Asca, Inc
CAGE Code: 1PT75
NCAGE Code: 1PT75
Status: Active
Type: Commercial Supplier
Dun & Bradstreet (DUNS): 012706904
Summary
Asca, Inc is an Active Commercial Supplier with the Cage Code 1PT75 and is tracked by Dun & Bradstreet under DUNS Number 012706904..
Address
1720 S Catalina Ave 220
Redondo Beach CA 90277-5504
United States
Points of Contact
Related Information
People who viewed this 'CAGE Code' also viewed...
Pample Industries Llc Mastery Inc Unholtz-Dickie Corp Northrop Grumman Systems Corporation A R Alarm Inc Nde Environmental Corp Solenoid Devices Division Tridair Wemco Enterprises Eight Ball Enterprises Northrop Grumman Space & Mission Akbar Ventures Llc Cadstar Enterprises Big Splash Inc Dba Monsoon Lagoon Florence Fabrics Inc Stn Enterprises Dba School Timbers Of The World Aero Tool Co Div Tridair Industries Alcast Foundry Inc Skipper Marine Electronics Wells Fargo Alarm Services Div Of
Frequently Asked Questions (FAQ) for CAGE 1PT75
- What is CAGE Code 1PT75?
- 1PT75 is the unique identifier used by NATO Organizations to reference the physical entity known as Asca, Inc located at 1720 S Catalina Ave 220, Redondo Beach CA 90277-5504, United States.
- Who is CAGE Code 1PT75?
- 1PT75 refers to Asca, Inc located at 1720 S Catalina Ave 220, Redondo Beach CA 90277-5504, United States.
- Where is CAGE Code 1PT75 Located?
- CAGE Code 1PT75 is located in Redondo Beach, CA, USA.
Contracting History for CAGE 1PT75 Most Recent 25 Records
- GS23F0049R
- Federal Supply Schedule Contract
- 23 Nov 2023
- Federal Supply Schedule Contract
- Gsa/Fas/Pshc/Prof Srvcs Sched-Pss
- General Services Administration (Gsa)
- $0.00
- General Services Administration (Gsa)
- GS23F0049R
- Federal Supply Schedule Contract
- 4 Oct 2023
- Federal Supply Schedule Contract
- Gsa/Fas/Pshc/Prof Srvcs Sched-Pss
- General Services Administration (Gsa)
- $0.00
- General Services Administration (Gsa)
- GS23F0049R
- Sin: 871 3Services Required Under This Sin Involve The Translation Of A System (Or Subsystem, Program, Project, Activity) Concept Into A Preliminary And Detailed Design (Engineering Plans And Specifications), Performing Risk Identification/Analysis,Mitigation, Traceability, And Then Integrating The Various Components To Produce A Working Prototype Or Model Of The System. Typical Associated Tasks Include, But Are Not Limited To Computer-Aided Design, E.G. Cadd, Design Studies And Analysis, Design Review Services, Shop Drawing Review Services, Submittal Review Services, Conducting Fire Protection Facility Surveys, Developing Risk Reduction Strategies And Recommendations To Mitigate Identified Risk Conditions, Fire Modeling, Performance-Based Design Reviews, High Level Detailed Specification And Scope Preparation, Configuration, Management And Document Control, Fabrication, Assembly And Simulation, Modeling, Training, Consulting, Analysis Of Single Or Multispacecraft Missions, And Missi
- 25 Feb 2017
- Sin: 871 3Services Required Under This Sin Involve The Translation Of A System (Or Subsystem, Program, Project, Activity) Concept Into A Preliminary And Detailed Design (Engineering Plans And Specifications), Performing Risk Identification/Analysis,Mitigation, Traceability, And Then Integrating The Various Components To Produce A Working Prototype Or Model Of The System. Typical Associated Tasks Include, But Are Not Limited To Computer-Aided Design, E.G. Cadd, Design Studies And Analysis, Design Review Services, Shop Drawing Review Services, Submittal Review Services, Conducting Fire Protection Facility Surveys, Developing Risk Reduction Strategies And Recommendations To Mitigate Identified Risk Conditions, Fire Modeling, Performance-Based Design Reviews, High Level Detailed Specification And Scope Preparation, Configuration, Management And Document Control, Fabrication, Assembly And Simulation, Modeling, Training, Consulting, Analysis Of Single Or Multispacecraft Missions, And Missi
- Gsa Fas Msc Acquisition
- General Services Administration (Gsa)
- $0.00
- General Services Administration (Gsa)
- 80KSC018F0257
- Preliminary And Final Update/Quantification Report Falcon 9: Preliminary Update/Qualification Report Falcon Heavy. Modification Is To Extend The Period Of Performance From 3/31/2021 To 9/30/2021 At No Additional Costs To The Government.
