R-Con Construction Inc
CAGE Code: 1L0D3
NCAGE Code: 1L0D3
Status: Active
Type: Commercial Supplier
Dun & Bradstreet (DUNS): 077650872
Summary
R-Con Construction Inc is an Active Commercial Supplier with the Cage Code 1L0D3 and is tracked by Dun & Bradstreet under DUNS Number 077650872..
Address
3401 Montecito Ct
Las Cruces NM 88011-1662
United States
Points of Contact
No Points of Contact...
Related Information
People who viewed this 'CAGE Code' also viewed...
Shouman Associates Engineering Woodcraft Inc. Central Fire And Safety Mevatec Corp P D Q Services Inc Moultons Dive And Travel Moulton Rmpersonnel Inc New Mexico State University Soil And West-Star Consultants Donohue Inc/Ensoft Smith And Aguirre Construction Black Hawk Roofing Price Lawn Service And Dirt Work Orthopedic Specialties, Inc. Nandez Foods Inc Expand Your Markets Ag Equipment, Llc Desert Winds Landscaping Co Ruidoso Taxicab Inc Tome Computer Service
Frequently Asked Questions (FAQ) for CAGE 1L0D3
- What is CAGE Code 1L0D3?
- 1L0D3 is the unique identifier used by NATO Organizations to reference the physical entity known as R-Con Construction Inc located at 3401 Montecito Ct, Las Cruces NM 88011-1662, United States.
- Who is CAGE Code 1L0D3?
- 1L0D3 refers to R-Con Construction Inc located at 3401 Montecito Ct, Las Cruces NM 88011-1662, United States.
- Where is CAGE Code 1L0D3 Located?
- CAGE Code 1L0D3 is located in Las Cruces, NM, USA.
Contracting History for CAGE 1L0D3 Most Recent 25 Records
- FA480123F0125
- Repair Water Meters Multiple Locations
- 23 Aug 2023
- Repair Water Meters Multiple Locations
- Fa4801 49 Cons Pk
- Department Of Defense (Dod)
- $282,473.92
- Department Of Defense (Dod)
- FA480123F0141
- Repair Generator, Airfield Lighting, B863
- 7 Sep 2023
- Repair Generator, Airfield Lighting, B863
- Fa4801 49 Cons Pk
- Department Of Defense (Dod)
- $273,793.82
- Department Of Defense (Dod)
- FA480123C0010
- Eradicate And Apply New Flight Line Stripping At Holloman Afb.
- 26 Jul 2023
- Eradicate And Apply New Flight Line Stripping At Holloman Afb.
- Fa4801 49 Cons Pk
- Department Of Defense (Dod)
- $68,968.91
- Department Of Defense (Dod)
- FA480123C0010
- Mod To Remove Slurry And Curing From Air Field. The Additional Work Allows For The Completion Of The Original Soo.
- 12 Sep 2023
- Mod To Remove Slurry And Curing From Air Field. The Additional Work Allows For The Completion Of The Original Soo.
- Fa4801 49 Cons Pk
- Department Of Defense (Dod)
- $68,968.91
- Department Of Defense (Dod)
- FA480123F0098
- Pop Extension From 60 Days To 150 Days
- 11 Aug 2023
- Pop Extension From 60 Days To 150 Days
- Fa4801 49 Cons Pk
- Department Of Defense (Dod)
- $1,075,099.98
- Department Of Defense (Dod)
- FA480123F0098
- Repair Hanger Doors B1090
- 24 Jul 2023
- Repair Hanger Doors B1090
- Fa4801 49 Cons Pk
- Department Of Defense (Dod)
- $1,075,099.98
- Department Of Defense (Dod)
- FA480123F0041
- Repair Of Restroom In Bldg 202 Holloman Afb
- 27 Feb 2023
- Repair Of Restroom In Bldg 202 Holloman Afb
- Fa4801 49 Cons Pk
- Department Of Defense (Dod)
- $218,432.19
- Department Of Defense (Dod)
- FA480123F0017
- The Purpose Of This Project Is To Repair Flood Damage In B55
- 12 Jan 2023
- The Purpose Of This Project Is To Repair Flood Damage In B55
- Fa4801 49 Cons Pk
- Department Of Defense (Dod)
- $661,253.88
- Department Of Defense (Dod)
- FA480123F0017
- Add With-In Scope Work Iaw Sow Dated 16 August 2023.
- 26 Sep 2023
- Add With-In Scope Work Iaw Sow Dated 16 August 2023.
