Hjd Capital Electric, Inc.
CAGE Code: 1BBU9
NCAGE Code: 1BBU9
Status: Active
Type: Commercial Supplier
Dun & Bradstreet (DUNS): 806723441
Summary
Hjd Capital Electric, Inc. is an Active Commercial Supplier with the Cage Code 1BBU9 and is tracked by Dun & Bradstreet under DUNS Number 806723441..
Address
5424 W Us Highway 90
San Antonio TX 78227-4219
United States
Points of Contact
No Points of Contact...
Related Information
People who viewed this 'CAGE Code' also viewed...
Computize, Inc Barvixa Group Inc Texas Infrastructure Development Gomez Floor Covering, Inc. City Of San Antonio Police Dept English Color And Supply Inc Dba Aladdin Cleaning And Restoration, Radio Shack Div Of Tandy Corp Alamo Lumber Company, Inc. Yantis Corporation San Antonio Resort Limited Partners, Cleaning Ideas Inc Smith Virginia Y Court Reporters Cleaning Ideas Inc Universal Bookbindery, Inc. Madden Material And Trucking Kallisons Farm And Ranch Store Thors Solution Prograde Tech Labs Llc Phantoms Choice Inc The
Frequently Asked Questions (FAQ) for CAGE 1BBU9
- What is CAGE Code 1BBU9?
- 1BBU9 is the unique identifier used by NATO Organizations to reference the physical entity known as Hjd Capital Electric, Inc. located at 5424 W Us Highway 90, San Antonio TX 78227-4219, United States.
- Who is CAGE Code 1BBU9?
- 1BBU9 refers to Hjd Capital Electric, Inc. located at 5424 W Us Highway 90, San Antonio TX 78227-4219, United States.
- Where is CAGE Code 1BBU9 Located?
- CAGE Code 1BBU9 is located in San Antonio, TX, USA.
Contracting History for CAGE 1BBU9 Most Recent 25 Records
- FA301623F0280
- Remove And Replace Approximately 133,000 Linear Feet Of Joint Seal Material And About 100 Square Feet Of Concrete Spall Repairs On The West Apron On Jbsa-Randolph Airfield. Contractor Shall Replace With Silicone Fuel Resistant Joint Sealant.
- 28 Jun 2023
- Remove And Replace Approximately 133,000 Linear Feet Of Joint Seal Material And About 100 Square Feet Of Concrete Spall Repairs On The West Apron On Jbsa-Randolph Airfield. Contractor Shall Replace With Silicone Fuel Resistant Joint Sealant.
- Fa3016 502 Cons Cl
- Department Of Defense (Dod)
- $975,844.11
- Department Of Defense (Dod)
- FA303022F0086
- Repair Kickapoo Trail
- 14 Jun 2023
- Repair Kickapoo Trail
- Fa3030 17 Cons Cc
- Department Of Defense (Dod)
- $1,539,000.03
- Department Of Defense (Dod)
- FA303022F0086
- Repair Kickapoo Trail
- 1 Aug 2023
- Repair Kickapoo Trail
- Fa3030 17 Cons Cc
- Department Of Defense (Dod)
- $1,539,000.03
- Department Of Defense (Dod)
- FA303022F0086
- Repair Kickapoo Trail
- 1 Dec 2022
- Repair Kickapoo Trail
- Fa3030 17 Cons Cc
- Department Of Defense (Dod)
- $1,539,000.03
- Department Of Defense (Dod)
- FA303022F0086
- Repair Kickapoo Trail
- 15 May 2023
- Repair Kickapoo Trail
- Fa3030 17 Cons Cc
- Department Of Defense (Dod)
- $1,539,000.03
- Department Of Defense (Dod)
- FA301622F0417
- The Contractor Will Design, Complete Reconstruction And Sub-Grade Stabilization For Full Depth Road Replacement Of I St W. The Reconstruction Shall Replace The Curb And Gutters, Hmac Layer And Flexible Base Down To The Subgrade Layer.
- 21 Jun 2023
- The Contractor Will Design, Complete Reconstruction And Sub-Grade Stabilization For Full Depth Road Replacement Of I St W. The Reconstruction Shall Replace The Curb And Gutters, Hmac Layer And Flexible Base Down To The Subgrade Layer.
- Fa3016 502 Cons Cl
- Department Of Defense (Dod)
- $662,056.00
- Department Of Defense (Dod)
- FA301622F0417
- The Contractor Will Design, Complete Reconstruction And Sub-Grade Stabilization For Full Depth Road Replacement Of I St W. The Reconstruction Shall Replace The Curb And Gutters, Hmac Layer And Flexible Base Down To The Subgrade Layer.
- 28 Jul 2022
- The Contractor Will Design, Complete Reconstruction And Sub-Grade Stabilization For Full Depth Road Replacement Of I St W. The Reconstruction Shall Replace The Curb And Gutters, Hmac Layer And Flexible Base Down To The Subgrade Layer.
