Jilk Heavy Construction, Inc.

CAGE Code: 1LW75

NCAGE Code: 1LW75

Status: Active

Type: Commercial Supplier

Dun & Bradstreet (DUNS): 945417632

CAGE 1LW75 Jilk Heavy Construction, Inc.
CAGE 1LW75 Jilk Heavy Construction, Inc.

Summary

Jilk Heavy Construction, Inc. is an Active Commercial Supplier with the Cage Code 1LW75 and is tracked by Dun & Bradstreet under DUNS Number 945417632..

Address

500 S Kraemer Blvd
Ste 380
Brea CA 92821-6779
United States

Points of Contact

Telephone:
3108306323
Fax:
3108352163
Jilk Heavy Construction, Inc. http://www.johnsmeek.com/

Related Information

Associated CAGE Codes People who viewed this 'CAGE Code' also viewed...

CAGE Code FAQ Frequently Asked Questions (FAQ) for CAGE 1LW75

What is CAGE Code 1LW75?
1LW75 is the unique identifier used by NATO Organizations to reference the physical entity known as Jilk Heavy Construction, Inc. located at 500 S Kraemer Blvd, Ste 380, Brea CA 92821-6779, United States.
Who is CAGE Code 1LW75?
1LW75 refers to Jilk Heavy Construction, Inc. located at 500 S Kraemer Blvd, Ste 380, Brea CA 92821-6779, United States.
Where is CAGE Code 1LW75 Located?
CAGE Code 1LW75 is located in Brea, CA, USA.

Contracting History for CAGE 1LW75 Contracting History for CAGE 1LW75 Most Recent 25 Records

