Femco, Inc.
CAGE Code: 1PV15
NCAGE Code: 1PV15
Status: Discontinued
Type: Commercial Supplier
Dun & Bradstreet (DUNS): 048305846
Summary
Femco, Inc. is a Discontinued Commercial Supplier with the Cage Code 1PV15 and is tracked by Dun & Bradstreet under DUNS Number 048305846..
Address
814 W Diamond Ave Ste 130
Gaithersburg MD 20878-1416
United States
Points of Contact
Related Information
People who viewed this 'CAGE Code' also viewed...
Hypertek Inc Global Satcom Technology Inc Zigler Ari Mainstreet 407 Glazing Llc Jadco Engineering Inc Trevigen, Inc. Row, Klon O Inc Electra Executive Enterprise Inc Roberts Oxygen Co Blackwell Physicians, Llc Peak Technology Cellpoint Scientific, Inc. Dataport Inc Bpt Manufacturing Corporation Skytek Corp Custom Electronics Co Inc Oncor Inc Rockville Office Machines Inc. Orient Express Delivery Service Inc Biomedical Research And Development
Frequently Asked Questions (FAQ) for CAGE 1PV15
- What is CAGE Code 1PV15?
- 1PV15 is the unique identifier used by NATO Organizations to reference the physical entity known as Femco, Inc. located at 814 W Diamond Ave Ste 130, Gaithersburg MD 20878-1416, United States.
- Who is CAGE Code 1PV15?
- 1PV15 refers to Femco, Inc. located at 814 W Diamond Ave Ste 130, Gaithersburg MD 20878-1416, United States.
- Where is CAGE Code 1PV15 Located?
- CAGE Code 1PV15 is located in Gaithersburg, MD, USA.
Contracting History for CAGE 1PV15 Most Recent 25 Records
- HHSN29200034
- Igf::Ot::Igf("Other Functions") - C101286; Design/Build Services To Replace Hvac Duct And Reheat Coils, Bldg. 14D; Chuck Kirby Mod 0013 - Design/Build Services To Replace Hvac Duct And Reheat Coils. See Attached Sow. 1. Provide And Install Additional Infill From Concrete Curb Demolition By Lsp. 2. Replace/Repair Office Area Controls With Ddc. 3. Repair Reinsulate Leaking Steam Piping In Corridor. 4. Repair 1 Sink Animal Holding Room D313. 5. Remove Steel Piping That Conflicts With New Work In Mr (Clean Up). 6. Remove And Replace Animal Cage Trough In 3 Holding Rooms To Facilitate Flooring Installation. Deliver To: Nih Campus, Bldg. 14D Product Service Code: Y1jz Product/Service Description: Construction Of Miscellaneous Buildings Can # 8028435, Orf Tas::75 7/1 0838::Tas 08023820175Db0 Duns # 048305846 Pop: Task : 08/21/2017 - 01/31/2018 Order : 09/11/2014 - 09/30/2018 Far 52.211-10 - Commencement, Prosecution, And Completion Of Work (Apr1984) The Contractor Shall Be Required To (A) Commence Work Under This Contract Within 5 (Five) Calendar Days After The Date The Contractor Receives The Notice To Proceed, (B) Prosecute The Work Diligently, And (C) Complete The Entire Work Ready For Use Not Later Than January 31, 2017. * The Time Stated For Completion Shall Include 10 Days For Mobilization And Final Cleanup Of The Premises. (End Of Clause) All Other Terms&Conditions Remain In Effect.
