For Work Accomplished Beyond The Funded Amount Without Being Authorized By Written Modification To This Order. Item No. (A) Supplies Or Services (B) Quantity Ordered (C) Unit (D) Unit Price (E) Amount (F) Provide Advanced Data Visualization, Dissemination And Integration Solutions Support To The Ftttf (Dvd). See Page 2 For A Detailed List Of Clins (Located In The Bom/Sow In Itss) Ceiling Amount Is $3,296,404.80
- 18 Jan 2007
- This Is A Time And Materials Task Order Awarded Against Bpa #Gs10t05eca4508. Task Order Id: A4s15b0347a Funding Document A4i406293 Applies To This Task Order. In Addition To The Clauses In The Fss Schedule, The Following Clauses Apply To This Task Order: 1. Far 52.204-2, Security Requirements (Aug 1996) 2. Far 52.217-8, Option To Extend Services (Nov 1999) 3. Far 52.217-9, Option To Extend The Term Of A Contract (Mar 2000) 4. Far 52.227-14, Rights In Data - General (Jun 1987) 5. Far 52.232-7, Payments Under Time-And-Materials And Labor-Hour Contracts (Dec 2002) 6. Far 52.232-19, Availability Of Funds For The Next Fiscal Year (Apr 1984) 7. Far 52.232-22, Limitation Of Funds (Apr 1984) 8. Subcontracting With Firms That Are Owned Or Controlled By The Government Of A Terrorist Country (See Full Text In The Bom/Sow In Itss) 9. Organizational Conflict Of Interest (See Full Text In The Bom/Sow In Itss) 10. Rights In Noncommercial Computer Software And Noncommercial Computer Software Documentation (See Full Text In The Bom/Sow In Itss) Iaw Far 52.232-7, The Government Will Withhold 5% Of The Amount Of Each Invoice Under The Labor Clin, Up To A Maximum Of $50,000. Once The Withhold Balance Equals $50,000, No Additional Dollars Will Be Withheld Under This Task Order. Upon Contractor Submission Of, And Government Acceptance Of The Final Invoice, The Contractor Will Be Paid The Withhold Balance. Contractor Is Not Authorized To Bill For Any Labor Categories Not Listed In Page 2 Of This Task Order Without Written Approval Of The Contracting Officer. Application Of General & Administrative Or Other Indirect Costs To Any Direct Costs Is Not Allowed. Note: This Task Order Is Incrementally Funded Per Far 52.232-22 Limitation Of Funds (Apr 1984). Performance Under This Task Order Ends On 14 Oct 2005. No Payment For Services Beyond That Date Will Be Made Unless Authorized By Written Modification To This Order. If The Funding Is Not Sufficient For Performance To Go Through 14 Oct 2005, Performance Must Stop. No Payments Will Be Made For Work Accomplished Beyond The Funded Amount Without Being Authorized By Written Modification To This Order. Item No. (A) Supplies Or Services (B) Quantity Ordered (C) Unit (D) Unit Price (E) Amount (F) Provide Advanced Data Visualization, Dissemination And Integration Solutions Support To The Ftttf (Dvd). See Page 2 For A Detailed List Of Clins (Located In The Bom/Sow In Itss) Ceiling Amount Is $3,296,404.80
- Gsa/Fts Contracting Staff
- General Services Administration (Gsa)
- $12,194,761.44
- General Services Administration (Gsa)
- GST1004EC347A
- This Is A Time And Materials Task Order Awarded Against Bpa #Gs10t05eca4508. Task Order Id: A4s15b0347a Funding Document A4i406293 Applies To This Task Order. In Addition To The Clauses In The Fss Schedule, The Following Clauses Apply To This Task Order: 1. Far 52.204-2, Security Requirements (Aug 1996) 2. Far 52.217-8, Option To Extend Services (Nov 1999) 3. Far 52.217-9, Option To Extend The Term Of A Contract (Mar 2000) 4. Far 52.227-14, Rights In Data - General (Jun 1987) 5. Far 52.232-7, Payments Under Time-And-Materials And Labor-Hour Contracts (Dec 2002) 6. Far 52.232-19, Availability Of Funds For The Next Fiscal Year (Apr 1984) 7. Far 52.232-22, Limitation Of Funds (Apr 1984) 8. Subcontracting With Firms That Are Owned Or Controlled By The Government Of A Terrorist Country (See Full Text In The Bom/Sow In Itss) 9. Organizational Conflict Of Interest (See Full Text In The Bom/Sow In Itss) 10. Rights In Noncommercial Computer Software And Noncommercial Computer Software Documentation (See Full Text In The Bom/Sow In Itss) Iaw Far 52.232-7, The Government Will Withhold 5% Of The Amount Of Each Invoice Under The Labor Clin, Up To A Maximum Of $50,000. Once The Withhold Balance Equals $50,000, No Additional Dollars Will Be Withheld Under This Task Order. Upon Contractor Submission Of, And Government Acceptance Of The Final Invoice, The Contractor Will Be Paid The Withhold Balance. Contractor Is Not Authorized To Bill For Any Labor Categories Not Listed In Page 2 Of This Task Order Without Written Approval Of The Contracting Officer. Application Of General & Administrative Or Other Indirect Costs To Any Direct Costs Is Not Allowed. Note: This Task Order Is Incrementally Funded Per Far 52.232-22 Limitation