Mcknight Construction Co.
CAGE Code: 0DX80
NCAGE Code: 0DX80
Status: Active
Type: Commercial Supplier
Dun & Bradstreet (DUNS): 004838074
Summary
Mcknight Construction Co. is an Active Commercial Supplier with the Cage Code 0DX80 and is tracked by Dun & Bradstreet under DUNS Number 004838074..
Address
635 Nw Frontage Rd
Augusta GA 30907-3679
United States
Points of Contact
- Telephone:
- 7068637784
- Fax:
- 7068632031
Related Information
People who viewed this 'CAGE Code' also viewed...
Ferrellgas, L.P. Goldberg Bros Inc Augusta Rubber Corp The G And R Electric Co R-B Landscaping Gay Shirley Trucking And Pavement Maine Osteopathic Assn Yancey Bros Co Custom Metal Work L And L Sprinkler System Jones Clarence R Consultant Ltd Elliott Sons Funeral Home Inc All South Refrigeration Inc Mooneys Shoes Inc Georgia Power Co Mccain Dan Construction Co Inc National Commercial Building J C Signs Eagle Creek Construction Co Osbon Medical Systems Ltd
Frequently Asked Questions (FAQ) for CAGE 0DX80
- What is CAGE Code 0DX80?
- 0DX80 is the unique identifier used by NATO Organizations to reference the physical entity known as Mcknight Construction Co. located at 635 Nw Frontage Rd, Augusta GA 30907-3679, United States.
- Who is CAGE Code 0DX80?
- 0DX80 refers to Mcknight Construction Co. located at 635 Nw Frontage Rd, Augusta GA 30907-3679, United States.
- Where is CAGE Code 0DX80 Located?
- CAGE Code 0DX80 is located in Augusta, GA, USA.
Contracting History for CAGE 0DX80 Most Recent 25 Records
- W912HN20C3007
- Rv005 Replace Structurally Unsuitable Soil
- 15 Mar 2022
- Rv005 Replace Structurally Unsuitable Soil
- Us Army Engineer District Savannah
- Department Of Defense (Dod)
- $24,546,673.00
- Department Of Defense (Dod)
- W912HN20C3007
- Personnel Recovery Hangar Hmu
- 3 Aug 2023
- Personnel Recovery Hangar Hmu
- W074 Endist Savannah
- Department Of Defense (Dod)
- $28,312,179.00
- Department Of Defense (Dod)
- W912HN20C3007
- Personnel Recovery Hangar Hmu
- 29 Aug 2023
- Personnel Recovery Hangar Hmu
- W074 Endist Savannah
- Department Of Defense (Dod)
- $28,312,179.00
- Department Of Defense (Dod)
- W912HN20C3007
- Basic Change Rv014 And Rv015 To Fund Pumphouse Suspension Costs And Pumphouse Phasing And Escalation Personnel Recovery Hangar Hmu, Moody Afb
- 4 Aug 2022
- Basic Change Rv014 And Rv015 To Fund Pumphouse Suspension Costs And Pumphouse Phasing And Escalation Personnel Recovery Hangar Hmu, Moody Afb
- Us Army Engineer District Savannah
- Department Of Defense (Dod)
- $27,934,740.00
- Department Of Defense (Dod)
- W912HN20C3007
- Rv004 Fire Main Tie-In To Pumphouse Rv006 Site Communication Terminations Rv008 Electrical Redundancy
- 4 Apr 2022
- Rv004 Fire Main Tie-In To Pumphouse Rv006 Site Communication Terminations Rv008 Electrical Redundancy
- Us Army Engineer District Savannah
- Department Of Defense (Dod)
- $24,546,673.00
- Department Of Defense (Dod)
- W912HN20C3007
- Rea Additional Unsuitable Soils Contractor Shall Furnish All Labor, Equipment, Materials, And Incidentals Necessary To Install Trench Drain Estimated 275 Lf Trench Line A 15X15x4 Area In The Subgrade With Drainage Filter Fabric And No. 57 Stone
- 23 Aug 2022
- Rea Additional Unsuitable Soils Contractor Shall Furnish All Labor, Equipment, Materials, And Incidentals Necessary To Install Trench Drain Estimated 275 Lf Trench Line A 15X15x4 Area In The Subgrade With Drainage Filter Fabric And No. 57 Stone
- Us Army Engineer District Savannah
- Department Of Defense (Dod)
- $27,934,740.00
- Department Of Defense (Dod)
- W912HN20C3007
- Personnel Recovery Hangar Hmu
- 29 Aug 2023
- Personnel Recovery Hangar Hmu
- W074 Endist Savannah
- Department Of Defense (Dod)
- $28,312,179.00
- Department Of Defense (Dod)
- W912HN20C3007
- Site Communications Revisions
- 20 Apr 2021
- Site Communications Revisions
- Us Army Engineer District Savannah
- Department Of Defense (Dod)
- $23,774,739.00
- Department Of Defense (Dod)