- 17 Aug 2017
- Igf::Ot::Igf("Other Functions") - C101286; Design/Build Services To Replace Hvac Duct And Reheat Coils, Bldg. 14D; Chuck Kirby Mod 0013 - Design/Build Services To Replace Hvac Duct And Reheat Coils. See Attached Sow. 1. Provide And Install Additional Infill From Concrete Curb Demolition By Lsp. 2. Replace/Repair Office Area Controls With Ddc. 3. Repair Reinsulate Leaking Steam Piping In Corridor. 4. Repair 1 Sink Animal Holding Room D313. 5. Remove Steel Piping That Conflicts With New Work In Mr (Clean Up). 6. Remove And Replace Animal Cage Trough In 3 Holding Rooms To Facilitate Flooring Installation. Deliver To: Nih Campus, Bldg. 14D Product Service Code: Y1jz Product/Service Description: Construction Of Miscellaneous Buildings Can # 8028435, Orf Tas::75 7/1 0838::Tas 08023820175Db0 Duns # 048305846 Pop: Task : 08/21/2017 - 01/31/2018 Order : 09/11/2014 - 09/30/2018 Far 52.211-10 - Commencement, Prosecution, And Completion Of Work (Apr1984) The Contractor Shall Be Required To (A) Commence Work Under This Contract Within 5 (Five) Calendar Days After The Date The Contractor Receives The Notice To Proceed, (B) Prosecute The Work Diligently, And (C) Complete The Entire Work Ready For Use Not Later Than January 31, 2017. * The Time Stated For Completion Shall Include 10 Days For Mobilization And Final Cleanup Of The Premises. (End Of Clause) All Other Terms&Conditions Remain In Effect.
- Nih A E Construction
- Department Of Health And Human Services (Hhs)
- $4,385,248.51
- Department Of Health And Human Services (Hhs)
- HHSN29200034
- Igf::Ot::Igf("Other Functions") - C101286; Design/Build Services To Replace Hvac Duct And Reheat Coils, Bldg. 14D; Chuck Kirby Mod 0015 - Design/Build Services To Replace Hvac Duct And Reheat Coils. See Attached Sow. 1. Prepare And Paint All Walls And Ceilings In The Corridors And Holding Rooms Where Abandoned Bas Controls Where Removed In Phase C. 2. Seal And Caulk All Holding Rooms And Corridors For Pest Exclusion (Dohs Inspections). 3. Demolish Existing Normal Power Conduit/Cloth Wiring/Boxes And Replace With New In The Corridors. (Elec) 4. Demolish Existing Emergency Power Wiring (Mc Cable) In The Corridor And Replace With New Conduit Wiring. (Elec) 5. Supply And Install Eleven (11) New Fire Alarm Speaker (Elec) Strobes In The Corridors As Per Dfm Candela Requirements. (Elec) 6. Demolish Existing Analog Room Gauges On All Rooms In Phase C. (Bas) 7. Demolish Existing Abandoned Jc Controls; Sensors, Poly Tubing And Copper Tubing. (Bas) 8. Install 1 Water Proof Lighting Control Box. (Bas) 9. Install 1 New Enclosure For Light Relay (Reuse Existing Relay). (Bas) 10. Relocate Three (3) Lighting Control Boxes. (Bas) 11. Provide And Install (13) New Temperature Sensors And Relocate From Duct Mounted To Inside Room Location. (Bas) 12. Provide And Install New Poly Tubing To All Controllers And Probes. (Bas). 13. Remove The Sprinkler Piping Installation From All Phases. 44 Days Extension To Period Of Performance Was Accepted. Pop: Task - 06/28/2018 - 12/31/2018 Order - 09/11/2014 - 12/31/2018 Pricing: $107,409.16 Credig: $ 80,920.64 Total: $ 26,488.52 Deliver To: Nih Campus, Bldg. 14D Product Service Code: Y1jz Product/Service Description: Construction Of Miscellaneous Buildings Can # 8032185, Orf Tas::75 8/2 0838::Tas 08023820185Db0 Duns # 048305846 Far 52.211-10 - Commencement, Prosecution, And Completion Of Work (Apr1984) The Contractor Shall Be Required To (A) Commence Work Under This Contract Within 5 (Five) Calendar Days After The Date The Contractor Receives The Notice To Proceed, (B) Prosecute The Work Diligently, And (C) Complete The Entire Work Ready For Use Not Later Than December 31, 2018. * The Time Stated For Completion Shall Include 10 Days For Mobilization And Final Cleanup Of The Premises. (End Of Clause) All Other Terms&Conditions Remain In Effect.
