Orbital Sciences Llc
Dba Space Systems Division
Div Tactical Space Systems Division
CAGE Code: 17232
NCAGE Code: 17232
Status: Active
Type: Manufacturer
Dun & Bradstreet (DUNS): 876949058
Summary
Orbital Sciences Llc, Dba Space Systems Division, Div Tactical Space Systems Division is an Active Manufacturer with the Cage Code 17232 and is tracked by Dun & Bradstreet under DUNS Number 876949058..
Address
45101 Warp Dr
Dulles VA 20166-6874
United States
Points of Contact
- Telephone:
- 7034065117
Related Information
People who viewed this 'CAGE Code' also viewed...
Historic Aol Llc Tech-Materials International Inc. Tucon Construction Corporation Websurveyor Corporation Dulles Technologies Llc Innovative Network Solutions, Inc. Arc Second Inc. Bandgap Technologies Inc. Dunham & Morrow, Inc. Nexgen Communications Llc Radiology Information Systems, Inc Network Services Group Inc Giesecke+Devrient Currency Atlantic Coast Airlines Holdings Inc Hawthorne Dulles Inc Paul & Partners Incorporated Dulles West Ii Associates Lp Kj Fine Art Consulting Britcov Victor Raytheon Company
Frequently Asked Questions (FAQ) for CAGE 17232
- What is CAGE Code 17232?
- 17232 is the unique identifier used by NATO Organizations to reference the physical entity known as Orbital Sciences Llc Dba Space Systems Division Div Tactical Space Systems Division located at 45101 Warp Dr, Dulles VA 20166-6874, United States.
- Who is CAGE Code 17232?
- 17232 refers to Orbital Sciences Llc Dba Space Systems Division Div Tactical Space Systems Division located at 45101 Warp Dr, Dulles VA 20166-6874, United States.
- Where is CAGE Code 17232 Located?
- CAGE Code 17232 is located in Dulles, VA, USA.
- How Many NSNs Does CAGE Code 17232 Supply?
- CAGE Code 17232 has been assigned as an approved source for 2 NSNs (National Stock Numbers and NATO Stock Numbers).
Contracting History for CAGE 17232 Most Recent 25 Records
- 80GSFC20F0115
- Electro-Optical/Infrared Weather System (Ews) Mission, Hosting The Visible Infrared Imaging Radiometer Suite (Viirs) As Its Primary Payload (Ews-V), Rapid Iii Spacecraft Study On Behalf Of Dept Of Defense, Space And Missile Systems Center.
- 15 Sep 2020
- Electro-Optical/Infrared Weather System (Ews) Mission, Hosting The Visible Infrared Imaging Radiometer Suite (Viirs) As Its Primary Payload (Ews-V), Rapid Iii Spacecraft Study On Behalf Of Dept Of Defense, Space And Missile Systems Center.
- Nasa Goddard Space Flight Center
- National Aeronautics And Space Administration (Nasa)
- $900,000.00
- National Aeronautics And Space Administration (Nasa)
- NNG11VG01D
- Icesat-2 Delivery Order - Core System Spacecraft Include Hardware And Software
- 4 Jan 2021
- Icesat-2 Delivery Order - Core System Spacecraft Include Hardware And Software
- Nasa Goddard Space Flight Center
- National Aeronautics And Space Administration (Nasa)
- $208,213,157.62
- National Aeronautics And Space Administration (Nasa)
- NNG15VE05D
- Joint Polar Satellite System-2 Spacecraft. Gd-300Hp Core Spacecraft Including All Associated Hardware, Software, Source Code, Maintenance System And Documentation For The Jpss-2 Spacecraft Mission.
- 22 Aug 2017
- Joint Polar Satellite System-2 Spacecraft. Gd-300Hp Core Spacecraft Including All Associated Hardware, Software, Source Code, Maintenance System And Documentation For The Jpss-2 Spacecraft Mission.
