Engineering Design Technologies,
Inc.
CAGE Code: 0ZG65
NCAGE Code: 0ZG65
Status: Active
Type: Commercial Supplier
Dun & Bradstreet (DUNS): 808601298
Summary
Engineering Design Technologies,, Inc. is an Active Commercial Supplier with the Cage Code 0ZG65 and is tracked by Dun & Bradstreet under DUNS Number 808601298..
Address
1705 Enterprise Way Se Ste 200
Marietta GA 30067-9224
United States
Points of Contact
Related Information
People who viewed this 'CAGE Code' also viewed...
Zenith Force Solutions Llc Mediation Alliance Inc Southern Electric Supply Co Golden Manufacturing Co Inc New Concepts Of Care Inc Nb And A Architects Inc Marietta College Education And Jones Neal E Versapharm Inc Restaurant Equipment Marketing Deweys Appliance Four Points Hotel By Sheraton Carrier Corp Ejm Talent Group Llc Willis Facility Services B B O Concepts Inc Mooves Lumber And Building Supply/ Heath & Lineback Engineers, Inc. Barclay Cleaners And Laundry Saines Steven J
Frequently Asked Questions (FAQ) for CAGE 0ZG65
- What is CAGE Code 0ZG65?
- 0ZG65 is the unique identifier used by NATO Organizations to reference the physical entity known as Engineering Design Technologies, Inc. located at 1705 Enterprise Way Se Ste 200, Marietta GA 30067-9224, United States.
- Who is CAGE Code 0ZG65?
- 0ZG65 refers to Engineering Design Technologies, Inc. located at 1705 Enterprise Way Se Ste 200, Marietta GA 30067-9224, United States.
- Where is CAGE Code 0ZG65 Located?
- CAGE Code 0ZG65 is located in Marietta, GA, USA.
Contracting History for CAGE 0ZG65 Most Recent 25 Records
- 0004
- Igf::Ot::Igf Contract For B-9210 H-Frame Barracks Renovations At Fort Hood, Texas. Reference No. R00003 Mg002 Def Of Mg001 - Renovation Of Exist. Cof Mg004 Delete Bedroom Doors&Hardware
- 12 Sep 2017
- Igf::Ot::Igf Contract For B-9210 H-Frame Barracks Renovations At Fort Hood, Texas. Reference No. R00003 Mg002 Def Of Mg001 - Renovation Of Exist. Cof Mg004 Delete Bedroom Doors&Hardware
- Us Army Engineer District Ft Worth
- Department Of Defense (Dod)
- $14,529,065.00
- Department Of Defense (Dod)
- 0004
- Igf::Ot::Igf Contract For B-9210 H-Frame Barracks Renovations At Fort Hood, Texas. Reference No. R00004 Mg006 Reroute Government (Cof) Communications Mg008 Beam&Column Repair Mg009 Transformer Change - Loop To Radial Feed Mg010 Remove&Replace Cof Electrical
- 13 Feb 2018
- Igf::Ot::Igf Contract For B-9210 H-Frame Barracks Renovations At Fort Hood, Texas. Reference No. R00004 Mg006 Reroute Government (Cof) Communications Mg008 Beam&Column Repair Mg009 Transformer Change - Loop To Radial Feed Mg010 Remove&Replace Cof Electrical
- Us Army Engineer District Ft Worth
- Department Of Defense (Dod)
- $14,529,065.00
- Department Of Defense (Dod)
- 0005
- Igf::Ot::Igf Contract For B-9214 H-Frame Barracks Renovations At Fort Hood, Texas. Reference No. R00007 Mg018 Cof Balcony Crack Repair Contractor Shall Mechanically Remove The Top Of The Concrete For Area Shown In Enclosure Mg018-01&Replace With A Heavy Duty Non-Slip Polyurethane Concrete Flooring System. The Contract Completion Date Shall Be Extended By 59 Calendar Days By Reason Of This Modification. The Following Changes Are Included In This Modification: Mg018 59 Calendar Days Therefore, The Contract Required Completion Is Changed From August 28, 2018 To October 26, 2018. In Addition, A Separate Completion Date Is Being Provided For Change Mg018 As It Is Being Executed After Substantial Completion Of The Contract. The Contractor Shall Complete Mg018 No Later Than 30 Days After Receipt Of A Modification Signed By The Government In Block 16C.