Of Funds (Apr 1984). Performance Under This Task Order Ends On 14 Oct 2005. No Payment For Services Beyond That Date Will Be Made Unless Authorized By Written Modification To This Order. If The Funding Is Not Sufficient For Performance To Go Through 14 Oct 2005, Performance Must Stop. No Payments Will Be Made For Work Accomplished Beyond The Funded Amount Without Being Authorized By Written Modification To This Order. Item No. (A) Supplies Or Services (B) Quantity Ordered (C) Unit (D) Unit Price (E) Amount (F) Provide Advanced Data Visualization, Dissemination And Integration Solutions Support To The Ftttf (Dvd). See Page 2 For A Detailed List Of Clins (Located In The Bom/Sow In Itss) Ceiling Amount Is $3,296,404.80
- 2 Mar 2005
- This Is A Time And Materials Task Order Awarded Against Bpa #Gs10t05eca4508. Task Order Id: A4s15b0347a Funding Document A4i406293 Applies To This Task Order. In Addition To The Clauses In The Fss Schedule, The Following Clauses Apply To This Task Order: 1. Far 52.204-2, Security Requirements (Aug 1996) 2. Far 52.217-8, Option To Extend Services (Nov 1999) 3. Far 52.217-9, Option To Extend The Term Of A Contract (Mar 2000) 4. Far 52.227-14, Rights In Data - General (Jun 1987) 5. Far 52.232-7, Payments Under Time-And-Materials And Labor-Hour Contracts (Dec 2002) 6. Far 52.232-19, Availability Of Funds For The Next Fiscal Year (Apr 1984) 7. Far 52.232-22, Limitation Of Funds (Apr 1984) 8. Subcontracting With Firms That Are Owned Or Controlled By The Government Of A Terrorist Country (See Full Text In The Bom/Sow In Itss) 9. Organizational Conflict Of Interest (See Full Text In The Bom/Sow In Itss) 10. Rights In Noncommercial Computer Software And Noncommercial Computer Software Documentation (See Full Text In The Bom/Sow In Itss) Iaw Far 52.232-7, The Government Will Withhold 5% Of The Amount Of Each Invoice Under The Labor Clin, Up To A Maximum Of $50,000. Once The Withhold Balance Equals $50,000, No Additional Dollars Will Be Withheld Under This Task Order. Upon Contractor Submission Of, And Government Acceptance Of The Final Invoice, The Contractor Will Be Paid The Withhold Balance. Contractor Is Not Authorized To Bill For Any Labor Categories Not Listed In Page 2 Of This Task Order Without Written Approval Of The Contracting Officer. Application Of General & Administrative Or Other Indirect Costs To Any Direct Costs Is Not Allowed. Note: This Task Order Is Incrementally Funded Per Far 52.232-22 Limitation Of Funds (Apr 1984). Performance Under This Task Order Ends On 14 Oct 2005. No Payment For Services Beyond That Date Will Be Made Unless Authorized By Written Modification To This Order. If The Funding Is Not Sufficient For Performance To Go Through 14 Oct 2005, Performance Must Stop. No Payments Will Be Made For Work Accomplished Beyond The Funded Amount Without Being Authorized By Written Modification To This Order. Item No. (A) Supplies Or Services (B) Quantity Ordered (C) Unit (D) Unit Price (E) Amount (F) Provide Advanced Data Visualization, Dissemination And Integration Solutions Support To The Ftttf (Dvd). See Page 2 For A Detailed List Of Clins (Located In The Bom/Sow In Itss) Ceiling Amount Is $3,296,404.80
- Gsa/Fts Contracting Staff
- General Services Administration (Gsa)
- $12,194,761.44
- General Services Administration (Gsa)
- GST1005EC1136
- The Contractor Will Provide Data Exploitation And Systems Support To The Ftttf's Threat Processing And Technical Operations. This Initiative Involves Providing Expertise In Massive Data Analysis (Query Tools, Link Tools, And Visualization), Data Exploitation (E.G. Data Hygiene, Data Mining, Multi-Terabytes), And Data Relationship Matching Analysis. Systems Support Includes Requirements Analysis, Design, Tool Evaluation, And User Testing.
- 28 Aug 2007
- The Contractor Will Provide Data Exploitation And Systems Support To The Ftttf's Threat Processing And Technical Operations. This Initiative Involves Providing Expertise In Massive Data Analysis (Query Tools, Link Tools, And Visualization), Data Exploitation (E.G. Data Hygiene, Data Mining, Multi-Terabytes), And Data Relationship Matching Analysis. Systems Support Includes Requirements Analysis, Design, Tool Evaluation, And User Testing.
- Gsa/Fts Contracting Staff
- General Services Administration (Gsa)
- $21,869,123.46
- General Services Administration (Gsa)
- DJFA9G905190
- Administrative Support
- 8 Apr 2009
- Administrative Support
- Dept Of Just/Federal Bureau Of Investigation
- Department Of Justice (Doj)
- $6,711,974.00
- Department Of Justice (Doj)
- DJF141200G0006818
- Igf::Ot::Igf-Services
- 12 Jan 2016
- Igf::Ot::Igf-Services
- Dept Of Just/Federal Bureau Of Investigation
- Department Of Justice (Doj)
- $134,464.44
- Department Of Justice (Doj)