- 27 Jun 2018
- Igf::Ot::Igf("Other Functions") - C101286; Design/Build Services To Replace Hvac Duct And Reheat Coils, Bldg. 14D; Chuck Kirby Mod 0015 - Design/Build Services To Replace Hvac Duct And Reheat Coils. See Attached Sow. 1. Prepare And Paint All Walls And Ceilings In The Corridors And Holding Rooms Where Abandoned Bas Controls Where Removed In Phase C. 2. Seal And Caulk All Holding Rooms And Corridors For Pest Exclusion (Dohs Inspections). 3. Demolish Existing Normal Power Conduit/Cloth Wiring/Boxes And Replace With New In The Corridors. (Elec) 4. Demolish Existing Emergency Power Wiring (Mc Cable) In The Corridor And Replace With New Conduit Wiring. (Elec) 5. Supply And Install Eleven (11) New Fire Alarm Speaker (Elec) Strobes In The Corridors As Per Dfm Candela Requirements. (Elec) 6. Demolish Existing Analog Room Gauges On All Rooms In Phase C. (Bas) 7. Demolish Existing Abandoned Jc Controls; Sensors, Poly Tubing And Copper Tubing. (Bas) 8. Install 1 Water Proof Lighting Control Box. (Bas) 9. Install 1 New Enclosure For Light Relay (Reuse Existing Relay). (Bas) 10. Relocate Three (3) Lighting Control Boxes. (Bas) 11. Provide And Install (13) New Temperature Sensors And Relocate From Duct Mounted To Inside Room Location. (Bas) 12. Provide And Install New Poly Tubing To All Controllers And Probes. (Bas). 13. Remove The Sprinkler Piping Installation From All Phases. 44 Days Extension To Period Of Performance Was Accepted. Pop: Task - 06/28/2018 - 12/31/2018 Order - 09/11/2014 - 12/31/2018 Pricing: $107,409.16 Credig: $ 80,920.64 Total: $ 26,488.52 Deliver To: Nih Campus, Bldg. 14D Product Service Code: Y1jz Product/Service Description: Construction Of Miscellaneous Buildings Can # 8032185, Orf Tas::75 8/2 0838::Tas 08023820185Db0 Duns # 048305846 Far 52.211-10 - Commencement, Prosecution, And Completion Of Work (Apr1984) The Contractor Shall Be Required To (A) Commence Work Under This Contract Within 5 (Five) Calendar Days After The Date The Contractor Receives The Notice To Proceed, (B) Prosecute The Work Diligently, And (C) Complete The Entire Work Ready For Use Not Later Than December 31, 2018. * The Time Stated For Completion Shall Include 10 Days For Mobilization And Final Cleanup Of The Premises. (End Of Clause) All Other Terms&Conditions Remain In Effect.
- Nih A E Construction
- Department Of Health And Human Services (Hhs)
- $4,385,248.51
- Department Of Health And Human Services (Hhs)
- HHSN29200034
- Igf::Ot::Igf("Other Functions") - Hhsn292200900013i - Hhsn29200034 - C101286; Design/Build Services To Replace Hvac Duct And Reheat Coils - Unforeseen Asbestos (Acm) Removal For Offices, Restrooms And Entrance Vestibule. See Attached Sow; Chuck Kirby Mod 0009 - Design/Build Services To Replace Hvac Duct And Reheat Coils - Unforeseen Asbestos (Acm) Removal For Offices, Restrooms And Entrance Vestibule. See Attached Sow. 1. Remove Acm (Pipe And Duct Insulation) Above The Ceiling In The North Dvr Offices. This Removal Should Be Limited To The Effected Reheat Coils Ducts And Associated Piping And Controls. Drywall And Plaster Ceilings Removal/Replacement And Temporary Barriers Will Be Required. 2. After Hours Work Will Be Required Due To The Affected Area Being Utilized By Animal Program Staff. 3. Install Temporary Steam Piping To Serve Coils In Office Area. 4. Remove, Store And Reinstall All Lighting In The North Offices, Restrooms And Corridor To Support The Acm Removal. Deliver To: Nih Campus, Bldg. 14D Product Service Code: Y1jz Product/Service Description: Construction Of Miscellaneous Buildings Can # 8028151, Orf Tas::75 7/1 0838::Tas 08023820175Db0 Duns # 048305846 Pop: Task 02/13/2017 - 05/13/2017 Order 09/11/2014 - 03/31/2018 All Other Terms&Conditions Remain In Effect.