- 15 Apr 2019
- Igf::Ot::Igf Contract For B-9214 H-Frame Barracks Renovations At Fort Hood, Texas. Reference No. R00007 Mg018 Cof Balcony Crack Repair Contractor Shall Mechanically Remove The Top Of The Concrete For Area Shown In Enclosure Mg018-01&Replace With A Heavy Duty Non-Slip Polyurethane Concrete Flooring System. The Contract Completion Date Shall Be Extended By 59 Calendar Days By Reason Of This Modification. The Following Changes Are Included In This Modification: Mg018 59 Calendar Days Therefore, The Contract Required Completion Is Changed From August 28, 2018 To October 26, 2018. In Addition, A Separate Completion Date Is Being Provided For Change Mg018 As It Is Being Executed After Substantial Completion Of The Contract. The Contractor Shall Complete Mg018 No Later Than 30 Days After Receipt Of A Modification Signed By The Government In Block 16C.
- Us Army Engineer District Ft Worth
- Department Of Defense (Dod)
- $14,502,561.00
- Department Of Defense (Dod)
- 0002
- Igf:Ot:Igf Contract For B-9213 H-Frame Barracks Renovations. Reference No. R00006 Mg011 Day Room Door Changes Mg012 Weather Time Extension Nov 16 - Feb 18
- 1 Jun 2018
- Igf:Ot:Igf Contract For B-9213 H-Frame Barracks Renovations. Reference No. R00006 Mg011 Day Room Door Changes Mg012 Weather Time Extension Nov 16 - Feb 18
- Us Army Engineer District Ft Worth
- Department Of Defense (Dod)
- $17,139,401.00
- Department Of Defense (Dod)
- 0006
- Clin 2 Mj011 Change In Pup
- 30 Jul 2021
- Clin 2 Mj011 Change In Pup
- Us Army Engineer District Ft Worth
- Department Of Defense (Dod)
- $21,987,171.90
- Department Of Defense (Dod)
- 0006
- Modification To Include Roof Replacement For Bldg. 10652
- 20 Mar 2019
- Modification To Include Roof Replacement For Bldg. 10652
- Us Army Engineer District Ft Worth
- Department Of Defense (Dod)
- $19,656,644.71
- Department Of Defense (Dod)
- DQ01
- Igf::Ot::Igf Base: Construction Cost For Building
- 3 May 2017
- Igf::Ot::Igf Base: Construction Cost For Building
- Us Army Engineer District Wilmingto
- Department Of Defense (Dod)
- $33,465,310.09
- Department Of Defense (Dod)
- 0005
- Igf::Ot::Igf Contract For B-9214 H-Frame Barracks Renovations At Fort Hood, Texas. Reference No. R00006 Mg013 Eifs Color Change Mg014 Mold Remediation In Cof Mg015 Delete Cable Company Handholes Mg016 Ids Conduit&Junction Boxes
- 1 Nov 2018
- Igf::Ot::Igf Contract For B-9214 H-Frame Barracks Renovations At Fort Hood, Texas. Reference No. R00006 Mg013 Eifs Color Change Mg014 Mold Remediation In Cof Mg015 Delete Cable Company Handholes Mg016 Ids Conduit&Junction Boxes
- Us Army Engineer District Ft Worth
- Department Of Defense (Dod)
- $14,502,561.00
- Department Of Defense (Dod)
- 0005
- Igf::Ot::Igf Contract For B-9214 H-Frame Barracks Renovations At Fort Hood, Texas. Reference No. R00005 Mg011 Day Room Door Changes Revise The Day Room Door(S) As Indicated In Sketch Mg011-1, As Follows: Remove&Replace Storefront, Including Door&Hardware (Door 256), And Replace Lockset Core (Door 256A), Key The Same As Door 256. Mg012 Weather Time Extension Nov 16 - Feb 18 It Is Understood And Agreed That Contract Time Is Increased 5 Days As A Result Of This Modification. The New Completion Date Resulting From This Modification Is August 28, 2018.
- 1 Jun 2018
- Igf::Ot::Igf Contract For B-9214 H-Frame Barracks Renovations At Fort Hood, Texas. Reference No. R00005 Mg011 Day Room Door Changes Revise The Day Room Door(S) As Indicated In Sketch Mg011-1, As Follows: Remove&Replace Storefront, Including Door&Hardware (Door 256), And Replace Lockset Core (Door 256A), Key The Same As Door 256. Mg012 Weather Time Extension Nov 16 - Feb 18 It Is Understood And Agreed That Contract Time Is Increased 5 Days As A Result Of This Modification. The New Completion Date Resulting From This Modification Is August 28, 2018.
