All-Rite Construction, Inc.

CAGE Code: 1PH13

NCAGE Code: 1PH13

Status: Active

Type: Commercial Supplier

Dun & Bradstreet (DUNS): 125678883

CAGE 1PH13 All-Rite Construction, Inc.
CAGE 1PH13 All-Rite Construction, Inc.

Summary

All-Rite Construction, Inc. is an Active Commercial Supplier with the Cage Code 1PH13 and is tracked by Dun & Bradstreet under DUNS Number 125678883..

Address

539 Oliver Ross Dr Nw
Albuquerque NM 87121-5322
United States

Related Information

Associated CAGE Codes People who viewed this 'CAGE Code' also viewed...

CAGE Code FAQ Frequently Asked Questions (FAQ) for CAGE 1PH13

What is CAGE Code 1PH13?
1PH13 is the unique identifier used by NATO Organizations to reference the physical entity known as All-Rite Construction, Inc. located at 539 Oliver Ross Dr Nw, Albuquerque NM 87121-5322, United States.
Who is CAGE Code 1PH13?
1PH13 refers to All-Rite Construction, Inc. located at 539 Oliver Ross Dr Nw, Albuquerque NM 87121-5322, United States.
Where is CAGE Code 1PH13 Located?
CAGE Code 1PH13 is located in Albuquerque, NM, USA.

Contracting History for CAGE 1PH13 Contracting History for CAGE 1PH13 Most Recent 25 Records