- 7 Feb 2017
- Igf::Ot::Igf("Other Functions") - Hhsn292200900013i - Hhsn29200034 - C101286; Design/Build Services To Replace Hvac Duct And Reheat Coils - Unforeseen Asbestos (Acm) Removal For Offices, Restrooms And Entrance Vestibule. See Attached Sow; Chuck Kirby Mod 0009 - Design/Build Services To Replace Hvac Duct And Reheat Coils - Unforeseen Asbestos (Acm) Removal For Offices, Restrooms And Entrance Vestibule. See Attached Sow. 1. Remove Acm (Pipe And Duct Insulation) Above The Ceiling In The North Dvr Offices. This Removal Should Be Limited To The Effected Reheat Coils Ducts And Associated Piping And Controls. Drywall And Plaster Ceilings Removal/Replacement And Temporary Barriers Will Be Required. 2. After Hours Work Will Be Required Due To The Affected Area Being Utilized By Animal Program Staff. 3. Install Temporary Steam Piping To Serve Coils In Office Area. 4. Remove, Store And Reinstall All Lighting In The North Offices, Restrooms And Corridor To Support The Acm Removal. Deliver To: Nih Campus, Bldg. 14D Product Service Code: Y1jz Product/Service Description: Construction Of Miscellaneous Buildings Can # 8028151, Orf Tas::75 7/1 0838::Tas 08023820175Db0 Duns # 048305846 Pop: Task 02/13/2017 - 05/13/2017 Order 09/11/2014 - 03/31/2018 All Other Terms&Conditions Remain In Effect.
- Nih A E Construction
- Department Of Health And Human Services (Hhs)
- $4,385,248.51
- Department Of Health And Human Services (Hhs)
- HHSN29200034
- Igf::Ot::Igf("Other Functions") - C101286; Design/Build Services To Replace Hvac Duct And Reheat Coils - Electrical Changes, Bldg. 14D; Chuck Kirby Mod 0012 - Design/Build Services To Replace Hvac Duct And Reheat Coils - Replace/Repair Architectural Finishes. See Attached Sow. 1. Remove And Replace Epoxy Floors Throughout Phase B. This Area Will Require A Moisture Barrier Before Installation Of The New Material. New Material Should Be Installed Flush To All Floor Drains And Trenches. 2. Apply Caulking To All Areas Within The Occupied Spaces For Pest Exclusion As Required By Dohs. 3. Change Crash Rail Heights To 44" Aff Throughout The Area And Patch Holes Form Relocation. 4. Remove White Boards And Clip Board Holders That Conflict With Sani-Rail Relocations Throughout The Phase. 5. Apply Water Based Epoxy Paint Throughout The Corridors. This Includes The Areas From The Crash Rail Relocations. Touch Up All Rooms As Required. 6. Remove The Concrete Floor Curbing Throughout The Area. 7. Remove White Boards And Files Holders That Are In Conflict With The Crash Rail Relocations. Reinstall The Aluminum File Holders After Crash Rail Relocations Are Completed. 8. Rms D205, D207, D209, D210 - Remove Existing Torque Timer Lighting Controls. Install And Connect Automated Lighting Controls With Photocells To The Existing Bas. Install Twist Timers And Connect To Lighting Circuit (Lights Will Be Programmed All Off Or All On). These Rooms Currently Have 3 Lighting Circuits Per Room. Trace The Lighting Circuits In These Rooms To Determine What Circuits Are Required (Possible 3Rd Circuits In These Rooms). 9. Remove Abandoned Room Controllers In Corridors. This Includes All Pneumatic Tubing, Temp Sensors And Mounting Plagues. 10. Relocate All Duct Temperature Sensors Into The Rooms And Connect To The Existing Bas. 11. Replace All Environmental Sensors/Devices With New Devices - 29 Total. 12. Remove And Replace All Animal Drinking Water Piping Within The 13 Holding Rooms. Install New Quick Connect Cage Fittings. 