- Nasa Goddard Space Flight Center
- National Aeronautics And Space Administration (Nasa)
- $504,587,433.87
- National Aeronautics And Space Administration (Nasa)
- NNG15VE05D
- Joint Polar Satellite System-2 Spacecraft. Gd-300Hp Core Spacecraft Including All Associated Hardware, Software, Source Code, Maintenance System And Documentation For The Jpss-2 Spacecraft Mission.
- 12 Feb 2018
- Joint Polar Satellite System-2 Spacecraft. Gd-300Hp Core Spacecraft Including All Associated Hardware, Software, Source Code, Maintenance System And Documentation For The Jpss-2 Spacecraft Mission.
- Nasa Goddard Space Flight Center
- National Aeronautics And Space Administration (Nasa)
- $504,587,433.87
- National Aeronautics And Space Administration (Nasa)
- NNG15VE05D
- Joint Polar Satellite System-2 Spacecraft. Gd-300Hp Core Spacecraft Including All Associated Hardware, Software, Source Code, Maintenance System And Documentation For The Jpss-2 Spacecraft Mission.
- 1 Oct 2018
- Joint Polar Satellite System-2 Spacecraft. Gd-300Hp Core Spacecraft Including All Associated Hardware, Software, Source Code, Maintenance System And Documentation For The Jpss-2 Spacecraft Mission.
- Nasa Goddard Space Flight Center
- National Aeronautics And Space Administration (Nasa)
- $504,587,433.87
- National Aeronautics And Space Administration (Nasa)
- NNG15VE05D
- Joint Polar Satellite System-2 Spacecraft. Gd-300Hp Core Spacecraft Including All Associated Hardware, Software, Source Code, Maintenance System And Documentation For The Jpss-2 Spacecraft Mission.
- 15 Aug 2019
- Joint Polar Satellite System-2 Spacecraft. Gd-300Hp Core Spacecraft Including All Associated Hardware, Software, Source Code, Maintenance System And Documentation For The Jpss-2 Spacecraft Mission.
- Nasa Goddard Space Flight Center
- National Aeronautics And Space Administration (Nasa)
- $504,587,433.87
- National Aeronautics And Space Administration (Nasa)
- NNG15VE05D
- Joint Polar Satellite System-2 Spacecraft. Gd-300Hp Core Spacecraft Including All Associated Hardware, Software, Source Code, Maintenance System And Documentation For The Jpss-2 Spacecraft Mission.
- 8 Mar 2022
- Joint Polar Satellite System-2 Spacecraft. Gd-300Hp Core Spacecraft Including All Associated Hardware, Software, Source Code, Maintenance System And Documentation For The Jpss-2 Spacecraft Mission.
- Nasa Goddard Space Flight Center
- National Aeronautics And Space Administration (Nasa)
- $504,587,433.87
- National Aeronautics And Space Administration (Nasa)
- NNG15VE05D
- Joint Polar Satellite System-2 Spacecraft. Gd-300Hp Core Spacecraft Including All Associated Hardware, Software, Source Code, Maintenance System And Documentation For The Jpss-2 Spacecraft Mission.
- 14 Feb 2023
- Joint Polar Satellite System-2 Spacecraft. Gd-300Hp Core Spacecraft Including All Associated Hardware, Software, Source Code, Maintenance System And Documentation For The Jpss-2 Spacecraft Mission.
- Nasa Goddard Space Flight Center
- National Aeronautics And Space Administration (Nasa)
- $504,587,433.87
- National Aeronautics And Space Administration (Nasa)
- NNG17VV00D
- Landsat 9 Spacecraft. Core Spacecraft Including All Associated Hardware, Software And Documentation.
- 11 Jun 2020
- Landsat 9 Spacecraft. Core Spacecraft Including All Associated Hardware, Software And Documentation.
