Aspen Construction Company
Dba Aspen Construction Co
CAGE Code: 1M0L4
NCAGE Code: 1M0L4
Status: Active
Type: Commercial Supplier
Dun & Bradstreet (DUNS): 162022149
Summary
Aspen Construction Company, Dba Aspen Construction Co is an Active Commercial Supplier with the Cage Code 1M0L4 and is tracked by Dun & Bradstreet under DUNS Number 162022149..
Address
3798 State 371 Nw
Hackensack MN 56452-2287
United States
Points of Contact
- Telephone:
- 2186755808
- Fax:
- 2186755809
- http://www.aspen-construction.com/
Related Information
People who viewed this 'CAGE Code' also viewed...
Iis Inc California Eastern Lab Inc National Corporate Disposal Anelco Inc Imagery Embroidery Nidisco Inc Air And Hydraulic Equipment Co Tenavision Inc Datarich Management Systems Fordion Packaging Ltd. Rotec Mfg And Engineering Corp Bolen Industries Information Processing Systems Inc Gabriel Engineering Consultants Siber Hegner North America Inc Humanex Group The Shifa Services Inc Spartech Llc Paperboard Products Corp Smartlight Inc
Frequently Asked Questions (FAQ) for CAGE 1M0L4
- What is CAGE Code 1M0L4?
- 1M0L4 is the unique identifier used by NATO Organizations to reference the physical entity known as Aspen Construction Company Dba Aspen Construction Co located at 3798 State 371 Nw, Hackensack MN 56452-2287, United States.
- Who is CAGE Code 1M0L4?
- 1M0L4 refers to Aspen Construction Company Dba Aspen Construction Co located at 3798 State 371 Nw, Hackensack MN 56452-2287, United States.
- Where is CAGE Code 1M0L4 Located?
- CAGE Code 1M0L4 is located in Hackensack, MN, USA.
Contracting History for CAGE 1M0L4 Most Recent 25 Records
- 693C7324F00006N
- Project Np Nace 300(1), 301(1): The Project Consists Of Reconstruction Of Marshall Hall Access Road And Marshall Hall Loop Road. The Work Includes Construction Of Pedestrian Trails And Parking Area; Removal Of Existing Asphalt Roads; Reconstruction
- 13 Nov 2023
- Project Np Nace 300(1), 301(1): The Project Consists Of Reconstruction Of Marshall Hall Access Road And Marshall Hall Loop Road. The Work Includes Construction Of Pedestrian Trails And Parking Area; Removal Of Existing Asphalt Roads; Reconstruction
- 693C73 Eastern Fed Lands Division
- Department Of Transportation (Dot)
- $1,352,300.00
- Department Of Transportation (Dot)
- FA480023F0242
- The Contractor Shall Provide All Labor, Material And Equipment To Remove Existing And Replace With New Concrete At The Base Ops Flight Line Entrance Located At Jble-Langley, Hampton, Va.
- 31 Aug 2023
- The Contractor Shall Provide All Labor, Material And Equipment To Remove Existing And Replace With New Concrete At The Base Ops Flight Line Entrance Located At Jble-Langley, Hampton, Va.
- Fa4800 633 Cons Pkp
- Department Of Defense (Dod)
- $146,758.82
- Department Of Defense (Dod)
- FA480023F0287
- Repair Entry Ramp And Complete Miscellaneous Sitework On The South Side Of Building 23 At Joint Base Langley-Eustis, Langley Afb, Va.
- 28 Sep 2023
- Repair Entry Ramp And Complete Miscellaneous Sitework On The South Side Of Building 23 At Joint Base Langley-Eustis, Langley Afb, Va.
- Fa4800 633 Cons Pkp
- Department Of Defense (Dod)
- $30,085.19
- Department Of Defense (Dod)
- FA480023F0279
- The Scope Of This Project Is To Paint Pavement Markings And Repave Parking Lots For Districts 2,4,7&8 And Building 671 & Building 2413 Parking Lots, And Darcy Pl
- 28 Sep 2023
- The Scope Of This Project Is To Paint Pavement Markings And Repave Parking Lots For Districts 2,4,7&8 And Building 671 & Building 2413 Parking Lots, And Darcy Pl
- Fa4800 633 Cons Pkp
- Department Of Defense (Dod)
- $566,374.95
- Department Of Defense (Dod)
- FA480023F0210
- Emergency Paving Repair Of Nealy Ave Sinkhole At Outfall.
- 23 Aug 2023
- Emergency Paving Repair Of Nealy Ave Sinkhole At Outfall.
- Fa4800 633 Cons Pkp
- Department Of Defense (Dod)
- $17,213.03
- Department Of Defense (Dod)
- FA480023F0112
- Construction Of A Concrete Pad In Front Of The Cargo Yard (Area Of Grass) Next To Building 351.
