Chrome Electric, Llc
Dba Chrome Electric Llc
CAGE Code: 0CWY5
NCAGE Code: 0CWY5
Status: Active
Type: Commercial Supplier
Dun & Bradstreet (DUNS): 139310403
Summary
Chrome Electric, Llc, Dba Chrome Electric Llc is an Active Commercial Supplier with the Cage Code 0CWY5 and is tracked by Dun & Bradstreet under DUNS Number 139310403..
Address
500 S Park Ave
Titusville FL 32796-3852
United States
Points of Contact
No Points of Contact...
Related Information
People who viewed this 'CAGE Code' also viewed...
Stellar Properties Dba Howard United Space Alliance, Llc Hm2 Corp Oil Creek Supply Honeywell Technology Solutions Inc Parker Janitorial Service Inc American Mfg And Industrial Services Hitech Holdings Inc Grumman Technical Services Inc Drilling Specialties Co Southeast Power Corp Frontier Acquisition Inc Call Henry Inc Consolidation And Consultant Data Integration Systems Consultants Omni Pest Elimination Co Sunshine Construction And Rkt Constructors Inc/Cherokee Rkt Constructors Inc./ Oneida Del Mar Avionics
Frequently Asked Questions (FAQ) for CAGE 0CWY5
- What is CAGE Code 0CWY5?
- 0CWY5 is the unique identifier used by NATO Organizations to reference the physical entity known as Chrome Electric, Llc Dba Chrome Electric Llc located at 500 S Park Ave, Titusville FL 32796-3852, United States.
- Who is CAGE Code 0CWY5?
- 0CWY5 refers to Chrome Electric, Llc Dba Chrome Electric Llc located at 500 S Park Ave, Titusville FL 32796-3852, United States.
- Where is CAGE Code 0CWY5 Located?
- CAGE Code 0CWY5 is located in Titusville, FL, USA.
Contracting History for CAGE 0CWY5 Most Recent 25 Records
- 80KSC023F0051
- Science Annex (M7-0411) 150Kw/480V Power Generator & Start-Up At Kennedy Space Center.
- 28 Jun 2023
- Science Annex (M7-0411) 150Kw/480V Power Generator & Start-Up At Kennedy Space Center.
- Nasa Kennedy Space Center
- National Aeronautics And Space Administration (Nasa)
- $149,700.00
- National Aeronautics And Space Administration (Nasa)
- 80KSC023F0051
- Science Annex (M7-0411) 150Kw/480V Power Generator & Start-Up At Kennedy Space Center. Mod 01 Period Of Performance Extension To 11/14/2023.
- 26 Oct 2023
- Science Annex (M7-0411) 150Kw/480V Power Generator & Start-Up At Kennedy Space Center. Mod 01 Period Of Performance Extension To 11/14/2023.
- Nasa Kennedy Space Center
- National Aeronautics And Space Administration (Nasa)
- $149,700.00
- National Aeronautics And Space Administration (Nasa)
- 80KSC021CA004
- Safety And Reliability Upgrade, Phase 4, Package 1. Mod 5: Incorporates Tracking Number (Tn)-002, Change Fire Pump Ats Configuration. As A Result, The Contract Value And Funding Will Increase.
- 30 Mar 2022
- Safety And Reliability Upgrade, Phase 4, Package 1. Mod 5: Incorporates Tracking Number (Tn)-002, Change Fire Pump Ats Configuration. As A Result, The Contract Value And Funding Will Increase.
- Nasa Kennedy Space Center
- National Aeronautics And Space Administration (Nasa)
- $3,538,351.00
- National Aeronautics And Space Administration (Nasa)
- 80KSC021CA004
- Safety And Reliability Power Upgrades Phase 4 And 5 At Kennedy Space Center, Fl.
- 15 Jun 2021
- Safety And Reliability Power Upgrades Phase 4 And 5 At Kennedy Space Center, Fl.
- Nasa Kennedy Space Center
- National Aeronautics And Space Administration (Nasa)
- $3,538,351.00
- National Aeronautics And Space Administration (Nasa)
- 80KSC021CA004
- Safety And Reliability Upgrades Phase 4. P00014: Incorporate 52.204-27 And Remove Clause 52.223-99.