- Fa4801 49 Cons Pk
- Department Of Defense (Dod)
- $690,474.36
- Department Of Defense (Dod)
- FA480123F0016
- Repair Fire Suppression System, Nrtf
- 12 Jan 2023
- Repair Fire Suppression System, Nrtf
- Fa4801 49 Cons Pk
- Department Of Defense (Dod)
- $1,658,406.26
- Department Of Defense (Dod)
- FA480123F0017
- Pop Extension
- 27 Sep 2023
- Pop Extension
- Fa4801 49 Cons Pk
- Department Of Defense (Dod)
- $690,474.36
- Department Of Defense (Dod)
- FA480123F0009
- Remove And Replace The Existing Main Entrance Doors At The Shoppette And Bx Food Court (Bldgs. 33 And 227) In Accordance With The Statement Of Work Dated 14 November 2022.
- 29 Nov 2022
- Remove And Replace The Existing Main Entrance Doors At The Shoppette And Bx Food Court (Bldgs. 33 And 227) In Accordance With The Statement Of Work Dated 14 November 2022.
- Fa4801 49 Cons Pk
- Department Of Defense (Dod)
- $78,035.10
- Department Of Defense (Dod)
- FA480123F0009
- Time Extension
- 25 May 2023
- Time Extension
- Fa4801 49 Cons Pk
- Department Of Defense (Dod)
- $78,035.10
- Department Of Defense (Dod)
- FA480122F0132
- Time Extension Due To Manufacturer Delay
- 18 Apr 2023
- Time Extension Due To Manufacturer Delay
- Fa4801 49 Cons Pk
- Department Of Defense (Dod)
- $1,112,019.81
- Department Of Defense (Dod)
- FA480122F0132
- Repair Pump House
- 14 Sep 2022
- Repair Pump House
- Fa4801 49 Cons Pk
- Department Of Defense (Dod)
- $1,112,019.81
- Department Of Defense (Dod)
- FA480123F0005
- 60 Day Pop Extension
- 28 Apr 2023
- 60 Day Pop Extension
- Fa4801 49 Cons Pk
- Department Of Defense (Dod)
- $657,138.64
- Department Of Defense (Dod)
- FA480123F0005
- Mod Is To Incorporate A No-Cost Change To The Statement Of Objective.
- 19 Dec 2022
- Mod Is To Incorporate A No-Cost Change To The Statement Of Objective.
- Fa4801 49 Cons Pk
- Department Of Defense (Dod)
- $657,138.64
- Department Of Defense (Dod)
- FA480123F0005
- Extension On Pop To Complete Work On Fence Around Pol Fields.
- 12 Jul 2023
- Extension On Pop To Complete Work On Fence Around Pol Fields.
- Fa4801 49 Cons Pk
- Department Of Defense (Dod)
- $657,138.64
- Department Of Defense (Dod)
- FA480123F0005
- Repair Main Fuels Yard And West Fuels Yard By Addition On At/Fp Cable Barrier On To Existing Fencing And Repair Fence As Necessary And Identified In Statement Of Objectives Dated 11 August 2022.
- 20 Oct 2022
- Repair Main Fuels Yard And West Fuels Yard By Addition On At/Fp Cable Barrier On To Existing Fencing And Repair Fence As Necessary And Identified In Statement Of Objectives Dated 11 August 2022.
- Fa4801 49 Cons Pk
- Department Of Defense (Dod)
- $657,138.64
- Department Of Defense (Dod)
- FA480122F0111
- Repair Fire Suppression Nrtf B5042 - Time Extension
- 16 Mar 2023
- Repair Fire Suppression Nrtf B5042 - Time Extension
- Fa4801 49 Cons Pk
- Department Of Defense (Dod)
- $482,995.08
- Department Of Defense (Dod)
- FA480122F0111
- Repair Fire Suppression Nrtf Bldg. 5042
- 23 Aug 2022
- Repair Fire Suppression Nrtf Bldg. 5042
- Fa4801 49 Cons Pk
- Department Of Defense (Dod)
- $482,995.08
- Department Of Defense (Dod)
- FA480122F0070
- Repair 2X Ops Desk B892
- 8 Jun 2022
- Repair 2X Ops Desk B892
- Fa4801 49 Cons Pk
- Department Of Defense (Dod)
- $98,747.17
- Department Of Defense (Dod)
- FA480122F0070
- Repair Ops Desk, B832
- 30 May 2023
- Repair Ops Desk, B832
- Fa4801 49 Cons Pk
- Department Of Defense (Dod)
- $104,295.94
- Department Of Defense (Dod)
- FA480122F0069
- Kwrd 21-0091 Repair Perimeter Fence
- 2 Jun 2022
- Kwrd 21-0091 Repair Perimeter Fence
- Fa4801 49 Cons Pk
- Department Of Defense (Dod)
- $841,069.12
- Department Of Defense (Dod)
- FA480122F0069
- Add Fencing West Of Lake Holloman In Accordance With The Soo Dated 30 June 2022.
- 7 Sep 2022
- Add Fencing West Of Lake Holloman In Accordance With The Soo Dated 30 June 2022.
- Fa4801 49 Cons Pk
- Department Of Defense (Dod)
- $968,567.86
- Department Of Defense (Dod)