Farris Engineering Inc

CAGE Code: 0F277

NCAGE Code: 0F277

Status: Discontinued

Type: Commercial Supplier

Dun & Bradstreet (DUNS): 120796446

Summary

Farris Engineering Inc is a Discontinued Commercial Supplier with the Cage Code 0F277 and is tracked by Dun & Bradstreet under DUNS Number 120796446..

Address

650 1St St
Colorado Springs CO 80907-5495
United States

Points of Contact

No Points of Contact...

Related Information

Associated CAGE Codes People who viewed this 'CAGE Code' also viewed...

CAGE Code FAQ Frequently Asked Questions (FAQ) for CAGE 0F277

What is CAGE Code 0F277?
0F277 is the unique identifier used by NATO Organizations to reference the physical entity known as Farris Engineering Inc located at 650 1St St, Colorado Springs CO 80907-5495, United States.
Who is CAGE Code 0F277?
0F277 refers to Farris Engineering Inc located at 650 1St St, Colorado Springs CO 80907-5495, United States.
Where is CAGE Code 0F277 Located?
CAGE Code 0F277 is located in Colorado Springs, CO, USA.

Contracting History for CAGE 0F277 Contracting History for CAGE 0F277 Most Recent 25 Records

FA461321F0026
Architect And Engineering - Fire Alarm Design For Buildings 220, 222, 223, 224, And 226
5 Jan 2022
Fa4613 90 Cons Pk
Department Of Defense (Dod)
$234,984.82
FA461321F0027
Architect And Engineering - Fire Alarm Design For Buildings 228, 230, 236, 248, And 838
5 Jan 2022
Fa4613 90 Cons Pk
Department Of Defense (Dod)
$271,193.02
FA461320F0122
Fire Alarm Designs For Buildings 150, 214&218
30 Sep 2020
Fa4613 90 Cons Pk
Department Of Defense (Dod)
$148,919.15
FA251720F0241
Repair Sanitary Sewer
23 Nov 2021
Fa2517 21 Cons Bldg 350
Department Of Defense (Dod)
$425,620.77
FA251720F0089
Architecture&Engineering Services To Repair Building 122 At Peterson Afb, Co
24 Jan 2022
Fa2517 21 Cons Bldg 350
Department Of Defense (Dod)
$76,500.00
FA251720F0089
Architecture&Engineering Services To Repair Building 122 At Peterson Afb, Co
12 Jun 2020
Fa2517 21 Cons Bldg 350
Department Of Defense (Dod)
$76,500.00
FA251720F0089
Modification To Extend Pop 180 Days
10 Jun 2021
Fa2517 21 Cons
Department Of Defense (Dod)
$364,494.91
FA251720F0232
Repair Hvac Bldg. 1840 Scope Change Modification
26 Mar 2021
Fa2517 21 Cons
Department Of Defense (Dod)
$295,906.38
FA251718F5051
Igf::Ot::Igf Tdka 16-2535 Ae Physio Center Repair
18 Jul 2018
Fa2517 21 Cons
Department Of Defense (Dod)
$84,557.54
FA700016D0002
C1. Sow: The General Sow Will Include Efforts Necessary To Manage And Execute Title I, Title Ii And Other Professional A-E Services, Traditional A-E Services For Design And Construction Oversight Supporting Srm (Sustainment Restoration And Modernization) And Milcon (Military Construction) Programs.Title I Include Services Relatedto A Specific Construction Project And Consist Of Conducting Field Surveys And Investigations To Obtain Design Data And Preparing Contract Plans, Specifications, And Cost Estimates. These Services Include Preliminary/Concept Designs, Design Development, Technical Specifications, Project Design Analysis, Preparation Of Preliminary And Final Construction Drawings, Studies And Surveys, Facility Assessments, And Comprehensive Interior Design Packages That Meet Unified Facility Criteria (Ufc) 3-120-10. Services May Be Required For Primary Disciplines, Which Include But Are Not Limited To Architectural, Electrical, Mechanical, Civil, Landscaping, Forensic Investigation/Remediation, Structural, Environmental, And Interior Design. Specific Requirements May Include High Temperature Hot Water, Geotechnical, Mining, Fire Protection, Soils, Life Health Safety Upgrades, Ada Handicap Upgrades, Historic Preservation, Sustainable Design, Leed Certification, Economic/Lifecycle Design, And Renovation And Modernization. This Work Includes Airfields, Recreation, Campus/Academic, Administrative, Dining, Housing, Athletic, And Support Facilities. The A-E Is Required To Utilize E4clicks Project Estimator Program And Possibly Paces For Cost Estimating. A Visual Inspection Of The Site, Utility, Infrastructure Or Facility For Familiarization With Scope, General Conditions, And Coordination With Using Activities May Also Be Required.Title Ii Services Include Services Related To A Specific Or Proposed Construction Project And Consist Of Supervision And Inspection Of Construction. This Includes Inspecting, Monitoring, And Evaluating Construction Activities To Validate Conformance To Plans And Specifications, Including Reviewing, Evaluating, And Testing Product Submittals And Shop Drawings, As Well As Preparation Of Construction Contract Modifications.Other Professional Services Include Services That Are Design And Construction Related But Is Not Connected