- 14 Apr 2021
- Preliminary And Final Update/Quantification Report Falcon 9: Preliminary Update/Qualification Report Falcon Heavy. Modification Is To Extend The Period Of Performance From 3/31/2021 To 9/30/2021 At No Additional Costs To The Government.
- Nasa Kennedy Space Center
- National Aeronautics And Space Administration (Nasa)
- $663,648.45
- National Aeronautics And Space Administration (Nasa)
- NNK16LA85D
- Launch Vehicle Probabilistic Reliability Analysis Task 7, Demonstration And Testing Of Executable Model Mod 2: This Modification Updates (Software Testing), Updating A Test Case From Atlas 551 To Falcon 9 And Does Not Change The Level Of Effort At No Additional Cost To Ksc. This Modification Extends The Period Of Performance To 10/31/2019 At No Additional Cost To The Government Per Contractor Request Dated 01/30/19. All Other Terms And Conditions Remain Unchanged.
- 20 Feb 2019
- Launch Vehicle Probabilistic Reliability Analysis Task 7, Demonstration And Testing Of Executable Model Mod 2: This Modification Updates (Software Testing), Updating A Test Case From Atlas 551 To Falcon 9 And Does Not Change The Level Of Effort At No Additional Cost To Ksc. This Modification Extends The Period Of Performance To 10/31/2019 At No Additional Cost To The Government Per Contractor Request Dated 01/30/19. All Other Terms And Conditions Remain Unchanged.
- Nasa Kennedy Space Center
- National Aeronautics And Space Administration (Nasa)
- $83,363.27
- National Aeronautics And Space Administration (Nasa)
- GS23F0049R
- Federal Supply Schedule Contract
- 29 Nov 2022
- Federal Supply Schedule Contract
- Gsa/Fas/Pshc/Prof Srvcs Sched-Pss
- General Services Administration (Gsa)
- $0.00
- General Services Administration (Gsa)
- GS23F0049R
- Federal Supply Schedule Contract
- 12 Nov 2019
- Federal Supply Schedule Contract
- Gsa/Fas/Pshc/Prof Srvcs Sched-Pss
- General Services Administration (Gsa)
- $0.00
- General Services Administration (Gsa)
- GS23F0049R
- Federal Supply Schedule Contract
- 8 Feb 2023
- Federal Supply Schedule Contract
- Gsa/Fas/Pshc/Prof Srvcs Sched-Pss
- General Services Administration (Gsa)
- $0.00
- General Services Administration (Gsa)
- GS23F0049R
- Eo14042 This Contract Is Hereby Modified To Incorporate Federal Acquisition Regulation (Far) Clause 52.223-99 Ensuring Adequate Covid-19 Safety Protocols For Federal Contractors - Federal Supply Schedule Contract
- 19 Oct 2021
- Eo14042 This Contract Is Hereby Modified To Incorporate Federal Acquisition Regulation (Far) Clause 52.223-99 Ensuring Adequate Covid-19 Safety Protocols For Federal Contractors - Federal Supply Schedule Contract
- Gsa/Fas/Pshc/Prof Srvcs Sched-Pss
- General Services Administration (Gsa)
- $0.00
- General Services Administration (Gsa)
- NNK15LB03D
- Igf::Ot::Igf - Launch Vehicle Probabilistic Reliability Analysis Sub-Tasks: 7-1,7-2,7-3, 7-4 For A Single Executable Pra Model Mod 4- Changes Ending Date To 11/16/2018 V
- 18 Sep 2018
- Igf::Ot::Igf - Launch Vehicle Probabilistic Reliability Analysis Sub-Tasks: 7-1,7-2,7-3, 7-4 For A Single Executable Pra Model Mod 4- Changes Ending Date To 11/16/2018 V