- Us Army Engineer District Ft Worth
- Department Of Defense (Dod)
- $14,502,561.00
- Department Of Defense (Dod)
- W9126G15D0003
- Swd Sb Matoc- Add Clause 52.204-25
- 24 Feb 2020
- Swd Sb Matoc- Add Clause 52.204-25
- Us Army Engineer District Ft Worth
- Department Of Defense (Dod)
- $0.00
- Department Of Defense (Dod)
- W9126G15D0003
- Small Business Indefinite Delivery/Indefinite Quantity (Idiq) Multiple Award Task Order Contracts (Matocs) For Construction Services For The Us Army Corps Of Engineers (Usace) Southwestern Division (Swd) And Other Swf And Swd Customers On A Limited Nationwide Basis
- 18 Dec 2018
- Small Business Indefinite Delivery/Indefinite Quantity (Idiq) Multiple Award Task Order Contracts (Matocs) For Construction Services For The Us Army Corps Of Engineers (Usace) Southwestern Division (Swd) And Other Swf And Swd Customers On A Limited Nationwide Basis
- Us Army Engineer District Ft Worth
- Department Of Defense (Dod)
- $0.00
- Department Of Defense (Dod)
- 0002
- Igf::Ot::Igf Contract For B-9213 H-Frame Barracks Renovations. Reference No. R00008 Mg013 Eifs Color Change Mg015 Delete Cable Company Hand Holes Mg016 Ids Conduit&Junction Box
- 1 Nov 2018
- Igf::Ot::Igf Contract For B-9213 H-Frame Barracks Renovations. Reference No. R00008 Mg013 Eifs Color Change Mg015 Delete Cable Company Hand Holes Mg016 Ids Conduit&Junction Box
- Us Army Engineer District Ft Worth
- Department Of Defense (Dod)
- $17,139,401.00
- Department Of Defense (Dod)
- 0004
- Igf::Ot::Igf Contract For B-9210 H-Frame Barracks Renovations At Fort Hood, Texas. Reference No. R00005 Mg011 Day Room Door Changes Mg012 Weather Time Extension Nov 16 - Feb 18
- 1 Jun 2018
- Igf::Ot::Igf Contract For B-9210 H-Frame Barracks Renovations At Fort Hood, Texas. Reference No. R00005 Mg011 Day Room Door Changes Mg012 Weather Time Extension Nov 16 - Feb 18
- Us Army Engineer District Ft Worth
- Department Of Defense (Dod)
- $14,529,065.00
- Department Of Defense (Dod)
- 0006
- Settlement Of Rea And Descope Of Incomplete Work.
- 13 Sep 2021
- Settlement Of Rea And Descope Of Incomplete Work.
- Us Army Engineer District Ft Worth
- Department Of Defense (Dod)
- $21,987,171.90
- Department Of Defense (Dod)
- 0006
- Clin 2
- 20 May 2021
- Clin 2
- Us Army Engineer District Ft Worth
- Department Of Defense (Dod)
- $23,684,489.75
- Department Of Defense (Dod)
- 0003
- Igf::Ot::Igf Contract For B-9211 H-Frame Barracks Renovations At Fort Hood, Texas. Reference No. R00006 Mg013 Eifs Color Change Revise The Eifs Color From Teifs 3014L Mountain To Teifs T020l Buckskin. This Change Is To Cover Costs Of The Color Material 3014L Mountain That Is Onsite. Mg014 Mold Remediation In Cof Remediate The Two Supply Room Ceilings, As Shown In Sketch Mg014-1, Under Full Containment Conditions As Required By Texas Mold Assessment And Remediation Rules, Tmarr, Texas Administrative Code, Tac, 16 Tac 78.1-78.150 Mg015 Delete Cable Company Handholes Delete The Cable Company Handhole As Indicated In Revised Drawing T-502, Including The New Conduits Going To The Catv Backboard In Ter Room B02. Cable Company Will Use Existing Conduits To Run Their Outside Plant Into The Ter. Turn Over Hand Hole Structures To Fort Hood Nec - Base Location Tbd. Mg016 Ids Conduit&Junction Boxes Contractor Shall Provide A 1/2" Conduit Out Of The Top Of The Intrusion Detection System (Ids) Box To The Strike Side Of The Door At Top Of Door On The Corner With A 4 Square Box Then A 1/2, Conduit Out Of There To The Center Or As Close As Possible To The Center Of The Vault With Another 4 Square Box. Installation Shall Per The Nec And Contract Specs. No Pull String Shall Be Required.