13. Provide And Temporary Electrical Connection For Flooring Work. Deliver To: Nih Campus, Bldg. 14D Product Service Code: Y1jz Product/Service Description: Construction Of Miscellaneous Buildings Can # 8028435, Orf Tas::75 7/1 0838::Tas 08023820175Db0 Duns # 048305846 Pop: Task : 04/28/2017 - 12/30/2017 Order : 09/11/2014 - 08/31/2018 Far 52.211-10 - Commencement, Prosecution, And Completion Of Work (Apr1984) The Contractor Shall Be Required To (A) Commence Work Under This Contract Within 5 (Five) Calendar Days After The Date The Contractor Receives The Notice To Proceed, (B) Prosecute The Work Diligently, And (C) Complete The Entire Work Ready For Use Not Later Than December 30, 2017. * The Time Stated For Completion Shall Include 10 Days For Mobilization And Final Cleanup Of The Premises. (End Of Clause) All Other Terms&Conditions Remain In Effect.
- 25 Apr 2017
- Igf::Ot::Igf("Other Functions") - C101286; Design/Build Services To Replace Hvac Duct And Reheat Coils - Electrical Changes, Bldg. 14D; Chuck Kirby Mod 0012 - Design/Build Services To Replace Hvac Duct And Reheat Coils - Replace/Repair Architectural Finishes. See Attached Sow. 1. Remove And Replace Epoxy Floors Throughout Phase B. This Area Will Require A Moisture Barrier Before Installation Of The New Material. New Material Should Be Installed Flush To All Floor Drains And Trenches. 2. Apply Caulking To All Areas Within The Occupied Spaces For Pest Exclusion As Required By Dohs. 3. Change Crash Rail Heights To 44" Aff Throughout The Area And Patch Holes Form Relocation. 4. Remove White Boards And Clip Board Holders That Conflict With Sani-Rail Relocations Throughout The Phase. 5. Apply Water Based Epoxy Paint Throughout The Corridors. This Includes The Areas From The Crash Rail Relocations. Touch Up All Rooms As Required. 6. Remove The Concrete Floor Curbing Throughout The Area. 7. Remove White Boards And Files Holders That Are In Conflict With The Crash Rail Relocations. Reinstall The Aluminum File Holders After Crash Rail Relocations Are Completed. 8. Rms D205, D207, D209, D210 - Remove Existing Torque Timer Lighting Controls. Install And Connect Automated Lighting Controls With Photocells To The Existing Bas. Install Twist Timers And Connect To Lighting Circuit (Lights Will Be Programmed All Off Or All On). These Rooms Currently Have 3 Lighting Circuits Per Room. Trace The Lighting Circuits In These Rooms To Determine What Circuits Are Required (Possible 3Rd Circuits In These Rooms). 9. Remove Abandoned Room Controllers In Corridors. This Includes All Pneumatic Tubing, Temp Sensors And Mounting Plagues. 10. Relocate All Duct Temperature Sensors Into The Rooms And Connect To The Existing Bas. 11. Replace All Environmental Sensors/Devices With New Devices - 29 Total. 12. Remove And Replace All Animal Drinking Water Piping Within The 13 Holding Rooms. Install New Quick Connect Cage Fittings. 13. Provide And Temporary Electrical Connection For Flooring Work. Deliver To: Nih Campus, Bldg. 14D Product Service Code: Y1jz Product/Service Description: Construction Of Miscellaneous Buildings Can # 8028435, Orf Tas::75 7/1 0838::Tas 08023820175Db0 Duns # 048305846 Pop: Task : 04/28/2017 - 12/30/2017 Order : 09/11/2014 - 08/31/2018 Far 52.211-10 - Commencement, Prosecution, And Completion Of Work (Apr1984) The Contractor Shall Be Required To (A) Commence Work Under This Contract Within 5 (Five) Calendar Days After The Date The Contractor Receives The Notice To Proceed, (B) Prosecute The Work Diligently, And (C) Complete The Entire Work Ready For Use Not Later Than December 30, 2017. * The Time Stated For Completion Shall Include 10 Days For Mobilization And Final Cleanup Of The Premises. (End Of Clause) All Other Terms&Conditions Remain In Effect.