- Nasa Kennedy Space Center
- National Aeronautics And Space Administration (Nasa)
- $69,699.84
- National Aeronautics And Space Administration (Nasa)
- GS23F0049R
- Sin: 871 3Services Required Under This Sin Involve The Translation Of A System (Or Subsystem, Program, Project, Activity) Concept Into A Preliminary And Detailed Design (Engineering Plans And Specifications), Performing Risk Identification/Analysis,Mitigation, Traceability, And Then Integrating The Various Components To Produce A Working Prototype Or Model Of The System. Typical Associated Tasks Include, But Are Not Limited To Computer-Aided Design, E.G. Cadd, Design Studies And Analysis, Design Review Services, Shop Drawing Review Services, Submittal Review Services, Conducting Fire Protection Facility Surveys, Developing Risk Reduction Strategies And Recommendations To Mitigate Identified Risk Conditions, Fire Modeling, Performance-Based Design Reviews, High Level Detailed Specification And Scope Preparation, Configuration, Management And Document Control, Fabrication, Assembly And Simulation, Modeling, Training, Consulting, Analysis Of Single Or Multispacecraft Missions, And Missi
- 6 Dec 2017
- Sin: 871 3Services Required Under This Sin Involve The Translation Of A System (Or Subsystem, Program, Project, Activity) Concept Into A Preliminary And Detailed Design (Engineering Plans And Specifications), Performing Risk Identification/Analysis,Mitigation, Traceability, And Then Integrating The Various Components To Produce A Working Prototype Or Model Of The System. Typical Associated Tasks Include, But Are Not Limited To Computer-Aided Design, E.G. Cadd, Design Studies And Analysis, Design Review Services, Shop Drawing Review Services, Submittal Review Services, Conducting Fire Protection Facility Surveys, Developing Risk Reduction Strategies And Recommendations To Mitigate Identified Risk Conditions, Fire Modeling, Performance-Based Design Reviews, High Level Detailed Specification And Scope Preparation, Configuration, Management And Document Control, Fabrication, Assembly And Simulation, Modeling, Training, Consulting, Analysis Of Single Or Multispacecraft Missions, And Missi
- Gsa/Fas/Pshc/Prof Srvcs Sched-Pss
- General Services Administration (Gsa)
- $0.00
- General Services Administration (Gsa)
- GS23F0049R
- Federal Supply Schedule Contract
- 13 Nov 2021
- Federal Supply Schedule Contract
- Gsa/Fas/Pshc/Prof Srvcs Sched-Pss
- General Services Administration (Gsa)
- $0.00
- General Services Administration (Gsa)
- 80KSC018F0257
- Preliminary And Final Update/Quantification Report Falcon 9. Mod 8: Extends Period Of Performance At No Additional Costs To The Government To Allow For Completion Of The Vulcan Tasks. All Other Terms And Conditions Remain Unchanged.
- 3 Sep 2021
- Preliminary And Final Update/Quantification Report Falcon 9. Mod 8: Extends Period Of Performance At No Additional Costs To The Government To Allow For Completion Of The Vulcan Tasks. All Other Terms And Conditions Remain Unchanged.