With A Specific Construction Project. The Services Consist Of Developing Design Criteria, Fact-Finding Studies, Surveys, Investigations, And The Performance Of Environmental Projects Involving Prevention, Compliance, And Restoration When The Services Of Registered Architects Or Engineers Are Required. Excluded Are Services That Need Not Be Performed By A Professional Engineer Or Registered Architect Such As Providing Design And Construction Equipment Or Computer Programs.C2. A-E Standards: The A-E Contractor Will Be Required To Comply With All Industry Standard Codes. These Codes And Regulations Include But Are Not Limited To: International Building Codes (Ibc), American Society Of Heating, Refrigeration, And Air-Conditioning Engineers (Ashrae), Americans With Disabilities Act (Ada), National Fire Protection Association (Nfpa), Industry Standards, Unified Facilities Criteria (Ufc), Air Force Engineering Technical Letters (Etl), Anti-Terrorism/Force Protection (At/Fp) Standards, State Historical Preservation Office (Shpo) Requirements, Air Force Instructions (Afi), Manuals, Handbooks And Other Publications, Usafa Design Standards Including Cad/Bim/Gis, Fort Carson Installation Design Guide (Idg), Applicable Engineering Design Guides, Planning Requirements And Applicable Drafting Standards. "Section 889"
18 Aug 2020
Fa7000 10 Cons Lgc
Department Of Defense (Dod)
$0.00
FA700016D0002
Exercise Option Period Three
31 Jan 2019
Fa7000 10 Cons Lgc
Department Of Defense (Dod)
$0.00
FA251721F0041
Fire Safety Code Analysis Bldg. 1 Atrium
29 Jan 2021
Fa2517 21 Cons
Department Of Defense (Dod)
$20,232.83
FA251719FA118
Architect And Engineering Design To Repair Room 280 At Bldg.2025, Peterson Afb, Co
12 Sep 2019
Fa2517 21 Cons Bldg 350
Department Of Defense (Dod)
$148,694.89
FA700016D0002
C1. Sow: The General Sow Will Include Efforts Necessary To Manage And Execute Title I, Title Ii And Other Professional A-E Services, Traditional A-E Services For Design And Construction Oversight Supporting Srm (Sustainment Restoration And Modernization) And Milcon (Military Construction) Programs.Title I Include Services Relatedto A Specific Construction Project And Consist Of Conducting Field Surveys And Investigations To Obtain Design Data And Preparing Contract Plans, Specifications, And Cost Estimates. These Services Include Preliminary/Concept Designs, Design Development, Technical Specifications, Project Design Analysis, Preparation Of Preliminary And Final Construction Drawings, Studies And Surveys, Facility Assessments, And Comprehensive Interior Design Packages That Meet Unified Facility Criteria (Ufc) 3-120-10. Services May Be Required For Primary Disciplines, Which Include But Are Not Limited To Architectural, Electrical, Mechanical, Civil, Landscaping, Forensic Investigation/Remediation, Structural, Environmental, And Interior Design. Specific Requirements May Include High Temperature Hot Water, Geotechnical, Mining, Fire Protection, Soils, Life Health Safety Upgrades, Ada Handicap Upgrades, Historic Preservation, Sustainable Design, Leed Certification, Economic/Lifecycle Design, And Renovation And Modernization. This Work Includes Airfields, Recreation, Campus/Academic, Administrative, Dining, Housing, Athletic, And Support Facilities. The A-E Is Required To Utilize E4clicks Project Estimator Program And Possibly Paces For Cost Estimating. A Visual Inspection Of The Site, Utility, Infrastructure Or Facility For Familiarization With Scope, General Conditions, And Coordination With Using Activities May Also Be Required.Title Ii Services Include Services Related To A Specific Or Proposed Construction Project And Consist Of Supervision And Inspection Of Construction. This Includes Inspecting, Monitoring, And Evaluating Construction Activities To Validate Conformance To Plans And Specifications, Including Reviewing, Evaluating, And Testing Product Submittals And Shop Drawings, As Well As Preparation Of Construction Contract Modifications.Other Professional Services Include Services That Are Design And Construction Related But Is Not Connected With A Specific Construction Project. The Services Consist Of Developing Design Criteria, Fact-Finding Studies, Surveys, Investigations, And The Performance Of Environmental Projects Involving Prevention, Compliance, And Restoration When The Services Of Registered Architects Or Engineers Are Required. Excluded Are Services That Need Not Be Performed By A Professional Engineer Or Registered Architect Such As Providing Design And Construction Equipment Or Computer Programs.C2. A-E Standards: The A-E Contractor Will Be Required To Comply With All Industry Standard Codes. These Codes And Regulations Include But Are Not Limited To: International Building Codes (Ibc), American Society Of Heating, Refrigeration, And Air-Conditioning Engineers (Ashrae), Americans With Disabilities Act (Ada), National Fire Protection Association (Nfpa), Industry Standards, Unified Facilities Criteria (Ufc), Air Force Engineering Technical Letters (Etl), Anti-Terrorism/Force Protection (At/Fp) Standards, State Historical Preservation Office (Shpo) Requirements, Air Force Instructions (Afi), Manuals, Handbooks And Other Publications, Usafa Design Standards Including Cad/Bim/Gis, Fort Carson Installation Design Guide (Idg), Applicable Engineering Design Guides, Planning Requirements And Applicable Drafting Standards.