- Nasa Goddard Space Flight Center
- National Aeronautics And Space Administration (Nasa)
- $168,112,468.00
- National Aeronautics And Space Administration (Nasa)
- NNG14FC04C
- This Effort Is For Work Performed During Phase B Through F Of The Transiting Exoplanet Survey Satellite (Tess) Mission. The Specific Requirements For Each Of These Phases Are Presented In Individual Sections Below. The Effort Also Includes Tasks To: Design, Analyze, Validate, Develop, Fabricate, Assemble, Integrate, Test, And Deliver The Tess Spacecraft; Integrate, Test, And Operate The Tess Observatory; And Develop, Test, Operate, And Sustain The Associated Mission Operations Center (Moc). The Contractor Is Responsible For The Development Of The Spacecraft And Camera Accommodation Structure, Including The Sunshade. The Tess Instrument, Consisting Of The Camera Structure Assembly, Data Handling Unit And Harness, Will Be Provided As Government Furnished Equipment.
- 13 Jun 2019
- This Effort Is For Work Performed During Phase B Through F Of The Transiting Exoplanet Survey Satellite (Tess) Mission. The Specific Requirements For Each Of These Phases Are Presented In Individual Sections Below. The Effort Also Includes Tasks To: Design, Analyze, Validate, Develop, Fabricate, Assemble, Integrate, Test, And Deliver The Tess Spacecraft; Integrate, Test, And Operate The Tess Observatory; And Develop, Test, Operate, And Sustain The Associated Mission Operations Center (Moc). The Contractor Is Responsible For The Development Of The Spacecraft And Camera Accommodation Structure, Including The Sunshade. The Tess Instrument, Consisting Of The Camera Structure Assembly, Data Handling Unit And Harness, Will Be Provided As Government Furnished Equipment.
- Nasa Goddard Space Flight Center
- National Aeronautics And Space Administration (Nasa)
- $94,785,997.90
- National Aeronautics And Space Administration (Nasa)
- NNG15VE05D
- Joint Polar Satellite System-2 Spacecraft. Gd-300Hp Core Spacecraft Including All Associated Hardware, Software, Source Code, Maintenance System And Documentation For The Jpss-2 Spacecraft Mission.
- 7 Feb 2023
- Joint Polar Satellite System-2 Spacecraft. Gd-300Hp Core Spacecraft Including All Associated Hardware, Software, Source Code, Maintenance System And Documentation For The Jpss-2 Spacecraft Mission.
- Nasa Goddard Space Flight Center
- National Aeronautics And Space Administration (Nasa)
- $504,587,433.87
- National Aeronautics And Space Administration (Nasa)
- NNG11VG01D
- Icesat-2 Delivery Order - Core System Spacecraft Include Hardware And Software
- 24 Nov 2015
- Icesat-2 Delivery Order - Core System Spacecraft Include Hardware And Software
- Goddard Space Flight Center
- National Aeronautics And Space Administration (Nasa)
- $208,213,157.62
- National Aeronautics And Space Administration (Nasa)
- NNG14FC04C
- This Effort Is For Work Performed During Phase B Through F Of The Transiting Exoplanet Survey Satellite (Tess) Mission. The Specific Requirements For Each Of These Phases Are Presented In Individual Sections Below. The Effort Also Includes Tasks To: Design, Analyze, Validate, Develop, Fabricate, Assemble, Integrate, Test, And Deliver The Tess Spacecraft; Integrate, Test, And Operate The Tess Observatory; And Develop, Test, Operate, And Sustain The Associated Mission Operations Center (Moc). The Contractor Is Responsible For The Development Of The Spacecraft And Camera Accommodation Structure, Including The Sunshade. The Tess Instrument, Consisting Of The Camera Structure Assembly, Data Handling Unit And Harness, Will Be Provided As Government Furnished Equipment.
- 14 Aug 2018
- This Effort Is For Work Performed During Phase B Through F Of The Transiting Exoplanet Survey Satellite (Tess) Mission. The Specific Requirements For Each Of These Phases Are Presented In Individual Sections Below. The Effort Also Includes Tasks To: Design, Analyze, Validate, Develop, Fabricate, Assemble, Integrate, Test, And Deliver The Tess Spacecraft; Integrate, Test, And Operate The Tess Observatory; And Develop, Test, Operate, And Sustain The Associated Mission Operations Center (Moc). The Contractor Is Responsible For The Development Of The Spacecraft And Camera Accommodation Structure, Including The Sunshade. The Tess Instrument, Consisting Of The Camera Structure Assembly, Data Handling Unit And Harness, Will Be Provided As Government Furnished Equipment.
