R.C.S. Construction, Inc.
CAGE Code: 1DYK4
NCAGE Code: 1DYK4
Status: Active
Type: Commercial Supplier
Dun & Bradstreet (DUNS): 785342361
Summary
R.C.S. Construction, Inc. is an Active Commercial Supplier with the Cage Code 1DYK4 and is tracked by Dun & Bradstreet under DUNS Number 785342361..
Address
1314 Fountain Pl
Rapid City SD 57702-8522
United States
Points of Contact
Related Information
People who viewed this 'CAGE Code' also viewed...
Missouri Breaks Computers Metwerks Llc Fastenal Co Caseys Corner Inc Micro Solutions, Inc. Kramer Laundry And Equipment Tordsen Floorcovering Nordic Enterprises Icehouse Inc The Starwest Wiper Garlin Rehabilitation Services Temperature Technology, Inc. Cititech Systems, Inc Fosha, Rose Heavy Constructors, Inc. Envirolawns Rapid City Winair Co. Carrolls Appliance And Vacuums Amber Aqua, Llc Dakota Daughters
Frequently Asked Questions (FAQ) for CAGE 1DYK4
- What is CAGE Code 1DYK4?
- 1DYK4 is the unique identifier used by NATO Organizations to reference the physical entity known as R.C.S. Construction, Inc. located at 1314 Fountain Pl, Rapid City SD 57702-8522, United States.
- Who is CAGE Code 1DYK4?
- 1DYK4 refers to R.C.S. Construction, Inc. located at 1314 Fountain Pl, Rapid City SD 57702-8522, United States.
- Where is CAGE Code 1DYK4 Located?
- CAGE Code 1DYK4 is located in Rapid City, SD, USA.
Contracting History for CAGE 1DYK4 Most Recent 25 Records
- 75H70122C00013
- Usp 797/800 Pine Ridge Pharmacy Remodel Construction Project
- 6 Jun 2023
- Usp 797/800 Pine Ridge Pharmacy Remodel Construction Project
- Div Of Engineering Svcs - Seattle
- Department Of Health And Human Services (Hhs)
- $3,716,000.00
- Department Of Health And Human Services (Hhs)
- 75H70122C00013
- Usp 797/800 Pine Ridge Pharmacy Remodel Construction Project
- 1 Jun 2023
- Usp 797/800 Pine Ridge Pharmacy Remodel Construction Project
- Div Of Engineering Svcs - Seattle
- Department Of Health And Human Services (Hhs)
- $3,678,688.00
- Department Of Health And Human Services (Hhs)
- 75H70122C00013
- Usp 797/800 Pine Ridge Pharmacy Remodel Construction Project
- 6 Feb 2023
- Usp 797/800 Pine Ridge Pharmacy Remodel Construction Project
- Div Of Engineering Svcs - Seattle
- Department Of Health And Human Services (Hhs)
- $3,678,688.00
- Department Of Health And Human Services (Hhs)
- 75H70122C00013
- Usp 797/800 Pine Ridge Pharmacy Remodel Construction Project
- 6 Jul 2023
- Usp 797/800 Pine Ridge Pharmacy Remodel Construction Project
- Div Of Engineering Svcs - Seattle
- Department Of Health And Human Services (Hhs)
- $3,774,287.00
- Department Of Health And Human Services (Hhs)
- 75H70122C00013
- Usp 797/800 Pine Ridge Pharmacy Remodel Construction Project
- 6 Sep 2022
- Usp 797/800 Pine Ridge Pharmacy Remodel Construction Project
- Div Of Engineering Svcs - Seattle
- Department Of Health And Human Services (Hhs)
- $3,621,000.00
- Department Of Health And Human Services (Hhs)
- 140F0121C0051
- Construct New Shop Bldg, Dc Booth Nfh Construct New Shop And Storage Building Shall Be A Single Story, Pre-Engineered Metal Building Containing A Wood Shop Area, Restroom, Paint Storage Area, A General Storage Bay And A Large Vehicle Bay For Storage
- 13 Oct 2022
- Construct New Shop Bldg, Dc Booth Nfh Construct New Shop And Storage Building Shall Be A Single Story, Pre-Engineered Metal Building Containing A Wood Shop Area, Restroom, Paint Storage Area, A General Storage Bay And A Large Vehicle Bay For Storage
