Pettibone Concrete Construction Inc

CAGE Code: 1BFN3

NCAGE Code: 1BFN3

Status: Active

Type: Commercial Supplier

Dun & Bradstreet (DUNS): 949585699

Summary

Pettibone Concrete Construction Inc is an Active Commercial Supplier with the Cage Code 1BFN3 and is tracked by Dun & Bradstreet under DUNS Number 949585699..

Address

1621 Transmitter Rd
Panama City FL 32404-3149
United States

Points of Contact

Telephone:
8507631881
Fax:
8507636779

Related Information

Associated CAGE Codes People who viewed this 'CAGE Code' also viewed...

CAGE Code FAQ Frequently Asked Questions (FAQ) for CAGE 1BFN3

What is CAGE Code 1BFN3?
1BFN3 is the unique identifier used by NATO Organizations to reference the physical entity known as Pettibone Concrete Construction Inc located at 1621 Transmitter Rd, Panama City FL 32404-3149, United States.
Who is CAGE Code 1BFN3?
1BFN3 refers to Pettibone Concrete Construction Inc located at 1621 Transmitter Rd, Panama City FL 32404-3149, United States.
Where is CAGE Code 1BFN3 Located?
CAGE Code 1BFN3 is located in Panama City, FL, USA.

Contracting History for CAGE 1BFN3 Contracting History for CAGE 1BFN3 Most Recent 25 Records

