S. T. Wooten Corporation
CAGE Code: 02JN6
NCAGE Code: 02JN6
Status: Active
Type: Commercial Supplier
Dun & Bradstreet (DUNS): 024819682
Summary
S. T. Wooten Corporation is an Active Commercial Supplier with the Cage Code 02JN6 and is tracked by Dun & Bradstreet under DUNS Number 024819682..
Address
3801 Black Creek Rd Se
Wilson NC 27893-9568
United States
Points of Contact
No Points of Contact...
Related Information
People who viewed this 'CAGE Code' also viewed...
Hollow Tooth Aerial Llc Wheeler Electrical Company Kidde Technologies Inc Southern Time Equipment Co Inc Tranquil Hospitality Management Llc Barnes Motor & Parts Company, Inc. Baker Mechanical, Inc. Cardinal Insulation Co Inc Bullard Oilfield Services Inc Southern Piping Co Cox Industries Of Wilson, Inc White Ed Jr Water Professionals Watson Electrical Construction Co Barnes Motor And Parts Co Of All States Asbestos Pro Inc East Coast Enviromental Products And Southeastern Acoustical Panels Nucor Machined Products Inc Bel Air Staffing Llc
Frequently Asked Questions (FAQ) for CAGE 02JN6
- What is CAGE Code 02JN6?
- 02JN6 is the unique identifier used by NATO Organizations to reference the physical entity known as S. T. Wooten Corporation located at 3801 Black Creek Rd Se, Wilson NC 27893-9568, United States.
- Who is CAGE Code 02JN6?
- 02JN6 refers to S. T. Wooten Corporation located at 3801 Black Creek Rd Se, Wilson NC 27893-9568, United States.
- Where is CAGE Code 02JN6 Located?
- CAGE Code 02JN6 is located in Wilson, NC, USA.
Contracting History for CAGE 02JN6 Most Recent 25 Records
- N4008518F6508
- Igf::Ot::Igf X016 Frce - Repair High Power Run Up (Hpru) Pad, Bld
- 6 Nov 2018
- Igf::Ot::Igf X016 Frce - Repair High Power Run Up (Hpru) Pad, Bld
- Naval Fac Engineering Cmd Mid Lant
- Department Of Defense (Dod)
- $1,285,600.00
- Department Of Defense (Dod)
- N4008518F6508
- Igf::Ot::Igf X016 Frce - Repair High Power Run Up (Hpru) Pad, Bld
- 22 Aug 2018
- Igf::Ot::Igf X016 Frce - Repair High Power Run Up (Hpru) Pad, Bld
- Naval Fac Engineering Cmd Mid Lant
- Department Of Defense (Dod)
- $1,285,600.00
- Department Of Defense (Dod)
- N4008518F6137
- Igf::Ot::Igf X015 Site Design For Sr-10 Bzo Range
- 18 Dec 2018
- Igf::Ot::Igf X015 Site Design For Sr-10 Bzo Range
- Naval Fac Engineering Cmd Mid Lant
- Department Of Defense (Dod)
- $1,193,000.00
- Department Of Defense (Dod)
- N4008518F6137
- Igf::Ot::Igf X015 Site Design For Sr-10 Bzo Range
- 9 Jul 2018
- Igf::Ot::Igf X015 Site Design For Sr-10 Bzo Range
- Naval Fac Engineering Cmd Mid Lant
- Department Of Defense (Dod)
- $1,193,000.00
- Department Of Defense (Dod)
- HSCG2717P3JLG60
- Deliver&Pour 30 Yds Of Concrete
- 17 May 2017
- Deliver&Pour 30 Yds Of Concrete
- Base Portsmouth(00027)
- Department Of Homeland Security (Dhs)
- $3,990.00
- Department Of Homeland Security (Dhs)
- N4008511C4030
- Install An Emergency Shutoff For The Comminutor At Ps1229. Connect Existing Electrical Lines That Were Run From Bldg Fc294 To The Nearby Storage Shed Directly, Rather Than Through Ps322.
- 6 Apr 2017
- Install An Emergency Shutoff For The Comminutor At Ps1229. Connect Existing Electrical Lines That Were Run From Bldg Fc294 To The Nearby Storage Shed Directly, Rather Than Through Ps322.