- Nasa Kennedy Space Center
- National Aeronautics And Space Administration (Nasa)
- $663,648.45
- National Aeronautics And Space Administration (Nasa)
- NNK16LA85D
- Launch Vehicle Probabilistic Reliability Analysis Task 7, Demonstration And Testing Of Executable Model. Extends The Period Of Performance To 04/30/2021 At No Additional Cost To The Government
- 28 Sep 2020
- Launch Vehicle Probabilistic Reliability Analysis Task 7, Demonstration And Testing Of Executable Model. Extends The Period Of Performance To 04/30/2021 At No Additional Cost To The Government
- Nasa Kennedy Space Center
- National Aeronautics And Space Administration (Nasa)
- $83,363.27
- National Aeronautics And Space Administration (Nasa)
- 80NSSC22PA756
- Asca Lox/Lng Studies
- 10 May 2022
- Asca Lox/Lng Studies
- Nasa Shared Services Center
- National Aeronautics And Space Administration (Nasa)
- $173,244.00
- National Aeronautics And Space Administration (Nasa)
- NNK16LA85D
- Launch Vehicle Probabilistic Reliability Analysis Task 7, Demonstration And Testing Of Executable Model. The Purpose Of This Mod Is To Correct The Task Prices As A Result Of The Letter From Gsa Dated 3/20/20. As A Result The Overall Task Order Price And Funded Amount Is Hereby Reduced By $1,808.68 To $83,363.27. All Other Terms And Conditions Remain In Full Force And Effect.
- 14 May 2020
- Launch Vehicle Probabilistic Reliability Analysis Task 7, Demonstration And Testing Of Executable Model. The Purpose Of This Mod Is To Correct The Task Prices As A Result Of The Letter From Gsa Dated 3/20/20. As A Result The Overall Task Order Price And Funded Amount Is Hereby Reduced By $1,808.68 To $83,363.27. All Other Terms And Conditions Remain In Full Force And Effect.
- Nasa Kennedy Space Center
- National Aeronautics And Space Administration (Nasa)
- $83,363.27
- National Aeronautics And Space Administration (Nasa)
- 80KSC018F0257
- Additional Asca Task. The Purpose Of This Modification Is To Correct The Task Prices As A Result Of The Letter From Gsa Dated March 20,2020. The Overall Task Order Price And Funded Amount Is Decreased $35,314.80. All Other Terms And Conditions Remain In Full Force And Effect.
- 29 Apr 2020
- Additional Asca Task. The Purpose Of This Modification Is To Correct The Task Prices As A Result Of The Letter From Gsa Dated March 20,2020. The Overall Task Order Price And Funded Amount Is Decreased $35,314.80. All Other Terms And Conditions Remain In Full Force And Effect.
- Nasa Kennedy Space Center
- National Aeronautics And Space Administration (Nasa)
- $663,648.45
- National Aeronautics And Space Administration (Nasa)
- GS23F0049R
- Federal Supply Schedule Contract
- 20 Sep 2021
- Federal Supply Schedule Contract
- Gsa/Fas/Pshc/Prof Srvcs Sched-Pss
- General Services Administration (Gsa)
- $0.00
- General Services Administration (Gsa)
- GS23F0049R
- Sin: 871 3Services Required Under This Sin Involve The Translation Of A System (Or Subsystem, Program, Project, Activity) Concept Into A Preliminary And Detailed Design (Engineering Plans And Specifications), Performing Risk Identification/Analysis,Mitigation, Traceability, And Then Integrating The Various Components To Produce A Working Prototype Or Model Of The System. Typical Associated Tasks Include, But Are Not Limited To Computer-Aided Design, E.G. Cadd, Design Studies And Analysis, Design Review Services, Shop Drawing Review Services, Submittal Review Services, Conducting Fire Protection Facility Surveys, Developing Risk Reduction Strategies And Recommendations To Mitigate Identified Risk Conditions, Fire Modeling, Performance-Based Design Reviews, High Level Detailed Specification And Scope Preparation, Configuration, Management And Document Control, Fabrication, Assembly And Simulation, Modeling, Training, Consulting, Analysis Of Single Or Multispacecraft Missions, And Missi