- 2 Aug 2023
- Construction Of A Concrete Pad In Front Of The Cargo Yard (Area Of Grass) Next To Building 351.
- Fa4800 633 Cons Pkp
- Department Of Defense (Dod)
- $594,018.18
- Department Of Defense (Dod)
- FA480023F0112
- Construction Of A Concrete Pad In Front Of The Cargo Yard (Area Of Grass) Next To Building 351.
- 30 May 2023
- Construction Of A Concrete Pad In Front Of The Cargo Yard (Area Of Grass) Next To Building 351.
- Fa4800 633 Cons Pkp
- Department Of Defense (Dod)
- $594,018.18
- Department Of Defense (Dod)
- FA480023F0148
- The Purpose Of This Award Is To Construct An Adjoining Parking Lot In-Place Of F. 788.
- 14 Jul 2023
- The Purpose Of This Award Is To Construct An Adjoining Parking Lot In-Place Of F. 788.
- Fa4800 633 Cons Pkp
- Department Of Defense (Dod)
- $301,960.86
- Department Of Defense (Dod)
- FA480023F0124
- Design And Construct Adjoining Parking Lots Near F. 378 And F. 775
- 14 Jul 2023
- Design And Construct Adjoining Parking Lots Near F. 378 And F. 775
- Fa4800 633 Cons Pkp
- Department Of Defense (Dod)
- $394,422.26
- Department Of Defense (Dod)
- FA480023F0051
- Contractor Shall Remove And Replace Approximately 128 Oversized Concrete Slabs Located On The F-22 Fighter Ramp That Are Deteriorated And Spalled Or Cracked. Period Of Performance Is 272 Calendar Days.
- 30 Mar 2023
- Contractor Shall Remove And Replace Approximately 128 Oversized Concrete Slabs Located On The F-22 Fighter Ramp That Are Deteriorated And Spalled Or Cracked. Period Of Performance Is 272 Calendar Days.
- Fa4800 633 Cons Pkp
- Department Of Defense (Dod)
- $1,805,742.87
- Department Of Defense (Dod)
- FA480023F0051
- Contractor Shall Remove And Replace Approximately 128 Oversized Concrete Slabs Located On The F-22 Fighter Ramp That Are Deteriorated And Spalled Or Cracked.
- 9 Aug 2023
- Contractor Shall Remove And Replace Approximately 128 Oversized Concrete Slabs Located On The F-22 Fighter Ramp That Are Deteriorated And Spalled Or Cracked.
- Fa4800 633 Cons Pkp
- Department Of Defense (Dod)
- $1,805,742.87
- Department Of Defense (Dod)
- FA480023F0029
- Contractor Shall Repair/Repave Approximately 52 Oversized Concrete Slabs, 500 Lf Of Shallow Depth Spalls, And 65 Lf Of Airfield Box Drains On The Langley Afb East Ramp. Period Of Performance Is 194 Calendar Days.
- 10 Feb 2023
- Contractor Shall Repair/Repave Approximately 52 Oversized Concrete Slabs, 500 Lf Of Shallow Depth Spalls, And 65 Lf Of Airfield Box Drains On The Langley Afb East Ramp. Period Of Performance Is 194 Calendar Days.
- Fa4800 633 Cons Pkp
- Department Of Defense (Dod)
- $754,517.71
- Department Of Defense (Dod)
- FA480023F0052
- This Award Is For A Project To Repair The Sanitary Sewer System Located On The East Side Of Langley Afb.
- 24 Mar 2023
- This Award Is For A Project To Repair The Sanitary Sewer System Located On The East Side Of Langley Afb.
- Fa4800 633 Cons Pkp
- Department Of Defense (Dod)
- $488,567.91
- Department Of Defense (Dod)
- FA480022F0168
- The Contractor Shall Repair The East Warm Up Pad On Runway 26. Repairs Will Include Full Depth 18" Slab Replacements, Partial Depth Repairs Of Spalls, Installation Of Joint Sealant, & Painting Of Aircraft Taxi Lines/Hold Lines Requiring Replacement.
- 15 Aug 2022
- The Contractor Shall Repair The East Warm Up Pad On Runway 26. Repairs Will Include Full Depth 18" Slab Replacements, Partial Depth Repairs Of Spalls, Installation Of Joint Sealant, & Painting Of Aircraft Taxi Lines/Hold Lines Requiring Replacement.
- Fa4800 633 Cons Pkp
- Department Of Defense (Dod)
- $452,315.37
- Department Of Defense (Dod)
- FA480022F0177
- Removal Of Rubber From The Runway On Langley Air Force Base, Virginia.