- Nasa Goddard Space Flight Center
- National Aeronautics And Space Administration (Nasa)
- $92,746,267.38
- National Aeronautics And Space Administration (Nasa)
- NNG11VG01D
- Icesat-2 Delivery Order - Core System Spacecraft Include Hardware And Software
- 16 Aug 2019
- Icesat-2 Delivery Order - Core System Spacecraft Include Hardware And Software
- Nasa Goddard Space Flight Center
- National Aeronautics And Space Administration (Nasa)
- $208,213,157.62
- National Aeronautics And Space Administration (Nasa)
- NNG15VE05D
- Joint Polar Satellite System-2 Spacecraft. Gd-300Hp Core Spacecraft Including All Associated Hardware, Software, Source Code, Maintenance System And Documentation For The Jpss-2 Spacecraft Mission.
- 9 Sep 2016
- Joint Polar Satellite System-2 Spacecraft. Gd-300Hp Core Spacecraft Including All Associated Hardware, Software, Source Code, Maintenance System And Documentation For The Jpss-2 Spacecraft Mission.
- Nasa Goddard Space Flight Center
- National Aeronautics And Space Administration (Nasa)
- $504,587,433.87
- National Aeronautics And Space Administration (Nasa)
- NNG15VE05D
- Joint Polar Satellite System-2 Spacecraft. Gd-300Hp Core Spacecraft Including All Associated Hardware, Software, Source Code, Maintenance System And Documentation For The Jpss-2 Spacecraft Mission.
- 24 Oct 2016
- Joint Polar Satellite System-2 Spacecraft. Gd-300Hp Core Spacecraft Including All Associated Hardware, Software, Source Code, Maintenance System And Documentation For The Jpss-2 Spacecraft Mission.
- Nasa Goddard Space Flight Center
- National Aeronautics And Space Administration (Nasa)
- $504,587,433.87
- National Aeronautics And Space Administration (Nasa)
- NNG15VE05D
- Joint Polar Satellite System-2 Spacecraft. Gd-300Hp Core Spacecraft Including All Associated Hardware, Software, Source Code, Maintenance System And Documentation For The Jpss-2 Spacecraft Mission.
- 26 Jul 2017
- Joint Polar Satellite System-2 Spacecraft. Gd-300Hp Core Spacecraft Including All Associated Hardware, Software, Source Code, Maintenance System And Documentation For The Jpss-2 Spacecraft Mission.
- Nasa Goddard Space Flight Center
- National Aeronautics And Space Administration (Nasa)
- $504,587,433.87
- National Aeronautics And Space Administration (Nasa)
- NNG15VE05D
- Joint Polar Satellite System-2 Spacecraft. Gd-300Hp Core Spacecraft Including All Associated Hardware, Software, Source Code, Maintenance System And Documentation For The Jpss-2 Spacecraft Mission.
- 27 Mar 2018
- Joint Polar Satellite System-2 Spacecraft. Gd-300Hp Core Spacecraft Including All Associated Hardware, Software, Source Code, Maintenance System And Documentation For The Jpss-2 Spacecraft Mission.
- Nasa Goddard Space Flight Center
- National Aeronautics And Space Administration (Nasa)
- $504,587,433.87
- National Aeronautics And Space Administration (Nasa)
- NNG15VE05D
- Eo14042 Joint Polar Satellite System-2 Spacecraft. Gd-300Hp Core Spacecraft Including All Associated Hardware, Software, Source Code, Maintenance System And Documentation For The Jpss-2 Spacecraft Mission.
- 10 Nov 2021
- Eo14042 Joint Polar Satellite System-2 Spacecraft. Gd-300Hp Core Spacecraft Including All Associated Hardware, Software, Source Code, Maintenance System And Documentation For The Jpss-2 Spacecraft Mission.