FA481923F0085
Repair Existing Stormwater Infrastructure (Drainpipe And Inlet Structures) At Selected Areas Within The Tyndall Afb Main Airfield
15 Sep 2023
Fa4819 325 Cons Pkp
Department Of Defense (Dod)
$1,683,694.88
FA481923F0037
Airfield Civil Works Idiq Task Order Is To Repair Existing Storm Water Drainpipe And Drainage Structures.
12 Jun 2023
Fa4819 325 Cons Pkp
Department Of Defense (Dod)
$1,737,470.96
FA481923F0005
Convert Pavement And Expand Taxiway Bravo
5 Jan 2023
Fa4819 325 Cons Pkp
Department Of Defense (Dod)
$1,379,326.79
FA481923F0005
Convert Pavement And Expand Taxiway Bravo
11 Jan 2023
Fa4819 325 Cons Pkp
Department Of Defense (Dod)
$1,379,326.79
FA481922F0100
Work Consists Of Repairs To Existing Centerline Road Located Between Runway 14R/32L And Runway 14L/32R.
14 Sep 2022
Fa4819 325 Cons Pkp
Department Of Defense (Dod)
$1,861,142.99
FA481922F0062
The Purpose Of This Requirement Is To Repair Airfield Pavement On The Operations Side Of Tyndall Afb.
14 Sep 2022
Fa4819 325 Cons Pkp
Department Of Defense (Dod)
$1,032,531.65
FA481922F0062
Repair The Airfield Pavements On Taxiway G South Slabs At Tyndall Air Force Base.
24 Aug 2023
Fa4819 325 Cons Pkp
Department Of Defense (Dod)
$1,032,531.65
FA481922F0038
This Is To Settle And Pay A Claim For Hurricane Michael.
22 Jun 2022
Fa4819 325 Cons Pkp
Department Of Defense (Dod)
$68,823.50
FA481922F0054
Repair Airfield Pavement Slabs And Repaint Damaged Taxiway Markings: Mod To Unsuspend Performance
14 Jun 2023
Fa4819 325 Cons Pkp
Department Of Defense (Dod)
$2,613,069.67
FA481922F0054
Repair Airfield Pavements F Center Keel
3 Aug 2023
Fa4819 325 Cons Pkp
Department Of Defense (Dod)
$2,613,069.67
FA481922F0054
The Purpose Of This Modification Is To Install An Additional 120 Grounding Rods To The Site Of This Project.
2 Sep 2022
Fa4819 325 Cons Pkp
Department Of Defense (Dod)
$2,514,276.49
FA481922F0054
Repair Airfield Pavements (Taxiway F Center Keel Slabs)
15 Jul 2022
Fa4819 325 Cons Pkp
Department Of Defense (Dod)
$2,514,276.49
FA481922F0054
Repair Airfield Pavement Slabs And Repaint Damaged Taxiway Markings Suspend Work Performance
2 Feb 2023
Fa4819 325 Cons Pkp
Department Of Defense (Dod)
$2,514,276.49
FA481922F0031
Maintain Airfield Markings And Rubber Removal
22 Feb 2023
Fa4819 325 Cons Pkp
Department Of Defense (Dod)
$825,905.49
FA481922F0002
Repair Taxiway H. The Purpose Of This Modification Is To Add Six Grounding Points To The Taxiway.
19 Aug 2022
Fa4819 325 Cons Pkp
Department Of Defense (Dod)
$4,815,748.24
FA481922F0002
The Purpose Of This Task Is Order Is To Repair Taxiway H.
9 Nov 2021
Fa4819 325 Cons Pkp
Department Of Defense (Dod)
$4,815,748.24
FA481921F0077
The Purpose Of This Requirement Is To Repair Airfield Pavement On The Operations Side Of Tyndall Afb.
29 Sep 2021
Fa4819 325 Cons Pkp
Department Of Defense (Dod)
$788,775.73
FA481921F0077
The Purpose Of This Modification Is To Extend The Period Of Performance To 29 April 2022 Instead Of 8 April 2022 Due To Environmental Issues.
13 Apr 2022
Fa4819 325 Cons Pkp
Department Of Defense (Dod)
$788,775.73
FA481921F0077
The Purpose Of This Mod Is To Lift The Suspension Of Work From Mod P0002. The Airfield Is Available For The Contractor To Conduct Work During The Period Of 28 Jan 2022 To7 Feb 2022 For Phase I. Phase Ii Will Be Conducted At The Next Timeframe.
28 Jan 2022
Fa4819 325 Cons Pkp
Department Of Defense (Dod)
$788,775.73
FA481921F0077
The Purpose Of This Modification Is To: 1) Suspend The Period Of Performance For The Aforementioned Project Until The Paint Schedule Is Ed With The Government And Contractor (31 Jan 22 - 9 Feb '22 For Phase 1 And 18-27 April '22 For Phase 2).
22 Dec 2021
Fa4819 325 Cons Pkp
Department Of Defense (Dod)
$788,775.73
FA481921F0077
The Purpose Of This Modification Is To Apply Additional Work To Be Completed On The Runway Pavement Of Tyndall Afb.
30 Sep 2021
Fa4819 325 Cons Pkp
Department Of Defense (Dod)
$788,775.73
FA481921D0001
The Purpose Of This Modification Is To Add The Following: 1)Dfars 252.223-7999 Ensuring Adequate Covid-19 Safety Protocols For Federal Contractors (Deviation 2021-O0009).
19 Nov 2021
Fa4819 325 Cons Pkp
Department Of Defense (Dod)
$0.00
FA481921D0001
Airfield Civil Works Idiq - Exercise Option 2
21 Sep 2023
Fa4819 325 Cons Pkp
Department Of Defense (Dod)
$0.00
FA481921D0001
The Contractor Shall Furnish All Management, Supervision, Labor, Materials, Equipment And Incidentals Required For A Broad Range Of Pavement Maintenance, Repair And Minor Construction.
24 Sep 2021
Fa4819 325 Cons Pkp
Department Of Defense (Dod)
$0.00
FA481920F0054
Work Consists Of Slurry Seal Treatment On Outside Runway Asphalt And Random Slab Repairs On Outside Runway Edge Slabs Located Near Taxiway H Center. Pop 120 Days
16 Sep 2020
Fa4819 325 Cons Pkp
Department Of Defense (Dod)
$383,770.04