- 24 Jan 2019
- Igf::Ot::Igf Contract For B-9211 H-Frame Barracks Renovations At Fort Hood, Texas. Reference No. R00006 Mg013 Eifs Color Change Revise The Eifs Color From Teifs 3014L Mountain To Teifs T020l Buckskin. This Change Is To Cover Costs Of The Color Material 3014L Mountain That Is Onsite. Mg014 Mold Remediation In Cof Remediate The Two Supply Room Ceilings, As Shown In Sketch Mg014-1, Under Full Containment Conditions As Required By Texas Mold Assessment And Remediation Rules, Tmarr, Texas Administrative Code, Tac, 16 Tac 78.1-78.150 Mg015 Delete Cable Company Handholes Delete The Cable Company Handhole As Indicated In Revised Drawing T-502, Including The New Conduits Going To The Catv Backboard In Ter Room B02. Cable Company Will Use Existing Conduits To Run Their Outside Plant Into The Ter. Turn Over Hand Hole Structures To Fort Hood Nec - Base Location Tbd. Mg016 Ids Conduit&Junction Boxes Contractor Shall Provide A 1/2" Conduit Out Of The Top Of The Intrusion Detection System (Ids) Box To The Strike Side Of The Door At Top Of Door On The Corner With A 4 Square Box Then A 1/2, Conduit Out Of There To The Center Or As Close As Possible To The Center Of The Vault With Another 4 Square Box. Installation Shall Per The Nec And Contract Specs. No Pull String Shall Be Required.
- Us Army Engineer District Ft Worth
- Department Of Defense (Dod)
- $14,534,058.00
- Department Of Defense (Dod)
- 0004
- Igf::Ot::Igf Contract For B9210 Hframe Barracks Renovations At Fort Hood, Tx Reference No. R000006 A. Scope Of Work Mg013 Eifs Color Change Revise The Eifs Color From Teifs 3014L Mountain To Teifs T020l Buckskin. This Change Is To Cover Costs Of The Color Material 3014L Mountain That Is Onsite. Mg014 Mold Remediation In Cof Remediate The Two Supply Room Ceilings, As Shown In Sketch Mg014 1, Under Full Containment Conditions As Required By Texas Mold Assessment And Remediation Rules Tmarr, Texas Administrative Code Tac, 16 Tac Ss78.1 78.150. Mg015 Delete Cable Company Handholes Delete The Cable Company Handhole As Indicated In Revised Drawing T 502, Including The New Conduits Going To The Catv Backboard In Ter Room B02. Cable Company Will Use Existing Conduits To Run Their Outside Plant Into The Ter. Turn Over Handhole Structures To Fort Hood Nec Base Location Tbd. Mg016 Ids Conduit And Junction Boxes Contractor Shall Provide A Half Inch Conduit Out Of The Top Of The Intrusion Detection System Ids Box To The Strike Side Of The Door At Top Of Door On The Corner With A 4 Square Box Then A Half Inch Conduit Out Of There To The Center Or As Close As Possible To The Center Of The Vault With Another 4 Square Box. Installation Shall Per The Nec And Contract Specs. No Pull String Shall Be Required.
- 24 Jan 2019
- Igf::Ot::Igf Contract For B9210 Hframe Barracks Renovations At Fort Hood, Tx Reference No. R000006 A. Scope Of Work Mg013 Eifs Color Change Revise The Eifs Color From Teifs 3014L Mountain To Teifs T020l Buckskin. This Change Is To Cover Costs Of The Color Material 3014L Mountain That Is Onsite. Mg014 Mold Remediation In Cof Remediate The Two Supply Room Ceilings, As Shown In Sketch Mg014 1, Under Full Containment Conditions As Required By Texas Mold Assessment And Remediation Rules Tmarr, Texas Administrative Code Tac, 16 Tac Ss78.1 78.150. Mg015 Delete Cable Company Handholes Delete The Cable Company Handhole As Indicated In Revised Drawing T 502, Including The New Conduits Going To The Catv Backboard In Ter Room B02. Cable Company Will Use Existing Conduits To Run Their Outside Plant Into The Ter. Turn Over Handhole Structures To Fort Hood Nec Base Location Tbd. Mg016 Ids Conduit And Junction Boxes Contractor Shall Provide A Half Inch Conduit Out Of The Top Of The Intrusion Detection System Ids Box To The Strike Side Of The Door At Top Of Door On The Corner With A 4 Square Box Then A Half Inch Conduit Out Of There To The Center Or As Close As Possible To The Center Of The Vault With Another 4 Square Box. Installation Shall Per The Nec And Contract Specs. No Pull String Shall Be Required.