- Nih A E Construction
- Department Of Health And Human Services (Hhs)
- $4,385,248.51
- Department Of Health And Human Services (Hhs)
- HHSN29200034
- Igf::Ot::Igf("Other Functions") - Hhsn292200900013i - Hhsn29200034 - C101286; Design/Build Services To Replace Hvac Duct And Reheat Coils - Electrical Changes, Bldg. 14D; Chuck Kirby Mod 0011 - Design/Build Services To Replace Hvac Duct And Reheat Coils - Electrical Changes. See Attached Sow. 1. Demolish All Existing Lighting Large Junction Boxes And Wiring And Install New Boxes And Wiring To Correct Code Size And Color. 2. Support All Electrical And Fire Alarm Conduit That Was Previously Mounted To The Drywall Ceiling. Demo All Abandoned Conduit. 3. Rework 15 Fire Alarm Devices Wire/Conduit Between The Corridor And The Holding Rooms To Achieve Correct Mounting Location For The New Drop Ceilings. 4. Replace Existing Fire Alarm Devices (15) With Dfm Approved 75 Cd Strobes. Install New Boxes New Boxes That Can Be Surface Mounted To New Drop Ceiling. Deliver To: Nih Campus, Bldg. 14D Product Service Code: Y1jz Product/Service Description: Construction Of Miscellaneous Buildings Can # 8018759, Niaid Tas::75 7 0885::Tas 08028520171Da0 Duns # 048305846 Pop: Task : 03/16/2017 - 04/03/2017 Order : 09/11/2014 - 03/31/2018 Far 52.211-10 - Commencement, Prosecution, And Completion Of Work (Apr1984) The Contractor Shall Be Required To (A) Commence Work Under This Contract Within 5 (Five) Calendar Days After The Date The Contractor Receives The Notice To Proceed, (B) Prosecute The Work Diligently, And (C) Complete The Entire Work Ready For Use Not Later Than April 03, 2017. * The Time Stated For Completion Shall Include 10 Days For Mobilization And Final Cleanup Of The Premises. (End Of Clause) All Other Terms&Conditions Remain In Effect.
- 14 Mar 2017
- Igf::Ot::Igf("Other Functions") - Hhsn292200900013i - Hhsn29200034 - C101286; Design/Build Services To Replace Hvac Duct And Reheat Coils - Electrical Changes, Bldg. 14D; Chuck Kirby Mod 0011 - Design/Build Services To Replace Hvac Duct And Reheat Coils - Electrical Changes. See Attached Sow. 1. Demolish All Existing Lighting Large Junction Boxes And Wiring And Install New Boxes And Wiring To Correct Code Size And Color. 2. Support All Electrical And Fire Alarm Conduit That Was Previously Mounted To The Drywall Ceiling. Demo All Abandoned Conduit. 3. Rework 15 Fire Alarm Devices Wire/Conduit Between The Corridor And The Holding Rooms To Achieve Correct Mounting Location For The New Drop Ceilings. 4. Replace Existing Fire Alarm Devices (15) With Dfm Approved 75 Cd Strobes. Install New Boxes New Boxes That Can Be Surface Mounted To New Drop Ceiling. Deliver To: Nih Campus, Bldg. 14D Product Service Code: Y1jz Product/Service Description: Construction Of Miscellaneous Buildings Can # 8018759, Niaid Tas::75 7 0885::Tas 08028520171Da0 Duns # 048305846 Pop: Task : 03/16/2017 - 04/03/2017 Order : 09/11/2014 - 03/31/2018 Far 52.211-10 - Commencement, Prosecution, And Completion Of Work (Apr1984) The Contractor Shall Be Required To (A) Commence Work Under This Contract Within 5 (Five) Calendar Days After The Date The Contractor Receives The Notice To Proceed, (B) Prosecute The Work Diligently, And (C) Complete The Entire Work Ready For Use Not Later Than April 03, 2017. * The Time Stated For Completion Shall Include 10 Days For Mobilization And Final Cleanup Of The Premises. (End Of Clause) All Other Terms&Conditions Remain In Effect.