- Fws, Construction A/E Team 1
- Department Of The Interior (Doi)
- $1,320,139.61
- Department Of The Interior (Doi)
- 140F0121C0051
- Construct New Shop Bldg, Dc Booth Nfh Construct New Shop And Storage Building Shall Be A Single Story, Pre-Engineered Metal Building Containing A Wood Shop Area, Restroom, Paint Storage Area, A General Storage Bay And A Large Vehicle Bay For Storage
- 7 Nov 2022
- Construct New Shop Bldg, Dc Booth Nfh Construct New Shop And Storage Building Shall Be A Single Story, Pre-Engineered Metal Building Containing A Wood Shop Area, Restroom, Paint Storage Area, A General Storage Bay And A Large Vehicle Bay For Storage
- Fws, Construction A/E Team 1
- Department Of The Interior (Doi)
- $1,320,139.61
- Department Of The Interior (Doi)
- 140F0121C0051
- Construct New Shop Bldg, Dc Booth Nfh Construct New Shop And Storage Building Shall Be A Single Story, Pre-Engineered Metal Building Containing A Wood Shop Area, Restroom, Paint Storage Area, A General Storage Bay And A Large Vehicle Bay For Storage
- 26 Aug 2021
- Construct New Shop Bldg, Dc Booth Nfh Construct New Shop And Storage Building Shall Be A Single Story, Pre-Engineered Metal Building Containing A Wood Shop Area, Restroom, Paint Storage Area, A General Storage Bay And A Large Vehicle Bay For Storage
- Fws Pacific Regional Office
- Department Of The Interior (Doi)
- $1,320,139.61
- Department Of The Interior (Doi)
- 140F0121C0051
- Construct New Shop Bldg, Dc Booth Nfh Construct New Shop And Storage Building Shall Be A Single Story, Pre-Engineered Metal Building Containing A Wood Shop Area, Restroom, Paint Storage Area, A General Storage Bay And A Large Vehicle Bay For Storage
- 21 Apr 2022
- Construct New Shop Bldg, Dc Booth Nfh Construct New Shop And Storage Building Shall Be A Single Story, Pre-Engineered Metal Building Containing A Wood Shop Area, Restroom, Paint Storage Area, A General Storage Bay And A Large Vehicle Bay For Storage
- Fws Pacific Regional Office
- Department Of The Interior (Doi)
- $1,316,961.35
- Department Of The Interior (Doi)
- 6982AF19C000009
- Sd Ftnp Badl 10(9A) Badlands Bison Gates This Contract Modification Includes Reduction Of The Cattle Guard Required Drive Length From 18 Feet To 16 Feet At Stations 477+00, 666+00 And 432+00. The Change In Contract Value As A Result Of This Modification Is $-15,005.98. This Modification Does Not Change The Fixed Completion Date Of May 3,2019.
- 20 Mar 2019
- Sd Ftnp Badl 10(9A) Badlands Bison Gates This Contract Modification Includes Reduction Of The Cattle Guard Required Drive Length From 18 Feet To 16 Feet At Stations 477+00, 666+00 And 432+00. The Change In Contract Value As A Result Of This Modification Is $-15,005.98. This Modification Does Not Change The Fixed Completion Date Of May 3,2019.
- Fhwa - Central Federal Lands Divisi
- Department Of Transportation (Dot)
- $235,477.39
- Department Of Transportation (Dot)
- 6982AF19C000009
- Sd Ftnp Badl 10(9A) Badlands Bison Gates This Contract Modification Includes Sub-Excavation To Be Performed Below The Proposed Cattleguards Located At Stations 432+00, 477+00 And Station 666+00. The Change In Contract Value As A Result Of This Modification Is $8,416.73. The Modification Extends The Contract Completion Date By Three Days To 5/3/2019.