- Nasa Goddard Space Flight Center
- National Aeronautics And Space Administration (Nasa)
- $504,587,433.87
- National Aeronautics And Space Administration (Nasa)
- NNG17VV00D
- Landsat 9 Spacecraft. Core Spacecraft Including All Associated Hardware, Software And Documentation.
- 10 Apr 2019
- Landsat 9 Spacecraft. Core Spacecraft Including All Associated Hardware, Software And Documentation.
- Nasa Goddard Space Flight Center
- National Aeronautics And Space Administration (Nasa)
- $168,112,468.00
- National Aeronautics And Space Administration (Nasa)
- NNG14FC04C
- This Effort Is For Work Performed During Phase B Through F Of The Transiting Exoplanet Survey Satellite (Tess) Mission. The Specific Requirements For Each Of These Phases Are Presented In Individual Sections Below. The Effort Also Includes Tasks To: Design, Analyze, Validate, Develop, Fabricate, Assemble, Integrate, Test, And Deliver The Tess Spacecraft Integrate, Test, And Operate The Tess Observatory And Develop, Test, Operate, And Sustain The Associated Mission Operations Center (Moc). The Contractor Is Responsible For The Development Of The Spacecraft And Camera Accommodation Structure, Including The Sunshade. The Tess Instrument, Consisting Of The Camera Structure Assembly, Data Handling Unit And Harness, Will Be Provided As Government Furnished Equipment.
- 18 Jul 2018
- This Effort Is For Work Performed During Phase B Through F Of The Transiting Exoplanet Survey Satellite (Tess) Mission. The Specific Requirements For Each Of These Phases Are Presented In Individual Sections Below. The Effort Also Includes Tasks To: Design, Analyze, Validate, Develop, Fabricate, Assemble, Integrate, Test, And Deliver The Tess Spacecraft Integrate, Test, And Operate The Tess Observatory And Develop, Test, Operate, And Sustain The Associated Mission Operations Center (Moc). The Contractor Is Responsible For The Development Of The Spacecraft And Camera Accommodation Structure, Including The Sunshade. The Tess Instrument, Consisting Of The Camera Structure Assembly, Data Handling Unit And Harness, Will Be Provided As Government Furnished Equipment.
- Nasa Goddard Space Flight Center
- National Aeronautics And Space Administration (Nasa)
- $98,203,847.00
- National Aeronautics And Space Administration (Nasa)
- NNG11VG01D
- Icesat-2 Delivery Order - Core System Spacecraft Include Hardware And Software
- 22 Jan 2014
- Icesat-2 Delivery Order - Core System Spacecraft Include Hardware And Software
- Goddard Space Flight Center
- National Aeronautics And Space Administration (Nasa)
- $208,213,157.62
- National Aeronautics And Space Administration (Nasa)
- NNG11VG01D
- Icesat-2 Delivery Order - Core System Spacecraft Include Hardware And Software
- 28 Aug 2014
- Icesat-2 Delivery Order - Core System Spacecraft Include Hardware And Software
- Goddard Space Flight Center
- National Aeronautics And Space Administration (Nasa)
- $208,213,157.62
- National Aeronautics And Space Administration (Nasa)
- NNG11VG01D
- Icesat-2 Delivery Order - Core System Spacecraft Include Hardware And Software
- 11 Apr 2017
- Icesat-2 Delivery Order - Core System Spacecraft Include Hardware And Software
- Nasa Goddard Space Flight Center
- National Aeronautics And Space Administration (Nasa)
- $208,213,157.62
- National Aeronautics And Space Administration (Nasa)
- NNG11VG01D
- Icesat-2 Delivery Order - Core System Spacecraft Include Hardware And Software
- 11 Sep 2019
- Icesat-2 Delivery Order - Core System Spacecraft Include Hardware And Software
- Nasa Goddard Space Flight Center
- National Aeronautics And Space Administration (Nasa)
- $208,213,157.62
- National Aeronautics And Space Administration (Nasa)
Supply Items Approved for CAGE 17232 Page 1 of 1
- 74LS153N
- RNCC: C | RNVC: 1 | DAC: 5
- Q67000-A97-F72
- RNCC: 3 | RNVC: 2 | DAC: 6