- 10 Aug 2023
- Safety And Reliability Upgrades Phase 4. P00014: Incorporate 52.204-27 And Remove Clause 52.223-99.
- Nasa Kennedy Space Center
- National Aeronautics And Space Administration (Nasa)
- $4,079,739.00
- National Aeronautics And Space Administration (Nasa)
- 80KSC021CA004
- Safety And Reliability Upgrades Phase 4. P00015: Incorporate Tracking Number (Tn) 12 Into The Contract.
- 28 Aug 2023
- Safety And Reliability Upgrades Phase 4. P00015: Incorporate Tracking Number (Tn) 12 Into The Contract.
- Nasa Kennedy Space Center
- National Aeronautics And Space Administration (Nasa)
- $4,111,671.00
- National Aeronautics And Space Administration (Nasa)
- 80KSC021CA004
- Safety And Reliability Upgrade, Phase 4, Package 1. Mod 4:Extends The Completion Date To September 18, 2023 At No Cost Additional Cost As A Result Of Supplier Delay.
- 18 Mar 2022
- Safety And Reliability Upgrade, Phase 4, Package 1. Mod 4:Extends The Completion Date To September 18, 2023 At No Cost Additional Cost As A Result Of Supplier Delay.
- Nasa Kennedy Space Center
- National Aeronautics And Space Administration (Nasa)
- $4,079,739.00
- National Aeronautics And Space Administration (Nasa)
- 80KSC021CA004
- Safety And Reliability Upgrade, Phase 4, Package 1. Incorporated Request For Equitable Adjustment (Rea)-001 Cable Change To Reduce Schedule Impacts And Support Projected Outage Timeline, An Increase Of $72,256.00.
- 14 Jan 2022
- Safety And Reliability Upgrade, Phase 4, Package 1. Incorporated Request For Equitable Adjustment (Rea)-001 Cable Change To Reduce Schedule Impacts And Support Projected Outage Timeline, An Increase Of $72,256.00.
- Nasa Kennedy Space Center
- National Aeronautics And Space Administration (Nasa)
- $3,538,351.00
- National Aeronautics And Space Administration (Nasa)
- 80KSC021CA004
- Safety And Reliability Power Upgrades Phase 4 And 5 At Kennedy Space Center. Mod 11: Incorporates Tracking Number (Tn)-009 Contract Increase Of $236,065. The Contract Completion Date Changed To 2/13/24.
- 10 Jan 2023
- Safety And Reliability Power Upgrades Phase 4 And 5 At Kennedy Space Center. Mod 11: Incorporates Tracking Number (Tn)-009 Contract Increase Of $236,065. The Contract Completion Date Changed To 2/13/24.
- Nasa Kennedy Space Center
- National Aeronautics And Space Administration (Nasa)
- $4,079,739.00
- National Aeronautics And Space Administration (Nasa)
- 80KSC021CA004
- Safety And Reliability Upgrade, Phase 4, Package 1. Extends The Completion From September 18, 2023 To October 20, 2023 At No Cost Additional Cost As A Result Of Tracking Number 003.
- 30 Mar 2022
- Safety And Reliability Upgrade, Phase 4, Package 1. Extends The Completion From September 18, 2023 To October 20, 2023 At No Cost Additional Cost As A Result Of Tracking Number 003.
- Nasa Kennedy Space Center
- National Aeronautics And Space Administration (Nasa)
- $3,538,351.00
- National Aeronautics And Space Administration (Nasa)
- 80KSC021CA004
- Safety & Reliability Upgrade Ksc Institutional Power Sys, Ph 4, Pcn 98966.4 Mod 8: Incorporate Tracking Number (Tn)-005 Relocate Existing Cable In Manhole 77. Contract Increase Of $3,319
- 22 Sep 2022
- Safety & Reliability Upgrade Ksc Institutional Power Sys, Ph 4, Pcn 98966.4 Mod 8: Incorporate Tracking Number (Tn)-005 Relocate Existing Cable In Manhole 77. Contract Increase Of $3,319
- Nasa Kennedy Space Center
- National Aeronautics And Space Administration (Nasa)
- $4,079,739.00
- National Aeronautics And Space Administration (Nasa)
- 80KSC021CA004
- Safety & Reliability Upgrade Ksc Institutional Power Sys, Phase 4. Incorporates Tracking Number (Tn)-011 Cable Transfer Increase Of $7,886. The Contract Completion Date Changed To 3/14/24.
