Civil Constructors, Inc
Div Helm Civil

CAGE Code: 0GBY1

NCAGE Code: 0GBY1

Status: Active

Type: Commercial Supplier

Dun & Bradstreet (DUNS): 150665867

Summary

Civil Constructors, Inc, Div Helm Civil is an Active Commercial Supplier with the Cage Code 0GBY1 and is tracked by Dun & Bradstreet under DUNS Number 150665867..

Address

2283 Us Highway 20 E
Freeport IL 61032-9643
United States

Points of Contact

Telephone:
8152978560
Fax:
8152359590

Related Information

Associated CAGE Codes People who viewed this 'CAGE Code' also viewed...

CAGE Code FAQ Frequently Asked Questions (FAQ) for CAGE 0GBY1

What is CAGE Code 0GBY1?
0GBY1 is the unique identifier used by NATO Organizations to reference the physical entity known as Civil Constructors, Inc Div Helm Civil located at 2283 Us Highway 20 E, Freeport IL 61032-9643, United States.
Who is CAGE Code 0GBY1?
0GBY1 refers to Civil Constructors, Inc Div Helm Civil located at 2283 Us Highway 20 E, Freeport IL 61032-9643, United States.
Where is CAGE Code 0GBY1 Located?
CAGE Code 0GBY1 is located in Freeport, IL, USA.

Contracting History for CAGE 0GBY1 Contracting History for CAGE 0GBY1 Most Recent 25 Records

W912EK23C0033
Lock 17 Sheetpile Repair
27 Jun 2023
W07v Endist Rock Island
Department Of Defense (Dod)
$3,820,000.00
W912EK23C0033
Modification For Completion Date Update And Exercise Options A And B
2 Aug 2023
W07v Endist Rock Island
Department Of Defense (Dod)
$3,820,000.00
W912EK18C0002
Contract For Mississippi River Basin Lock And Dam No. 15 Rock Island, Il Downstream Guidewall Repair At Rock Island, Il. R00018 Modification To Install Access Road From The Downstream Parking Lot To The Parapet Wall On Mono 34.
26 Jul 2021
W07v Endist Rock Island
Department Of Defense (Dod)
$15,566,872.01
W912EK18C0002
Contract For Mississippi River Basin Lock And Dam No. 15 Rock Island, Il Downstream Guidewall Repair. R00016 Reason For This Modification To Install A Concrete Parapet Wall On The Downstream End Of Monolith 34.
7 Jul 2021
W07v Endist Rock Island
Department Of Defense (Dod)
$15,566,872.01
W912EK18C0002
Contract For Mississippi River Basin Lock And Dam No. 15 Rock Island, Il Downstream Guidewall Repair At Rock Island, Il. R00011 Reason For Modification To Conduct Repairs On The Upper Guidewall Mono 2.
17 Mar 2021
W07v Endist Rock Island
Department Of Defense (Dod)
$15,209,588.63
W912EK18C0002
Contract For Mississippi River Basin Lock And Dam No. 15 Rock Island, Il Downstream Guidewall Repair R00012 Reason For Modification Is To Remove Additional Concrete And "T" Armor Below Elevation To Remove Existing Armor For Dewatering/Demolition.
12 Jul 2021
W07v Endist Rock Island
Department Of Defense (Dod)
$15,566,872.01
W912EK18C0002
Mississippi River Basin; Lock And Dam No. 15, Rock Island, Il; Guidewall Repair
14 Dec 2017
W07v Endist Rock Island
Department Of Defense (Dod)
$15,556,980.26
W912EK18C0002
Modification For Mississippi River Basin Lock And Dam No. 15 Rock Island, Il Downstream Guidewall Repair At Rock Island, Il. R00013 Reason For Modification Is For Cold Weather Procedures For Operations Of Government Bridge.
14 May 2021
W07v Endist Rock Island
Department Of Defense (Dod)
$15,566,872.01
W912EK18C0002
Contract For Mississippi River Basin Lock And Dam No. 15 Rock Island, Il Downstream Guidewall Repair At Rock Island, Il. R00017 To Perform Concrete Removal Below Elevation 546 In Order To Remove All Existing "T" Armor On The Monoliths Under Repair
22 Jul 2021
W07v Endist Rock Island
Department Of Defense (Dod)
$15,566,872.01
W912EK18C0002
Modification For Mississippi River Basin Lock And Dam No. 15 Rock Island, Il Downstream Guidewall Repair At Rock Island, Il. R00015 Modification For Replacing Two Light Poles Located On The Lower Guidewall Monoliths 29 And 34 With New Light Poles.
13 May 2021
W07v Endist Rock Island
Department Of Defense (Dod)
$15,566,872.01
W912EK18C0002
Contract For Miss. River Basin Ld15 Rock Island,Il Downstream Guidewall Repair At Rock Island,Il. Refno.R00019. Final Veq To Reflect Actual Quantities Place. Contract Price Is Decreased By $9,891.75. Completion Date Unchanged By This Modification.
31 Mar 2022
W07v Endist Rock Island
Department Of Defense (Dod)
$15,556,980.26
W912EK18C0002
Modification For Mississippi River Basin Lock And Dam No. 15 Rock Island, Il Downstream Guidewall At Rock Island, Il. R00014 Reason For Modification Is For Temporary Sheet Pile Wall Installed To Remain In Place To Be Used Used As A Cut Off Wall.
17 May 2021
W07v Endist Rock Island
Department Of Defense (Dod)
$15,566,872.01