15 Jan 2020
Fa7000 10 Cons Lgc
Department Of Defense (Dod)
$0.00
FA700016D0002
C1. Sow: The General Sow Will Include Efforts Necessary To Manage And Execute Title I, Title Ii And Other Professional A-E Services, Traditional A-E Services For Design And Construction Oversight Supporting Srm (Sustainment Restoration And Modernization) And Milcon (Military Construction) Programs.Title I Include Services Relatedto A Specific Construction Project And Consist Of Conducting Field Surveys And Investigations To Obtain Design Data And Preparing Contract Plans, Specifications, And Cost Estimates. These Services Include Preliminary/Concept Designs, Design Development, Technical Specifications, Project Design Analysis, Preparation Of Preliminary And Final Construction Drawings, Studies And Surveys, Facility Assessments, And Comprehensive Interior Design Packages That Meet Unified Facility Criteria (Ufc) 3-120-10. Services May Be Required For Primary Disciplines, Which Include But Are Not Limited To Architectural, Electrical, Mechanical, Civil, Landscaping, Forensic Investigation/Remediation, Structural, Environmental, And Interior Design. Specific Requirements May Include High Temperature Hot Water, Geotechnical, Mining, Fire Protection, Soils, Life Health Safety Upgrades, Ada Handicap Upgrades, Historic Preservation, Sustainable Design, Leed Certification, Economic/Lifecycle Design, And Renovation And Modernization. This Work Includes Airfields, Recreation, Campus/Academic, Administrative, Dining, Housing, Athletic, And Support Facilities. The A-E Is Required To Utilize E4clicks Project Estimator Program And Possibly Paces For Cost Estimating. A Visual Inspection Of The Site, Utility, Infrastructure Or Facility For Familiarization With Scope, General Conditions, And Coordination With Using Activities May Also Be Required.Title Ii Services Include Services Related To A Specific Or Proposed Construction Project And Consist Of Supervision And Inspection Of Construction. This Includes Inspecting, Monitoring, And Evaluating Construction Activities To Validate Conformance To Plans And Specifications, Including Reviewing, Evaluating, And Testing Product Submittals And Shop Drawings, As Well As Preparation Of Construction Contract Modifications.Other Professional Services Include Services That Are Design And Construction Related But Is Not Connected With A Specific Construction Project. The Services Consist Of Developing Design Criteria, Fact-Finding Studies, Surveys, Investigations, And The Performance Of Environmental Projects Involving Prevention, Compliance, And Restoration When The Services Of Registered Architects Or Engineers Are Required. Excluded Are Services That Need Not Be Performed By A Professional Engineer Or Registered Architect Such As Providing Design And Construction Equipment Or Computer Programs.C2. A-E Standards: The A-E Contractor Will Be Required To Comply With All Industry Standard Codes. These Codes And Regulations Include But Are Not Limited To: International Building Codes (Ibc), American Society Of Heating, Refrigeration, And Air-Conditioning Engineers (Ashrae), Americans With Disabilities Act (Ada), National Fire Protection Association (Nfpa), Industry Standards, Unified Facilities Criteria (Ufc), Air Force Engineering Technical Letters (Etl), Anti-Terrorism/Force Protection (At/Fp) Standards, State Historical Preservation Office (Shpo) Requirements, Air Force Instructions (Afi), Manuals, Handbooks And Other Publications, Usafa Design Standards Including Cad/Bim/Gis, Fort Carson Installation Design Guide (Idg), Applicable Engineering Design Guides, Planning Requirements And Applicable Drafting Standards. Section 889
6 Aug 2020
Fa7000 10 Cons Lgc
Department Of Defense (Dod)
$0.00
FA251720F0232
Repair Hvac Bldg. 1840
29 Sep 2020
Fa2517 21 Cons Bldg 350
Department Of Defense (Dod)
$295,906.38
FA700016D0002
Igf::Ot::Igf Exercise Option Period 2 (3Feb18 - 2Feb19)
2 Feb 2018
Fa7000 10 Cons Lgc
Department Of Defense (Dod)
$0.00