- 2 May 2023
- Safety & Reliability Upgrade Ksc Institutional Power Sys, Phase 4. Incorporates Tracking Number (Tn)-011 Cable Transfer Increase Of $7,886. The Contract Completion Date Changed To 3/14/24.
- Nasa Kennedy Space Center
- National Aeronautics And Space Administration (Nasa)
- $4,079,739.00
- National Aeronautics And Space Administration (Nasa)
- 80KSC021CA004
- Safety And Reliability Upgrade, Phase 4, Package 1. Implement Tracking Number -002 Medium Voltage Bushing Height Adjustment Modification To Correct Design. Contract Increased $12,002.
- 22 Dec 2021
- Safety And Reliability Upgrade, Phase 4, Package 1. Implement Tracking Number -002 Medium Voltage Bushing Height Adjustment Modification To Correct Design. Contract Increased $12,002.
- Nasa Kennedy Space Center
- National Aeronautics And Space Administration (Nasa)
- $3,538,351.00
- National Aeronautics And Space Administration (Nasa)
- 80KSC021CA004
- Safety & Reliability Upgrade Ksc Institutional Power Sys, Phase 4. Incorporates Tracking Number (Tn)-008 Provide Schedule Update Due To Artemis Delay. Contract Increase Of $39,269. Current Contract Completion Date Changed To January 16, 2024.
- 6 Dec 2022
- Safety & Reliability Upgrade Ksc Institutional Power Sys, Phase 4. Incorporates Tracking Number (Tn)-008 Provide Schedule Update Due To Artemis Delay. Contract Increase Of $39,269. Current Contract Completion Date Changed To January 16, 2024.
- Nasa Kennedy Space Center
- National Aeronautics And Space Administration (Nasa)
- $3,706,744.00
- National Aeronautics And Space Administration (Nasa)
- 80KSC021CA004
- Safety And Reliability Power Upgrades Phase 4 And 5 At Kennedy Space Center Mod 9: Incorporate Tracking Number (Tn)-007 Provide Generators. Contract Increase Of $129,124
- 3 Nov 2022
- Safety And Reliability Power Upgrades Phase 4 And 5 At Kennedy Space Center Mod 9: Incorporate Tracking Number (Tn)-007 Provide Generators. Contract Increase Of $129,124
- Nasa Kennedy Space Center
- National Aeronautics And Space Administration (Nasa)
- $4,079,739.00
- National Aeronautics And Space Administration (Nasa)
- 80KSC021CA004
- Safety And Reliability Upgrades Phase 4. P00016: Incorporate Tracking Number (Tn) 13 Into The Contract. Completion Date Extended To May 5, 2024.
- 25 Sep 2023
- Safety And Reliability Upgrades Phase 4. P00016: Incorporate Tracking Number (Tn) 13 Into The Contract. Completion Date Extended To May 5, 2024.
- Nasa Kennedy Space Center
- National Aeronautics And Space Administration (Nasa)
- $4,133,303.00
- National Aeronautics And Space Administration (Nasa)
- 80KSC021CA004
- Safety And Reliability Power Upgrades Phase 4 And 5 At Kennedy Space Center. Mod 12: Incorporates Tracking Number (Tn)-006 Vent H2s And (Tn)-010 Replace Pre Trip Increase Of $129,044. The Contract Completion Date Changed To 3/12/24.
- 1 Mar 2023
- Safety And Reliability Power Upgrades Phase 4 And 5 At Kennedy Space Center. Mod 12: Incorporates Tracking Number (Tn)-006 Vent H2s And (Tn)-010 Replace Pre Trip Increase Of $129,044. The Contract Completion Date Changed To 3/12/24.
- Nasa Kennedy Space Center
- National Aeronautics And Space Administration (Nasa)
- $4,079,739.00
- National Aeronautics And Space Administration (Nasa)
- 80KSC021CA004
- Eo14042 Safety And Reliability Power Upgrades Phase 4 And 5. Mod 1: Incorporates Far Clause 52.223-99, Ensuring Adequate Covid-19 Safety Protocols For Federal Contractors (Deviation 21-03). And Notice To Proceed Completion Date.