- Nih A E Construction
- Department Of Health And Human Services (Hhs)
- $4,385,248.51
- Department Of Health And Human Services (Hhs)
- HHSN29200034
- Igf::Ot::Igf("Other Functions") - Hhsn292200900013i - Hhsn29200034 - C101286; Design/Build Services To Replace Hvac Duct And Reheat Coils - Bas Control Work. See Attached Sow; Chuck Kirby Mod 0010 - Design/Build Services To Replace Hvac Duct And Reheat Coils - Bas Control Work. See Attached Sow. 1. Install 10 Bas Controllers And Air Flow Monitors Associated With The Rooms/Reheats Valves. 2. Remove/Replace Abandoned Control Poly Tubing. 3. Cut, Patch And Paint Holes In Existing Cmu Walls For Control Work. 4. Remove, Store And Replace The Lighting Control Sensors Associated With The Ceiling Removal In 8 Holding Rooms. Deliver To: Nih Campus, Bldg. 14D Product Service Code: Z2jz Product/Service Description: Repair Or Alteration Of Miscellaneous Buildings Can # 8028435, Orf Tas::75 7/1 0838::Tas 08023820175Db0 Duns # 048305846 Pop: Task 03/01/2017 - 05/13/2017 Order 09/11/2014 - 03/31/2018 All Other Terms&Conditions Remain In Effect.
- 27 Feb 2017
- Igf::Ot::Igf("Other Functions") - Hhsn292200900013i - Hhsn29200034 - C101286; Design/Build Services To Replace Hvac Duct And Reheat Coils - Bas Control Work. See Attached Sow; Chuck Kirby Mod 0010 - Design/Build Services To Replace Hvac Duct And Reheat Coils - Bas Control Work. See Attached Sow. 1. Install 10 Bas Controllers And Air Flow Monitors Associated With The Rooms/Reheats Valves. 2. Remove/Replace Abandoned Control Poly Tubing. 3. Cut, Patch And Paint Holes In Existing Cmu Walls For Control Work. 4. Remove, Store And Replace The Lighting Control Sensors Associated With The Ceiling Removal In 8 Holding Rooms. Deliver To: Nih Campus, Bldg. 14D Product Service Code: Z2jz Product/Service Description: Repair Or Alteration Of Miscellaneous Buildings Can # 8028435, Orf Tas::75 7/1 0838::Tas 08023820175Db0 Duns # 048305846 Pop: Task 03/01/2017 - 05/13/2017 Order 09/11/2014 - 03/31/2018 All Other Terms&Conditions Remain In Effect.
