Reams Enterprises Inc.
CAGE Code: 1CHQ7
NCAGE Code: 1CHQ7
Status: Active
Type: Commercial Supplier
Dun & Bradstreet (DUNS): 625290663
Summary
Reams Enterprises Inc. is an Active Commercial Supplier with the Cage Code 1CHQ7 and is tracked by Dun & Bradstreet under DUNS Number 625290663..
Address
847 Walnut St
Macon GA 31201-2617
United States
Points of Contact
- Telephone:
- 4046842500
- Fax:
- 4046840607
Related Information
People who viewed this 'CAGE Code' also viewed...
Frederica & Company Landscaping Accu-Ruler Tyner Transport Co, Inc Aries Investments & Properties, Llc Dictaphone Corp Sub Of Pitney Bowes Acme Business Products Co Electrical Contractors Of Macon, R C E Of Macon Superior Maple Hill Landfill Rstl Inc. Grainger W W Inc Wheelers Mfg Co Inc Stewart Equipment Inc J T Industrial Contractor Inc Cablerep Advertising, Inc. Mcc Industrial, Inc Simplexgrinnell Engineering & Analytical Services Industrial Fastening Supplies, Inc. Shadburn, W H Inc
Frequently Asked Questions (FAQ) for CAGE 1CHQ7
- What is CAGE Code 1CHQ7?
- 1CHQ7 is the unique identifier used by NATO Organizations to reference the physical entity known as Reams Enterprises Inc. located at 847 Walnut St, Macon GA 31201-2617, United States.
- Who is CAGE Code 1CHQ7?
- 1CHQ7 refers to Reams Enterprises Inc. located at 847 Walnut St, Macon GA 31201-2617, United States.
- Where is CAGE Code 1CHQ7 Located?
- CAGE Code 1CHQ7 is located in Macon, GA, USA.
Contracting History for CAGE 1CHQ7 Most Recent 25 Records
- W9124923F0267
- B21608 Replace Roof
- 28 Sep 2023
- B21608 Replace Roof
- W6qm Micc-Ft Eisenhower
- Department Of Defense (Dod)
- $4,306,609.00
- Department Of Defense (Dod)
- W9124923F0267
- Option Clins Changed To Base Clins.
- 29 Sep 2023
- Option Clins Changed To Base Clins.
- W6qm Micc-Ft Eisenhower
- Department Of Defense (Dod)
- $4,306,609.00
- Department Of Defense (Dod)
- W9124C23F0056
- Bldg2603 Roof Replacement Toipr0049-Contractor Shall Provide All Labor, Equipment, Supplies, Material & Coordination Required To Remove/Replace Roof & Light Protection Systems.
- 24 Aug 2023
- Bldg2603 Roof Replacement Toipr0049-Contractor Shall Provide All Labor, Equipment, Supplies, Material & Coordination Required To Remove/Replace Roof & Light Protection Systems.
- W6qm Micc-Ft Jackson
- Department Of Defense (Dod)
- $1,657,501.86
- Department Of Defense (Dod)
- W9124C23F0051
- Topr0047 Bldg5700 Parking Lot - Resurfacing Preservation Of The Parking Lot, Entrance Roads, And Drive-Thru Area. Contractor Responsible For Verifying All Measurements. All Work Shall Adhere To Guidelines Specified In Applicable Regulations & Codes.
- 22 Aug 2023
- Topr0047 Bldg5700 Parking Lot - Resurfacing Preservation Of The Parking Lot, Entrance Roads, And Drive-Thru Area. Contractor Responsible For Verifying All Measurements. All Work Shall Adhere To Guidelines Specified In Applicable Regulations & Codes.
- W6qm Micc-Ft Jackson
- Department Of Defense (Dod)
- $1,037,206.41
- Department Of Defense (Dod)
- W9124C23F0055
- Various Elevators-Topr0045: The Contractor Shall Provide All Labor, Equipment, Supplies, Material, And Coordination Required To Repair Three Elevators.
- 16 Aug 2023
- Various Elevators-Topr0045: The Contractor Shall Provide All Labor, Equipment, Supplies, Material, And Coordination Required To Repair Three Elevators.
- W6qm Micc-Ft Jackson
- Department Of Defense (Dod)
- $499,165.62
- Department Of Defense (Dod)
- W9124C23F0045
- Cep 3 Mtw Headers - Topr0041: Provide All Labor, Equipment, Supplies, Material, And Coordination Required To Reconfigure The Mtw Supply And Return Headers And Valves To Allow Isolation Of Individual Pieces Of Plant Equipment.