140P1323F0235
Bandelier National Monument - Construction Of Five (5) Sheds 10 Foot W X 10 Foot L X 8 Foot H To Be Framed With Lumber And Sat Upon One Base Course Of Concrete Filled Cinderblocks Buried 6In Deep And 3 Coat Stucco With Mesh Exterior Color Tbd Down
29 Nov 2023
Imr Santa Fe(12100)
Department Of The Interior (Doi)
$96,919.74
140P1323F0235
Bandelier National Monument - Construction Of Five (5) Sheds 10 Foot W X 10 Foot L X 8 Foot H To Be Framed With Lumber And Sat Upon One Base Course Of Concrete Filled Cinderblocks Buried 6In Deep And 3 Coat Stucco With Mesh Exterior Color Tbd Down
19 Sep 2023
Imr Santa Fe(12100)
Department Of The Interior (Doi)
$80,000.00
140P1323F0208
Guadalupe Mountains National Park - Contract Requires Replacement Of Existing Windows, Doors, Removing Lap Siding And Installing An Elastomeric Stucco System. This Work Will Be Performed On Housing Units Q317 And Q318. The Housing Units Are Located W
5 Sep 2023
Imr Santa Fe(12100)
Department Of The Interior (Doi)
$177,837.44
140P1323F0212
Bandelier National Monument - Replace Decks In Quarters 100 And 102. The Purpose Of This Modification Is To Extend The Period Of Performance To 4/26/2024 At No Additional Cost To The Government. Contractor's Statement Of Release: The Fore
19 Dec 2023
Imr Santa Fe(12100)
Department Of The Interior (Doi)
$19,122.00
140P1323F0212
Bandelier National Monument - Replace Decks In Quarters 100 And 102. This Contract Consists Of Demolition And Construction Of One (1) 10X 30 Patio Deck And The Construction Of One (1) 10 X 30 Patio Deck, Both Constructed Out Of Treated Lumber. Dec
6 Sep 2023
Imr Santa Fe(12100)
Department Of The Interior (Doi)
$19,122.00
140P1324F0003
Band Replace Deck At Quarters 104 & 106
15 Dec 2023
Imr Santa Fe(12100)
Department Of The Interior (Doi)
$22,630.57
140P1323F0188
Band-Hb-30 Fire Tower Exterior Rehabit.
23 Aug 2023
Imr Santa Fe(12100)
Department Of The Interior (Doi)
$119,471.71
140P1523F0041
Grand Canyon Np(Grca) Requires The Replacement Of The Failed Roof Drainage On The South Rim Headquarters Building.Arizona Saber To 140P1519d0001/140P1523f0041 -Per The National Park Service Scope Of Work -Heat Tape Assembly, Design And Installatio
31 Jul 2023
Imr Arizona(12400)
Department Of The Interior (Doi)
$214,927.95
140P1323F0144
Carslbad Caverns Np-Rebuild Loading Dock And Stairs
10 Aug 2023
Imr Santa Fe(12100)
Department Of The Interior (Doi)
$177,618.63
140P1523F0062
Glca Rehabilitate Lees Ferry Campground
14 Sep 2023
Imr Arizona(12400)
Department Of The Interior (Doi)
$650,476.00
140P1323F0124
Cham - Cyclic Trail Maintenance
6 Jul 2023
Imr Santa Fe(12100)
Department Of The Interior (Doi)
$213,548.40
140P1323F0104
Carlsbad Caverns National Park, Repair And Replace Lift Station Equipment
13 Jun 2023
Imr Santa Fe(12100)
Department Of The Interior (Doi)
$165,179.01
140P1323F0095
Band Clean Road Culverts
1 Jun 2023
Imr Santa Fe(12100)
Department Of The Interior (Doi)
$61,313.19
140P1323F0146
Lake Meredith National Recreation Area - Replacement Of The Sanford Yake Breakwater System. This Is A Firm Fixed Price Contract To Include The Removal And Replacement Of The Current Wavebreak System At Sanford Yake Marina And Boat Ramp At Lake Me
3 Aug 2023
Imr Santa Fe(12100)
Department Of The Interior (Doi)
$564,435.00
140P1523F0038
Seaz Painting Project Bundle, Coordinate With Park Cor/Poc. Mr. Sam Bell-Tn: (520) 274-0535 Email: Sam_Bell@Nps.Gov
15 Aug 2023
Imr Arizona(12400)
Department Of The Interior (Doi)
$445,940.39
140P1323F0038
Amis Restore Governors Landing Amphitheater
11 Jul 2023
Imr Santa Fe(12100)
Department Of The Interior (Doi)
$159,146.01
140P1323F0038
Amis Restore Governors Landing Amphitheater
9 Mar 2023
Imr Santa Fe(12100)
Department Of The Interior (Doi)
$159,146.01
140P1323F0038
Amis Restore Governors Landing Amphitheater
12 Jun 2023
Imr Santa Fe(12100)
Department Of The Interior (Doi)
$148,232.62
140P1323F0019
Old Santa Fe Trail Building Ostb- Repair And Repaint Great Room The Purpose Of This Modification Is To Extend The Period Of Performance To July 28, 2023 At No Additional Cost To The Government. Contractor's Statement Of Release: The Forego
16 May 2023
Imr Santa Fe(12100)
Department Of The Interior (Doi)
$59,785.64
140P1323F0019
Old Santa Fe Trail Building Ostb- Repair And Repaint Great Room The Primary Work Of This Project Includes, But Is Not Limited To, The Repair Of Plaster Wall Finishes And Paint Approximately 3,200 Square Feet Of Wall Surface, Stain The Interiors Of
17 Jan 2023
Imr Santa Fe(12100)
Department Of The Interior (Doi)
$59,785.64
140P1323F0006
Peco Exhibit Demo And Room Prep -211142C
6 Dec 2022
Imr Santa Fe(12100)
Department Of The Interior (Doi)
$87,763.84
140P1322F0230
White Sands National Park Visitor Center Restore Sidewalks Pmis 268451 This Contract Demolishes And Replaces Approximately 10,000 Square Feet Of Concrete Sidewalk. All Work Shall Meet Architectural Barriers Act Accessibility Standards. This Inclu
19 Sep 2022
Imr Santa Fe(12100)
Department Of The Interior (Doi)
$284,078.14
140P1322F0202
Big Bend National Park - Replace Water Line - Kbar Well 5 This Project Includes Installation Of Approximately 1,177 Linear Feet Of 3" Hdpe Sdr 11 Waterline At 4' Minimum Bury Depth. New Water Line Will Be Integrated Into The Kbar Well 5
6 Sep 2022
Imr Santa Fe(12100)
Department Of The Interior (Doi)
$249,209.01
140P1522F0086
Montezuma Castle Visitor Center (Moca) Restroom Rehabilitation Project Az Mabo Saber To Poc/Pi: Greg Wolcott, Greg_Wolcott@Nps.Gov, 928-567-5276 X 223 Cor: Theodore Ramlal, Theodore_Ramlal@Nps.Gov, 602-794-3827 Cs: Taylor Jones, Taylor_A_Jones@Np
19 Sep 2022
Imr Arizona(12400)
Department Of The Interior (Doi)
$305,036.64
140P1522F0086
The Purpose Of This Bilateral Modification #1 Is To: A) Extend The Period Of Performance (Pop), Changing The Pop Dates From 2/1/2023 To 2/28/2023 Due To Park Closures Because Of Weather And Provide Extra Time To Complete The Additional, Within Scope
24 Jan 2023
Imr Arizona(12400)
Department Of The Interior (Doi)
$309,028.29