- 3 Nov 2022
- Removal Of Rubber From The Runway On Langley Air Force Base, Virginia.
- Fa4800 633 Cons Pkp
- Department Of Defense (Dod)
- $689,800.00
- Department Of Defense (Dod)
- FA480022F0177
- Removal Of Rubber From The Runway On Langley Air Force Base, Virginia.
- 25 Aug 2022
- Removal Of Rubber From The Runway On Langley Air Force Base, Virginia.
- Fa4800 633 Cons Pkp
- Department Of Defense (Dod)
- $689,800.00
- Department Of Defense (Dod)
- FA480023F0004
- This Project Is To Mill And Pave Inbound/Outbound Lanes Of Washington Blvd - Jefferson To Marshall And Restripe Pavement Markings.
- 25 Aug 2023
- This Project Is To Mill And Pave Inbound/Outbound Lanes Of Washington Blvd - Jefferson To Marshall And Restripe Pavement Markings.
- Fa4800 633 Cons Pkp
- Department Of Defense (Dod)
- $853,667.05
- Department Of Defense (Dod)
- FA480023F0004
- This Project Is To Mill And Pave Inbound/Outbound Lanes Of Washington Blvd - Jefferson To Marshall And Restripe Pavement Markings. This Modification Temporarily Suspends Work Due To Cooler Temperatures Not Conducive With Asphalt Paving.
- 11 Jan 2023
- This Project Is To Mill And Pave Inbound/Outbound Lanes Of Washington Blvd - Jefferson To Marshall And Restripe Pavement Markings. This Modification Temporarily Suspends Work Due To Cooler Temperatures Not Conducive With Asphalt Paving.
- Fa4800 633 Cons Pkp
- Department Of Defense (Dod)
- $853,667.05
- Department Of Defense (Dod)
- FA480023F0004
- This Project Mills And Paves The Inbound/Outbound Lanes Of Washington Blvd-Jefferson To Marshall And Restripes Pavement Markings.
- 16 Dec 2022
- This Project Mills And Paves The Inbound/Outbound Lanes Of Washington Blvd-Jefferson To Marshall And Restripes Pavement Markings.
- Fa4800 633 Cons Pkp
- Department Of Defense (Dod)
- $853,667.05
- Department Of Defense (Dod)
- FA480023F0004
- This Project Is To Mill And Pave Inbound/Outbound Lanes Of Washington Blvd - Jefferson To Marshall And Restripe Pavement Markings. The Period Of Performance Is Extended To 8/28/2023.
- 17 Apr 2023
- This Project Is To Mill And Pave Inbound/Outbound Lanes Of Washington Blvd - Jefferson To Marshall And Restripe Pavement Markings. The Period Of Performance Is Extended To 8/28/2023.
- Fa4800 633 Cons Pkp
- Department Of Defense (Dod)
- $853,667.05
- Department Of Defense (Dod)
- FA480022F0202
- The Original Award Required The Contractor To Repave The Parking Lot At F775. This Action, Modification 1 Adds An Emergency& Special Program (Esp) Code To The Line Of Accounting.
- 30 Sep 2022
- The Original Award Required The Contractor To Repave The Parking Lot At F775. This Action, Modification 1 Adds An Emergency& Special Program (Esp) Code To The Line Of Accounting.
- Fa4800 633 Cons Pkp
- Department Of Defense (Dod)
- $116,800.32
- Department Of Defense (Dod)
- FA480022F0183
- Contractor Shall Repair Installation Sanitary Sewer System, I&I Priority 1&2 West Area On Langley Afb.
- 25 Aug 2022
- Contractor Shall Repair Installation Sanitary Sewer System, I&I Priority 1&2 West Area On Langley Afb.
- Fa4800 633 Cons Pkp
- Department Of Defense (Dod)
- $599,266.83
- Department Of Defense (Dod)
- FA480022F0147
- Repair Concrete Slabs And Spalls At Taxiways A, D & M On Langley Afb. Period Of Performance Is 46 Calendar Days.
- 30 Jul 2022
- Repair Concrete Slabs And Spalls At Taxiways A, D & M On Langley Afb. Period Of Performance Is 46 Calendar Days.
- Fa4800 633 Cons Pkp
- Department Of Defense (Dod)
- $62,593.26
- Department Of Defense (Dod)
- W912QR23C0002
- Johnson County Phase Ii
- 15 Sep 2023
- Johnson County Phase Ii
- W072 Endist Huntington
- Department Of Defense (Dod)
- $11,732,870.85
- Department Of Defense (Dod)
- W912QR23C0002
- Johnson County Phase Ii
- 27 Sep 2023
- Johnson County Phase Ii
- W072 Endist Huntington
- Department Of Defense (Dod)
- $11,732,870.85
- Department Of Defense (Dod)