- 24 Jul 2023
- Cep 3 Mtw Headers - Topr0041: Provide All Labor, Equipment, Supplies, Material, And Coordination Required To Reconfigure The Mtw Supply And Return Headers And Valves To Allow Isolation Of Individual Pieces Of Plant Equipment.
- W6qm Micc-Ft Jackson
- Department Of Defense (Dod)
- $140,087.12
- Department Of Defense (Dod)
- W9124C23F0043
- Various Doors Repair/Replace Topr0038: The Contractor Shall Provide All Labor, Equipment, Supplies, Material, And Coordination Required To Repair Or Replace Doors As Identified In Sow.
- 25 Jul 2023
- Various Doors Repair/Replace Topr0038: The Contractor Shall Provide All Labor, Equipment, Supplies, Material, And Coordination Required To Repair Or Replace Doors As Identified In Sow.
- W6qm Micc-Ft Jackson
- Department Of Defense (Dod)
- $674,714.40
- Department Of Defense (Dod)
- W9124C23F0042
- B4295 Between Occupancy Maintenance-Topr0037: The Contractor Shall Restore Wall Finishes, Anti-Slip Finishes On Stairs, And Polish Terrazzo Flooring. All Work Shall Adhere To Guidelines Specified In Applicable Regulations And Codes.
- 27 Jul 2023
- B4295 Between Occupancy Maintenance-Topr0037: The Contractor Shall Restore Wall Finishes, Anti-Slip Finishes On Stairs, And Polish Terrazzo Flooring. All Work Shall Adhere To Guidelines Specified In Applicable Regulations And Codes.
- W6qm Micc-Ft Jackson
- Department Of Defense (Dod)
- $539,754.40
- Department Of Defense (Dod)
- W9124C23F0047
- Topr0040 Btx Upgrade- Contractor Shall Provide All Labor, Equipment, Supplies, Material, And Coordination Required To Design And Install Fire Alarm Infrastructure, Equipment, And Systems At Multiple Buildings On Fort Jackson.
- 27 Jul 2023
- Topr0040 Btx Upgrade- Contractor Shall Provide All Labor, Equipment, Supplies, Material, And Coordination Required To Design And Install Fire Alarm Infrastructure, Equipment, And Systems At Multiple Buildings On Fort Jackson.
- W6qm Micc-Ft Jackson
- Department Of Defense (Dod)
- $289,422.61
- Department Of Defense (Dod)
- W9124C23F0041
- Topr0036 Contractor Shall Provide All Labor, Equipment, Supplies, Material, And Coordination Required To Install A Drainage Trough, Install A Solid Base, And Repair Leaking Drain Lines For Washing Machines In The Laundry Facilities In Both Buildings.
- 20 Jul 2023
- Topr0036 Contractor Shall Provide All Labor, Equipment, Supplies, Material, And Coordination Required To Install A Drainage Trough, Install A Solid Base, And Repair Leaking Drain Lines For Washing Machines In The Laundry Facilities In Both Buildings.
- W6qm Micc-Ft Jackson
- Department Of Defense (Dod)
- $145,327.36
- Department Of Defense (Dod)
- W9124C22F0065
- 4282 Replacement Ahu Corrrected Pop Date.
- 11 Apr 2023
- 4282 Replacement Ahu Corrrected Pop Date.
- W6qm Micc-Ft Jackson
- Department Of Defense (Dod)
- $1,543,860.40
- Department Of Defense (Dod)
- W9124C22F0065
- Mod01 Pop Extension For 4282 Replacement Ahu Topr0029: Extend Delivery Date To Now Read 15 May 2023 At No Cost To The Government. The Delivery Date For The Approved Hvac Equipment Was Delayed Due To Manufacture And Material Supply Chain Shortages.
- 11 Apr 2023
- Mod01 Pop Extension For 4282 Replacement Ahu Topr0029: Extend Delivery Date To Now Read 15 May 2023 At No Cost To The Government. The Delivery Date For The Approved Hvac Equipment Was Delayed Due To Manufacture And Material Supply Chain Shortages.
- W6qm Micc-Ft Jackson
- Department Of Defense (Dod)
- $1,543,860.40
- Department Of Defense (Dod)
- W9124C22F0066
- Mod01 B2601 Ahu Replacement- The Contractor Shall Increase The Size Of Ahu 1 From 12.5 Ton To A 32 Ton, Increase Size Ahu 2 From 12.5 Ton To A 44 Ton And Uv1 From 25 Ton To A 69 Ton Iaw Updated Sow.
- 9 Jun 2023
- Mod01 B2601 Ahu Replacement- The Contractor Shall Increase The Size Of Ahu 1 From 12.5 Ton To A 32 Ton, Increase Size Ahu 2 From 12.5 Ton To A 44 Ton And Uv1 From 25 Ton To A 69 Ton Iaw Updated Sow.