- 19 Mar 2019
- Sd Ftnp Badl 10(9A) Badlands Bison Gates This Contract Modification Includes Sub-Excavation To Be Performed Below The Proposed Cattleguards Located At Stations 432+00, 477+00 And Station 666+00. The Change In Contract Value As A Result Of This Modification Is $8,416.73. The Modification Extends The Contract Completion Date By Three Days To 5/3/2019.
- Fhwa - Central Federal Lands Divisi
- Department Of Transportation (Dot)
- $250,483.37
- Department Of Transportation (Dot)
- 6982AF19C000009
- Sd Ftnp Badl 10(9A) Badlands Bison Gates The Purpose Of This Modification Is To Deobligate Funds And Close Out The Contract.
- 11 Jul 2019
- Sd Ftnp Badl 10(9A) Badlands Bison Gates The Purpose Of This Modification Is To Deobligate Funds And Close Out The Contract.
- Fhwa - Central Federal Lands Divisi
- Department Of Transportation (Dot)
- $237,253.49
- Department Of Transportation (Dot)
- HHSI161201700003C
- Igf::Ot::Igf Pine Ridge Quarters Apartment Building
- 11 Apr 2018
- Igf::Ot::Igf Pine Ridge Quarters Apartment Building
- Div Of Engineering Svcs - Dallas
- Department Of Health And Human Services (Hhs)
- $4,552,534.37
- Department Of Health And Human Services (Hhs)
- 6982AF19C000009
- Sd Ftnp Badl 10(9A) Badlands Bison Gates. This Contract Modification Includes Additional Sub-Excavation To Be Performed Below The Proposed Cattleguards Located At Stations 477+00 And Station 432+00 Due To Differing Site Conditions. The Change In Contract Value Of This Contract Modification Is $3,880.40 And Does Not Change The Fixed Completion Date Of May 03,2019.
- 7 May 2019
- Sd Ftnp Badl 10(9A) Badlands Bison Gates. This Contract Modification Includes Additional Sub-Excavation To Be Performed Below The Proposed Cattleguards Located At Stations 477+00 And Station 432+00 Due To Differing Site Conditions. The Change In Contract Value Of This Contract Modification Is $3,880.40 And Does Not Change The Fixed Completion Date Of May 03,2019.
- Fhwa - Central Federal Lands Divisi
- Department Of Transportation (Dot)
- $239,357.79
- Department Of Transportation (Dot)
- AG82A7C170027
- Igf::Ot::Igf For Other Functions - Emergency Excavation And Repair Of Busted Water Main - Boxelder Job Corps Center. Modification To Close Out The Contract.
- 19 Jun 2018
- Igf::Ot::Igf For Other Functions - Emergency Excavation And Repair Of Busted Water Main - Boxelder Job Corps Center. Modification To Close Out The Contract.
- Usda Forest Service
- Department Of Agriculture (Usda)
- $7,000.00
- Department Of Agriculture (Usda)
- 6982AF19C000009
- Sd Ftnp Badl 10(9A) Badlands Bison Gates Obligation Of Funds For The Construction Contract 6982Af18b000030
- 18 Jan 2019
- Sd Ftnp Badl 10(9A) Badlands Bison Gates Obligation Of Funds For The Construction Contract 6982Af18b000030
- Fhwa - Central Federal Lands Divisi
- Department Of Transportation (Dot)
- $237,253.49
- Department Of Transportation (Dot)
- 6982AF19C000009
- Sd Ftnp Badl 10(9A) Badlands Bison Gates This Contract Modification Reduces The Cattle Guard Required Width From 30 Feet To 28. This Modification Decreases The Contract Amount By $1,880.26.
- 15 Mar 2019
- Sd Ftnp Badl 10(9A) Badlands Bison Gates This Contract Modification Reduces The Cattle Guard Required Width From 30 Feet To 28. This Modification Decreases The Contract Amount By $1,880.26.
- 6982Af Central Federal Lands Divisi
- Department Of Transportation (Dot)
- $237,253.49
- Department Of Transportation (Dot)