- Nih A E Construction
- Department Of Health And Human Services (Hhs)
- $4,385,248.51
- Department Of Health And Human Services (Hhs)
- HHSN292200900013I
- Other Functions -- Multiple Award (Small Mac) Indefinite Delivery/Indefinite Quantity (Idiq) Task Order Contract (Toc) For Construction, Alteration&Rehabilitation Of Various Nih Facilities Ranging From $500K To $3 Million
- 12 Dec 2017
- Other Functions -- Multiple Award (Small Mac) Indefinite Delivery/Indefinite Quantity (Idiq) Task Order Contract (Toc) For Construction, Alteration&Rehabilitation Of Various Nih Facilities Ranging From $500K To $3 Million
- Nih A E Construction
- Department Of Health And Human Services (Hhs)
- $0.00
- Department Of Health And Human Services (Hhs)
- HHSN29200034
- Igf::Ot::Igf("Other Functions") - C101286; Design/Build Services To Replace Hvac Duct And Reheat Coils, Bldg. 14D; Chuck Kirby Mod 0014 - Design/Build Services To Replace Hvac Duct And Reheat Coils. See Attached Sow. 1. Provide And Install Additional Epoxy Infill In Rms D200, D205, D209. This Is For The Removal Of Existing Infill That Has To Be Removed To Install The Moisture Barrier. 2. Perform/Record Testing And Balancing Readings For Ef#1 And Ef#2. 3. Provide And Install (2) Motors With Grounding Rings And Connect To Newly Installed Vfds. The Motors Should Be Compatible To The Vfds. 22 Days Extension To Period Of Performance Was Accepted. Pop: Task - 12/14/2017 - 07/30/2018 Order - 09/11/2014 - 10/31/2018 Pricing: $36,354.96 Deliver To: Nih Campus, Bldg. 14D Product Service Code: Y1jz Product/Service Description: Construction Of Miscellaneous Buildings Can # 8032443, Orf Tas::75 8/2 0838::Tas 08023820185Db0 Duns # 048305846 Far 52.211-10 - Commencement, Prosecution, And Completion Of Work (Apr1984) The Contractor Shall Be Required To (A) Commence Work Under This Contract Within 5 (Five) Calendar Days After The Date The Contractor Receives The Notice To Proceed, (B) Prosecute The Work Diligently, And (C) Complete The Entire Work Ready For Use Not Later Than July 30, 2018. * The Time Stated For Completion Shall Include 10 Days For Mobilization And Final Cleanup Of The Premises. (End Of Clause) All Other Terms&Conditions Remain In Effect.
- 12 Dec 2017
- Igf::Ot::Igf("Other Functions") - C101286; Design/Build Services To Replace Hvac Duct And Reheat Coils, Bldg. 14D; Chuck Kirby Mod 0014 - Design/Build Services To Replace Hvac Duct And Reheat Coils. See Attached Sow. 1. Provide And Install Additional Epoxy Infill In Rms D200, D205, D209. This Is For The Removal Of Existing Infill That Has To Be Removed To Install The Moisture Barrier. 2. Perform/Record Testing And Balancing Readings For Ef#1 And Ef#2. 3. Provide And Install (2) Motors With Grounding Rings And Connect To Newly Installed Vfds. The Motors Should Be Compatible To The Vfds. 22 Days Extension To Period Of Performance Was Accepted. Pop: Task - 12/14/2017 - 07/30/2018 Order - 09/11/2014 - 10/31/2018 Pricing: $36,354.96 Deliver To: Nih Campus, Bldg. 14D Product Service Code: Y1jz Product/Service Description: Construction Of Miscellaneous Buildings Can # 8032443, Orf Tas::75 8/2 0838::Tas 08023820185Db0 Duns # 048305846 Far 52.211-10 - Commencement, Prosecution, And Completion Of Work (Apr1984) The Contractor Shall Be Required To (A) Commence Work Under This Contract Within 5 (Five) Calendar Days After The Date The Contractor Receives The Notice To Proceed, (B) Prosecute The Work Diligently, And (C) Complete The Entire Work Ready For Use Not Later Than July 30, 2018. * The Time Stated For Completion Shall Include 10 Days For Mobilization And Final Cleanup Of The Premises. (End Of Clause) All Other Terms&Conditions Remain In Effect.
- Nih A E Construction
- Department Of Health And Human Services (Hhs)
- $4,385,248.51
- Department Of Health And Human Services (Hhs)