140P2019C0043
Chis 174534 - Modification Three To Settle Request For Equitable Adjustment For Differing Site Conditions During Drilling Operations And Extend Pop For Scorpion Pier Replacement, Channel Islands National Park, Santa Cruz Island, Ventura California
3 Jun 2021
Dsc Contracting Services Division
Department Of The Interior (Doi)
$17,964,508.35
140P2019C0043
Chis 174534 - Modification P00007 - No-Cost-Time Extension Of Contract Completion Date For Scorpion Pier Replacement, Channel Islands National Park, Santa Cruz Island, Ventura California
21 Nov 2023
Dsc Contracting Services Division
Department Of The Interior (Doi)
$20,053,176.35
140P2019C0043
Chis 174534 - Modification P00006 - No-Cost-Time Extension Of Contract Completion Date For Scorpion Pier Replacement, Channel Islands National Park, Santa Cruz Island, Ventura California
18 Aug 2023
Dsc Contracting Services Division
Department Of The Interior (Doi)
$20,053,176.35
140P2019C0043
Chis 174534 - Scorpion Pier Replacement, Channel Islands National Park, Santa Cruz Island, Ventura California
30 Jul 2019
Dsc Contracting Services Division
Department Of The Interior (Doi)
$15,347,850.00
140P2019C0043
Chis 174534 - Modification Four-Power Lift System And Extend Pop For Scorpion Pier Replacement, Channel Islands National Park, Santa Cruz Island, Ventura California
19 Apr 2022
Dsc Contracting Services Division
Department Of The Interior (Doi)
$20,053,176.35
140P2019C0043
Chis 174534 - Modification One To Incorporate Approach Road Stone Redesign And Timber Support Bent Change For Scorpion Pier Replacement, Channel Islands National Park, Santa Cruz Island, Ventura California Modification No. 1 To Add Work To The Sco
3 Jun 2020
Dsc Contracting Services Division
Department Of The Interior (Doi)
$15,582,233.08
140P2019C0043
Chis 174534 - Modification Four-Power Lift System And Extend Pop For Scorpion Pier Replacement, Channel Islands National Park, Santa Cruz Island, Ventura California
16 May 2022
Dsc Contracting Services Division
Department Of The Interior (Doi)
$20,053,176.35
140P2019C0043
Chis 174534 - Modification Two To Incorporate A Change In The Boat Lift Location (To Pile 11, 2.7) And Extend Pop For Scorpion Pier Replacement, Channel Islands National Park, Santa Cruz Island, Ventura California
16 Sep 2020
Dsc Contracting Services Division
Department Of The Interior (Doi)
$15,601,103.08
W912PL15C0026
Igf::Ot::Igf Contract For Scour Protection At Prado Dam. Reference No. R00017 Wn024 Resolution Of Removal Of Riprap/Derrick See Page 2
14 Mar 2018
W075 Endist Los Angeles
Department Of Defense (Dod)
$27,722,040.48
W912PL15C0026
Igf::Ot::Igf Wn019 Sheet Pile Final Quantity Contractor Shall Provide A Credit For Actual Installed Quantity Of Sheet Pile.
27 Jun 2019
W075 Endist Los Angeles
Department Of Defense (Dod)
$27,924,617.48
W912PL15C0026
Igf:Ot::Igf Sarm Phase 5A N.Bank Protection. Contract For Scour Protection At Prado Dam. Reference No. R00018 Wn023 Trapezoidal Ditch Sd-04. Total Contract Price Is Increased By $9,891.06. The Contract Completion Date Shall Remain Unchanged By This Modification.
13 Jun 2018
W075 Endist Los Angeles
Department Of Defense (Dod)
$27,924,617.48
W912PL15C0026
Igf::Ot:Igf Sarm Phase 5A N.Bank Protection. Contract For Scour Protection At Prado Dam. Reference No. R00019 Wn022 Qty Variation Clin 0010 0046 Grubbing. The Contract Completion Date Shall Remain Unchanged By This Modification.Rubbing. Total Contract Price Is Increased By $50,933.10.
14 Jun 2018
W075 Endist Los Angeles
Department Of Defense (Dod)
$27,924,617.48
W912PL15C0026
Sarm Phase 5A N.Bank Protection
22 Jul 2020
W075 Endist Los Angeles
Department Of Defense (Dod)
$27,924,617.48
W912PL15C0026
Contract For Scour Protection At Prado Dam. Reference No. R00025 Wn036 K-Rails (Type K) Purchase Provide Material, Labor, And Equipment To: Put In 1480Lf Of K-Rails And Other Materials Such As Fence Panels, Orange Safety Fence To Maintain Temporary Bike Path. This Materials Will Be Remain The Property Of The Government After Execution Of This Change.
9 Apr 2020
W075 Endist Los Angeles
Department Of Defense (Dod)
$27,924,617.48
W912PL15C0026
Igf::Ot::Igf A. Scope Of Work Wn026 Resolution For 15' Maintenance Rd This Contract Action Is For Final The Resolution Of R00012 (Issued Unilateral) Dated June 14, 2017. This Contract Action Is A Bilateral. All Other Aspects Of R00012 Shall Remain In Place And No Changes Are Made To The Scope Of Work. Both Parties Agree That This Modification Is To Compensate The Contractor For Additional Finish Efforts Of Top Of Slope And Additional Contouring Efforts Required At Drainage Structures, Due To The Change In Design. B. Change In Contract Price Total Contract Price Is Increased By $85,965.37. New Clins Clin Unit Change No. Description Quantity Price Amount 0076 Resolution For 15' Maintenance Rd 1.00 Ja $85,965.37 $85,965.37 Total Change Amount $85,965.37 C. Change In Contract Time The Contract Completion Date Shall Remain Unchanged By This Modification. D. Closing Statement It Is Understood And Agreed That Pursuant To The Above, The Contract Time Is Not Affected, And The Contract Price Is Increased As Stated Above, Which Reflects All Credits Due The Government And All Debits Due The Contractor. It Is Further Understood And Agreed That This Adjustment Constitutes Compensation In Full On Behalf Of The Contractor And Its Subcontractors And Suppliers For All Costs And Markups Directly Or Indirectly Attributable For The Change Ordered, For All Delays Related Thereto, For All Extended Overhead C And For Performance Of The Change Within The Time Frame Stated.
27 Aug 2018
W075 Endist Los Angeles
Department Of Defense (Dod)
$27,924,617.48