- Fa3016 502 Cons Cl
- Department Of Defense (Dod)
- $662,056.00
- Department Of Defense (Dod)
- FA303022F0009
- Navy Demolition And Renovation B414/B420
- 2 Dec 2021
- Navy Demolition And Renovation B414/B420
- Fa3030 17 Cons Cc
- Department Of Defense (Dod)
- $2,355,101.95
- Department Of Defense (Dod)
- FA303022F0009
- Navy Add/Alter
- 9 Dec 2021
- Navy Add/Alter
- Fa3030 17 Cons Cc
- Department Of Defense (Dod)
- $2,355,101.95
- Department Of Defense (Dod)
- FA303022F0009
- Renovation/Demo Of B420/B414
- 29 Aug 2023
- Renovation/Demo Of B420/B414
- Fa3030 17 Cons Cc
- Department Of Defense (Dod)
- $2,453,101.95
- Department Of Defense (Dod)
- FA301621F0393
- Airfield Maintenance - Restore East Shoulder Area For Proper Water Run-Off Perform Spall Repair And Repair Cracked Seals And Airfield Markings On East Runway At Joint Base San Antonio - Randolph In Accordance With The Statement Of Work.
- 30 Jul 2021
- Airfield Maintenance - Restore East Shoulder Area For Proper Water Run-Off Perform Spall Repair And Repair Cracked Seals And Airfield Markings On East Runway At Joint Base San Antonio - Randolph In Accordance With The Statement Of Work.
- Fa3016 502 Cons Cl
- Department Of Defense (Dod)
- $307,519.08
- Department Of Defense (Dod)
- FA301621F0393
- Airfield Maintenance - Restore East Shoulder Area For Proper Water Run-Off, Perform Spall Repair, And Repair Cracked Seals And Airfield Markings On East Runway At Joint Base San Antonio - Randolph
- 21 Apr 2022
- Airfield Maintenance - Restore East Shoulder Area For Proper Water Run-Off, Perform Spall Repair, And Repair Cracked Seals And Airfield Markings On East Runway At Joint Base San Antonio - Randolph
- Fa3016 502 Cons Cl
- Department Of Defense (Dod)
- $307,519.08
- Department Of Defense (Dod)
- FA301621F0354
- Repair Erosion At Dmset B6866
- 27 Jul 2021
- Repair Erosion At Dmset B6866
- Fa3016 502 Cons Cl
- Department Of Defense (Dod)
- $985,746.24
- Department Of Defense (Dod)
- FA301621F0354
- Pop Alignment And Extension. Repair Erosion Dmset
- 9 Feb 2022
- Pop Alignment And Extension. Repair Erosion Dmset
- Fa3016 502 Cons Cl
- Department Of Defense (Dod)
- $985,746.24
- Department Of Defense (Dod)
- FA301621F0354
- Pop Ext. Clin 0004. 100 Design.
- 17 Jan 2023
- Pop Ext. Clin 0004. 100 Design.
- Fa3016 502 Cons Cl
- Department Of Defense (Dod)
- $1,137,983.17
- Department Of Defense (Dod)
- FA301621F0354
- Repair Erosion At Dmset
- 6 Apr 2023
- Repair Erosion At Dmset
- Fa3016 502 Cons Cl
- Department Of Defense (Dod)
- $1,137,983.17
- Department Of Defense (Dod)
- FA301621F0354
- Clin 0004. 100% Design. Pop Extension.
- 14 Nov 2022
- Clin 0004. 100% Design. Pop Extension.
- Fa3016 502 Cons Cl
- Department Of Defense (Dod)
- $985,746.24
- Department Of Defense (Dod)
- FA301621F0354
- Repair Erosion Dmset
- 13 Sep 2023
- Repair Erosion Dmset
- Fa3016 502 Cons Cl
- Department Of Defense (Dod)
- $1,137,983.17
- Department Of Defense (Dod)
- FA301621F0354
- Pop Alignment And Extension - Rpr Erosion Dmset
- 8 Nov 2021
- Pop Alignment And Extension - Rpr Erosion Dmset
- Fa3016 502 Cons Cl
- Department Of Defense (Dod)
- $985,746.24
- Department Of Defense (Dod)
- FA301621F0247
- Install Hvac In Hangar 74
- 16 Jun 2021
- Install Hvac In Hangar 74
- Fa3016 502 Cons Cl
- Department Of Defense (Dod)
- $697,031.73
- Department Of Defense (Dod)
- FA301620F0507
- B667 Pop Extension
- 10 Jan 2022
- B667 Pop Extension
- Fa3016 502 Cons Cl
- Department Of Defense (Dod)
- $1,274,043.77
- Department Of Defense (Dod)
- FA301620F0507
- Hvac Renovation Bldg. Afpc
- 28 Sep 2020
- Hvac Renovation Bldg. Afpc
- Fa3016 502 Cons Cl
- Department Of Defense (Dod)
- $1,274,043.77
- Department Of Defense (Dod)
- FA301620F0521
- Modification To Extend Period Of Performance
- 21 Dec 2021
- Modification To Extend Period Of Performance
- Fa3016 502 Cons Cl
- Department Of Defense (Dod)
- $2,062,727.94
- Department Of Defense (Dod)
- FA301620F0521
- Construction Of The Combat Conditioning Center - Including Capital Equipment For The Tensioned Fabric Structure.
- 29 Sep 2020
- Construction Of The Combat Conditioning Center - Including Capital Equipment For The Tensioned Fabric Structure.
- Fa3016 502 Cons Cl
- Department Of Defense (Dod)
- $2,062,727.94
- Department Of Defense (Dod)
- FA301620F0521
- Period Of Performance Modification For Construction Clins 0004 And 0005 For Erect Combat Conditioning Center
- 3 Jun 2021
- Period Of Performance Modification For Construction Clins 0004 And 0005 For Erect Combat Conditioning Center
- Fa3016 502 Cons Cl
- Department Of Defense (Dod)
- $2,062,727.94
- Department Of Defense (Dod)