- W6qm Micc-Ft Jackson
- Department Of Defense (Dod)
- $1,373,421.66
- Department Of Defense (Dod)
- W9124C22F0054
- Mod02 Sprc Building Conversion Equitable Adjustment For An Unforeseen Space Layout Change Order And To Extend The Delivery Date.
- 23 Mar 2023
- Mod02 Sprc Building Conversion Equitable Adjustment For An Unforeseen Space Layout Change Order And To Extend The Delivery Date.
- W6qm Micc-Ft Jackson
- Department Of Defense (Dod)
- $1,600,289.51
- Department Of Defense (Dod)
- W9124C22F0054
- Mod01 Sprc Building Conversion Topr0032, The Purpose For This Modification Is For An Unforeseen Space Layout Change And To Extend The Delivery Date.
- 17 Mar 2023
- Mod01 Sprc Building Conversion Topr0032, The Purpose For This Modification Is For An Unforeseen Space Layout Change And To Extend The Delivery Date.
- W6qm Micc-Ft Jackson
- Department Of Defense (Dod)
- $1,600,289.51
- Department Of Defense (Dod)
- W9124C22F0035
- Dfac 11500&10540 Various Discrepancy Repairs - Topr0009: Work Includes: Aesthetic, Electrical, Plumbing Repairs/Replacement To Address Several Work Request For The 165Th Dfacs 11500 & 10540.
- 15 Jul 2022
- Dfac 11500&10540 Various Discrepancy Repairs - Topr0009: Work Includes: Aesthetic, Electrical, Plumbing Repairs/Replacement To Address Several Work Request For The 165Th Dfacs 11500 & 10540.
- W6qm Micc-Ft Jackson
- Department Of Defense (Dod)
- $459,520.98
- Department Of Defense (Dod)
- W9124921F0256
- De-04990-9P Little Smoak
- 27 Sep 2021
- De-04990-9P Little Smoak
- W6qm Micc-Ft Gordon
- Department Of Defense (Dod)
- $1,358,260.76
- Department Of Defense (Dod)
- W9124921F0256
- De-04990-9P Little Smoak
- 19 Dec 2022
- De-04990-9P Little Smoak
- W6qm Micc-Ft Gordon
- Department Of Defense (Dod)
- $1,358,260.76
- Department Of Defense (Dod)
- W9124921F0234
- Dj50555-8P Replace Glass Wall B21608
- 8 May 2023
- Dj50555-8P Replace Glass Wall B21608
- W6qm Micc-Ft Gordon
- Department Of Defense (Dod)
- $688,173.17
- Department Of Defense (Dod)
- W9124921F0234
- Project: Dj50555 Replace Glass Wall
- 21 Sep 2021
- Project: Dj50555 Replace Glass Wall
- W6qm Micc-Ft Gordon
- Department Of Defense (Dod)
- $688,173.17
- Department Of Defense (Dod)
- W9124921F0234
- Dj50555-8P Replace Glass Wall B21608
- 3 Mar 2023
- Dj50555-8P Replace Glass Wall B21608
- W6qm Micc-Ft Gordon
- Department Of Defense (Dod)
- $688,173.17
- Department Of Defense (Dod)
- 140FGA23D0127
- Multiple Award Task Order Contract (Matoc) For Design-Build Construction Services For The Department Of Interior And Forest Service
- 28 Mar 2023
- Multiple Award Task Order Contract (Matoc) For Design-Build Construction Services For The Department Of Interior And Forest Service
- Fws, Gaoa
- Department Of The Interior (Doi)
- $500.00
- Department Of The Interior (Doi)
- W9124921F0201
- De-04979-9P Carter Road Landfill Closure And 17Th Street Methane Ventilation
- 16 Sep 2021
- De-04979-9P Carter Road Landfill Closure And 17Th Street Methane Ventilation
- W6qm Micc-Ft Eisenhower
- Department Of Defense (Dod)
- $2,918,444.00
- Department Of Defense (Dod)
- W9124921F0201
- De-04979-9P Carter Road Landfill Closure
- 6 Oct 2021
- De-04979-9P Carter Road Landfill Closure
- W6qm Micc-Ft Gordon
- Department Of Defense (Dod)
- $2,918,444.00
- Department Of Defense (Dod)
- W9124921F0201
- De-04979-9P Carter Road Landfill Closure
- 7 Jun 2022
- De-04979-9P Carter Road Landfill Closure
- W6qm Micc-Ft Gordon
- Department Of Defense (Dod)
- $2,918,444.00
- Department Of Defense (Dod)