- 13 Oct 2021
- Eo14042 Safety And Reliability Power Upgrades Phase 4 And 5. Mod 1: Incorporates Far Clause 52.223-99, Ensuring Adequate Covid-19 Safety Protocols For Federal Contractors (Deviation 21-03). And Notice To Proceed Completion Date.
- Nasa Kennedy Space Center
- National Aeronautics And Space Administration (Nasa)
- $3,538,351.00
- National Aeronautics And Space Administration (Nasa)
- 80KSC023F0015
- Replace Space Station Processing Facility Generator Tap Box With New Upsized Disconnect Switches And Feeder Conduit. Incorporates Tracking Number 01 For $15,186.99 Period Of Performance Remains Unchanged And Is 9/30/2023.
- 13 Jun 2023
- Replace Space Station Processing Facility Generator Tap Box With New Upsized Disconnect Switches And Feeder Conduit. Incorporates Tracking Number 01 For $15,186.99 Period Of Performance Remains Unchanged And Is 9/30/2023.
- Nasa Kennedy Space Center
- National Aeronautics And Space Administration (Nasa)
- $240,636.99
- National Aeronautics And Space Administration (Nasa)
- 80KSC023F0094
- Install Flush Mounted Receptacles In Vehicle Assembly Building Rooms 3N1 And 3N8, Kennedy Space Center.
- 26 Sep 2023
- Install Flush Mounted Receptacles In Vehicle Assembly Building Rooms 3N1 And 3N8, Kennedy Space Center.
- Nasa Kennedy Space Center
- National Aeronautics And Space Administration (Nasa)
- $55,255.00
- National Aeronautics And Space Administration (Nasa)
- 80KSC023F0015
- Replace Space Station Processing Facility Generator Tap Box With New Upsized Disconect Switches And Feeder Conduit.
- 13 Dec 2022
- Replace Space Station Processing Facility Generator Tap Box With New Upsized Disconect Switches And Feeder Conduit.
- Nasa Kennedy Space Center
- National Aeronautics And Space Administration (Nasa)
- $225,450.00
- National Aeronautics And Space Administration (Nasa)
- 80KSC023F0031
- Repair/Replace Wooden Light Poles Due To Woodpecker Damage At M7-1354 And M7-1357 At Kennedy Space Center (Ksc).
- 22 Mar 2023
- Repair/Replace Wooden Light Poles Due To Woodpecker Damage At M7-1354 And M7-1357 At Kennedy Space Center (Ksc).
- Nasa Kennedy Space Center
- National Aeronautics And Space Administration (Nasa)
- $30,435.00
- National Aeronautics And Space Administration (Nasa)
- 80KSC024F0003
- Vehicle Assembly Building (Vab) 26Th Floor Led Lighting, Kennedy Space Center.
- 6 Dec 2023
- Vehicle Assembly Building (Vab) 26Th Floor Led Lighting, Kennedy Space Center.
- Nasa Kennedy Space Center
- National Aeronautics And Space Administration (Nasa)
- $50,800.00
- National Aeronautics And Space Administration (Nasa)
- 80KSC023F0055
- 120V Power Receptacles & Led Lighting For Ignition Over Pressure And Sound Suppression (Iopss) Valve Complex At Pad B.
- 12 Jul 2023
- 120V Power Receptacles & Led Lighting For Ignition Over Pressure And Sound Suppression (Iopss) Valve Complex At Pad B.
- Nasa Kennedy Space Center
- National Aeronautics And Space Administration (Nasa)
- $59,396.00
- National Aeronautics And Space Administration (Nasa)
- 80KSC022F0057
- Task 1 Vehicle Assembly Building (Vab) 28Th Floor Lighting A Tower & 25Th Floor Lighting F Tower.
- 25 Aug 2022
- Task 1 Vehicle Assembly Building (Vab) 28Th Floor Lighting A Tower & 25Th Floor Lighting F Tower.
- Nasa Kennedy Space Center
- National Aeronautics And Space Administration (Nasa)
- $45,430.00
- National Aeronautics And Space Administration (Nasa)