- Us Army Engineer District Ft Worth
- Department Of Defense (Dod)
- $14,529,065.00
- Department Of Defense (Dod)
- 0003
- Gto:Ot:Gto Contract For B-9211 H-Frame Barracks Renovations At Fort Hood, Texas. Reference No. R00005 Mg011 Day Room Door Changes Mg012 Weather Time Extension Nov 16 - Feb 18
- 1 Jun 2018
- Gto:Ot:Gto Contract For B-9211 H-Frame Barracks Renovations At Fort Hood, Texas. Reference No. R00005 Mg011 Day Room Door Changes Mg012 Weather Time Extension Nov 16 - Feb 18
- Us Army Engineer District Ft Worth
- Department Of Defense (Dod)
- $14,534,058.00
- Department Of Defense (Dod)
- 0003
- Igf::Ot::Igf Contract For B-9211 H-Frame Barracks Renovations At Fort Hood, Texas. Reference No. R00007 Mg018 Cof Balcony Crack Repair Contractor Shall Mechanically Remove The Top Of The Concrete For Area Shown In Enclosure Mg018-01&Replace With A Heavy Duty Non-Slip Polyurethane Concrete Flooring System. The Contract Completion Date Shall Be Extended By 39 Calendar Days By Reason Of This Modification. The Following Changes Are Included In This Modification: Mg018 39 Calendar Days, Therefore, The Contract Required Completion Is Changed From December 17, 2018 To January 25, 2019. In Addition, A Separate Completion Date Is Being Provided For Change Mg018 As It Is Being Executed After Substantial Completion Of The Contract. The Contractor Shall Complete Mg018 Per Enclosure Mg018-02.
- 27 Jun 2019
- Igf::Ot::Igf Contract For B-9211 H-Frame Barracks Renovations At Fort Hood, Texas. Reference No. R00007 Mg018 Cof Balcony Crack Repair Contractor Shall Mechanically Remove The Top Of The Concrete For Area Shown In Enclosure Mg018-01&Replace With A Heavy Duty Non-Slip Polyurethane Concrete Flooring System. The Contract Completion Date Shall Be Extended By 39 Calendar Days By Reason Of This Modification. The Following Changes Are Included In This Modification: Mg018 39 Calendar Days, Therefore, The Contract Required Completion Is Changed From December 17, 2018 To January 25, 2019. In Addition, A Separate Completion Date Is Being Provided For Change Mg018 As It Is Being Executed After Substantial Completion Of The Contract. The Contractor Shall Complete Mg018 Per Enclosure Mg018-02.
- Us Army Engineer District Ft Worth
- Department Of Defense (Dod)
- $14,534,058.00
- Department Of Defense (Dod)
- 0002
- Igf::Ot::Igf Contract For B-9213 H-Frame Barracks Renovations. Reference No. R00009 Mg017 Additional Basement Floor Drains Contractor Shall Install Additional Floor Drains As Shown On Enclosure Mg017-01 To Eliminate Ground Water In The Basement Mechanical Room In Bldg 9213. The Government Will Consider Additional Solutions That The Contractor May Provide To Eliminate The Groundwater From Ponding At These Locations. Total Contract Price Is Increased By $26,000.00.
- 7 Feb 2019
- Igf::Ot::Igf Contract For B-9213 H-Frame Barracks Renovations. Reference No. R00009 Mg017 Additional Basement Floor Drains Contractor Shall Install Additional Floor Drains As Shown On Enclosure Mg017-01 To Eliminate Ground Water In The Basement Mechanical Room In Bldg 9213. The Government Will Consider Additional Solutions That The Contractor May Provide To Eliminate The Groundwater From Ponding At These Locations. Total Contract Price Is Increased By $26,000.00.