- 5 Feb 2017
- Sin: 871 3Services Required Under This Sin Involve The Translation Of A System (Or Subsystem, Program, Project, Activity) Concept Into A Preliminary And Detailed Design (Engineering Plans And Specifications), Performing Risk Identification/Analysis,Mitigation, Traceability, And Then Integrating The Various Components To Produce A Working Prototype Or Model Of The System. Typical Associated Tasks Include, But Are Not Limited To Computer-Aided Design, E.G. Cadd, Design Studies And Analysis, Design Review Services, Shop Drawing Review Services, Submittal Review Services, Conducting Fire Protection Facility Surveys, Developing Risk Reduction Strategies And Recommendations To Mitigate Identified Risk Conditions, Fire Modeling, Performance-Based Design Reviews, High Level Detailed Specification And Scope Preparation, Configuration, Management And Document Control, Fabrication, Assembly And Simulation, Modeling, Training, Consulting, Analysis Of Single Or Multispacecraft Missions, And Missi
- Gsa Fas Msc Acquisition
- General Services Administration (Gsa)
- $0.00
- General Services Administration (Gsa)
- GS23F0049R
- Federal Supply Schedule Contract
- 21 Nov 2019
- Federal Supply Schedule Contract
- Gsa/Fas/Pshc/Prof Srvcs Sched-Pss
- General Services Administration (Gsa)
- $0.00
- General Services Administration (Gsa)
- GS23F0049R
- Federal Supply Schedule Contract
- 5 Oct 2023
- Federal Supply Schedule Contract
- Gsa/Fas/Pshc/Prof Srvcs Sched-Pss
- General Services Administration (Gsa)
- $0.00
- General Services Administration (Gsa)
- NNA14AB55C
- Nasa Research Announcement (Nra) For Software Intensive Systems: Verification And Validation Of Model-Based And Adaptive Systems
- 25 Feb 2021
- Nasa Research Announcement (Nra) For Software Intensive Systems: Verification And Validation Of Model-Based And Adaptive Systems
- Nasa Ames Research Center
- National Aeronautics And Space Administration (Nasa)
- $1,178,761.00
- National Aeronautics And Space Administration (Nasa)
- NNK15LB03D
- Igf::Ot::Igf - Launch Vehicle Probabilistic Reliability Analysis Sub-Tasks: 7-1,7-2,7-3, 7-4 For A Single Executable Pra Model Mod. 3 Changes Ending Date To 8/31/2018 V
- 5 Jul 2018
- Igf::Ot::Igf - Launch Vehicle Probabilistic Reliability Analysis Sub-Tasks: 7-1,7-2,7-3, 7-4 For A Single Executable Pra Model Mod. 3 Changes Ending Date To 8/31/2018 V
- Nasa Kennedy Space Center
- National Aeronautics And Space Administration (Nasa)
- $69,699.84
- National Aeronautics And Space Administration (Nasa)
- 80NSSC22PA756
- Asca Lox/Lng Studies
- 23 Mar 2023
- Asca Lox/Lng Studies
- Nasa Shared Services Center
- National Aeronautics And Space Administration (Nasa)
- $173,244.00
- National Aeronautics And Space Administration (Nasa)
- 80KSC018F0257
- Preliminary And Final Update/Quantification Report Falcon 9. Mod 1 Adds Clause 52.223-99 Ensuring Adequate Covid-19 Safety Protocols For Federal Contractors, Per Procurement Class Deviation (Pcd) 21-03.
- 2 Nov 2021
- Preliminary And Final Update/Quantification Report Falcon 9. Mod 1 Adds Clause 52.223-99 Ensuring Adequate Covid-19 Safety Protocols For Federal Contractors, Per Procurement Class Deviation (Pcd) 21-03.
- Nasa Kennedy Space Center
- National Aeronautics And Space Administration (Nasa)
- $663,648.45
- National Aeronautics And Space Administration (Nasa)