- Us Army Engineer District Ft Worth
- Department Of Defense (Dod)
- $17,139,401.00
- Department Of Defense (Dod)
- W9126G15D0003
- Swd Sb Matoc- Base Year
- 5 Oct 2020
- Swd Sb Matoc- Base Year
- Us Army Engineer District Ft Worth
- Department Of Defense (Dod)
- $0.00
- Department Of Defense (Dod)
- 0002
- Igf::Ot::Igf Contract For B-9213 H-Frame Barracks. Reference No. R00003mg002 Def Of Mg001 - Renovation Of Exist. Cof Item 1. This Modification Is For The Definitization Of Final Pricing For Work Required Under Change Mg001 Which Includes The Items Listed Below. Pursuant To Contract Clauses, Far 52.234-4, Change, The Contractor Shall Furnish All Plant, Labor, And Material, And Perform All Work Necessary To Accomplish The Following Described Work. Item 2. Contractor Shall Renovate Cof As Shown In Enclosure Mg001-01&Enclosure Mg001-02. Item 3. Contractor Shall Reduce Field Staff Requirements To The Following: 1. 1 X Senior Superintendent 2. 4 X Building Superintendents 3. 1 X Field Office 4. 2 X Site Safety&Health Officers (Sshos) 5. 1 X Quality Control Manager (Qcm) 6. 2 X Asst. Quality Control 7. 1 X Submittal Clerk Item 4. Contractor Shall Design&Install One Fan Coil Unit Per Dwelling Unit In Lieu Of One Fan Coil Unit Per Room. Item 5. Contractor Shall Provide Spray Foam Insulation With Ignition Barrier To Bottom Of Concrete Roof Structure In Lieu Of Providing Rigid Insulation On Top Of Concrete Roof Structure. Mg004 Delete Bedroom Doors&Hardware Delete All Bedroom Doors, Hardware&Locksets. Leave The Frame, Prepped For A Door&Provide Cover Plates For Hinge And Strike Openings.
- 20 Jul 2017
- Igf::Ot::Igf Contract For B-9213 H-Frame Barracks. Reference No. R00003mg002 Def Of Mg001 - Renovation Of Exist. Cof Item 1. This Modification Is For The Definitization Of Final Pricing For Work Required Under Change Mg001 Which Includes The Items Listed Below. Pursuant To Contract Clauses, Far 52.234-4, Change, The Contractor Shall Furnish All Plant, Labor, And Material, And Perform All Work Necessary To Accomplish The Following Described Work. Item 2. Contractor Shall Renovate Cof As Shown In Enclosure Mg001-01&Enclosure Mg001-02. Item 3. Contractor Shall Reduce Field Staff Requirements To The Following: 1. 1 X Senior Superintendent 2. 4 X Building Superintendents 3. 1 X Field Office 4. 2 X Site Safety&Health Officers (Sshos) 5. 1 X Quality Control Manager (Qcm) 6. 2 X Asst. Quality Control 7. 1 X Submittal Clerk Item 4. Contractor Shall Design&Install One Fan Coil Unit Per Dwelling Unit In Lieu Of One Fan Coil Unit Per Room. Item 5. Contractor Shall Provide Spray Foam Insulation With Ignition Barrier To Bottom Of Concrete Roof Structure In Lieu Of Providing Rigid Insulation On Top Of Concrete Roof Structure. Mg004 Delete Bedroom Doors&Hardware Delete All Bedroom Doors, Hardware&Locksets. Leave The Frame, Prepped For A Door&Provide Cover Plates For Hinge And Strike Openings.
- Us Army Engineer District Ft Worth
- Department Of Defense (Dod)
- $17,139,401.00
- Department Of Defense (Dod)
- 0003
- Igf::Ot::Igf Contract For B-9211 H-Frame Barracks Renovations At Fort Hood, Texas. Reference No. R00003 Mg002 Def Of Mg001 - Renovation Of Exist. Cof Mg004 Delete Bedroom Doors&Hardware
- 31 Aug 2017
- Igf::Ot::Igf Contract For B-9211 H-Frame Barracks Renovations At Fort Hood, Texas. Reference No. R00003 Mg002 Def Of Mg001 - Renovation Of Exist. Cof Mg004 Delete Bedroom Doors&Hardware
- Us Army Engineer District Ft Worth
- Department Of Defense (Dod)
- $14,534,058.00
- Department Of Defense (Dod)
- 0006
- Administrative Modification To Change Pop Date From 30 September 2020 To 30 August 2020.
- 25 Oct 2019
- Administrative Modification To Change Pop Date From 30 September 2020 To 30 August 2020.
- Us Army Engineer District Ft Worth
- Department Of Defense (Dod)
- $19,656,644.71
- Department Of Defense (Dod)
- 0004
- Demolition And Construction, B.9210
- 9 Jul 2018
- Demolition And Construction, B.9210
- Us Army Engineer District Ft Worth
- Department Of Defense (Dod)
- $14,529,065.00
- Department Of Defense (Dod)