- Naval Fac Engineering Cmd Mid Lant
- Department Of Defense (Dod)
- $82,296,373.74
- Department Of Defense (Dod)
- 0005
- Igf::Ot::Igf Relocate Existing Telecommunications Lines, Existing Poles, And Manholes That Conflict With Current Roadway Design And Install Type Ii Pedestrian And Signal. Provide All Labor, Equipment, And Materials To Complete The Following: -Move Metal Pole #1 On Contract Drawing Sheet Cz102 Forward (Southwest) Approx. 12-13' To Completely Avoid Lines In Conflict. Move Metal Pole #2 On Contract Drawing Sheet Cz101 Back (Northeast) Approx. 5 ' To Eliminate Conflict With Existing. Provide And Install A Type Ii Signal And Pedestal Adjacent To The Greenway Trail/Crosswalk. -Relocate Telephone Pedestal At Station 128+60 On Contract Drawing Sheet Cd105 Outside The Roadway Structure. Reroute (Government Furnished) 300 Pair Line And Pathway (~400') Per Sketch Provided By Base Telephone. Provide And Install 25 Pair Line And Pathway (~1000') Per Sketch Provided By Base Telephone. Install 2 Additional Pedestals (Bd4 And Bd7) Per Base Telephone Sketch. -Remove And Reinstall Light Poles (2) Currently Conflicting With New Roadway (North Side And South Side) Near Lyman Road Intersection On Contract Drawing Sheet Cd102 As To Not Be Less Than 7' From Roadway.
- 13 Feb 2017
- Igf::Ot::Igf Relocate Existing Telecommunications Lines, Existing Poles, And Manholes That Conflict With Current Roadway Design And Install Type Ii Pedestrian And Signal. Provide All Labor, Equipment, And Materials To Complete The Following: -Move Metal Pole #1 On Contract Drawing Sheet Cz102 Forward (Southwest) Approx. 12-13' To Completely Avoid Lines In Conflict. Move Metal Pole #2 On Contract Drawing Sheet Cz101 Back (Northeast) Approx. 5 ' To Eliminate Conflict With Existing. Provide And Install A Type Ii Signal And Pedestal Adjacent To The Greenway Trail/Crosswalk. -Relocate Telephone Pedestal At Station 128+60 On Contract Drawing Sheet Cd105 Outside The Roadway Structure. Reroute (Government Furnished) 300 Pair Line And Pathway (~400') Per Sketch Provided By Base Telephone. Provide And Install 25 Pair Line And Pathway (~1000') Per Sketch Provided By Base Telephone. Install 2 Additional Pedestals (Bd4 And Bd7) Per Base Telephone Sketch. -Remove And Reinstall Light Poles (2) Currently Conflicting With New Roadway (North Side And South Side) Near Lyman Road Intersection On Contract Drawing Sheet Cd102 As To Not Be Less Than 7' From Roadway.
- Naval Fac Engineering Cmd Mid Lant
- Department Of Defense (Dod)
- $4,205,822.00
- Department Of Defense (Dod)
- HSCG2717P3JLG44
- Deliver&Pour 30 Yds Of Concrete
- 10 May 2017
- Deliver&Pour 30 Yds Of Concrete
- Base Portsmouth(00027)
- Department Of Homeland Security (Dhs)
- $0.00
- Department Of Homeland Security (Dhs)
- N4008511C4030
- The Contractor Shall Provide All Materials, Labor, Equipment, And Incidental Related Work To Maintain The Pathway For The Gravity Sewer Line From Building 1317 To Continue To Flow Into The Associated Manhole By Cutting And Capping The Existing Force Main That The Sewer Ties Into.
- 10 Aug 2017
- The Contractor Shall Provide All Materials, Labor, Equipment, And Incidental Related Work To Maintain The Pathway For The Gravity Sewer Line From Building 1317 To Continue To Flow Into The Associated Manhole By Cutting And Capping The Existing Force Main That The Sewer Ties Into.
- Naval Fac Engineering Cmd Mid Lant
- Department Of Defense (Dod)
- $82,296,373.74
- Department Of Defense (Dod)
- 0005
- Igf::Ot::Igf Extend The Contract Completion Date By 83 Calendar Days
- 11 Apr 2017
- Igf::Ot::Igf Extend The Contract Completion Date By 83 Calendar Days
- Naval Fac Engineering Cmd Mid Lant
- Department Of Defense (Dod)
- $4,205,822.00
- Department Of Defense (Dod)
- N4008511C4030
- Per The Responses To Requests For Information 370 And 371, The Contractor Shall Provide All Material, Labor, Equipment, And Incidental Related Work To Perform The Following: 1. Locate The Four 4" Sewer Services From The Eod Addition (Item #5 On Drawing C302a Phase Ii Keynotes). Connect Services To The K To L 8" Sewer Main. 2. Remove Existing Manhole C (Demolition Keynote #1 On Drawing C302a). After The Removal Of Manhole C, Extend Existing B To C 8" Sewer Main To Existing Manhole K At A Minimum Slope Of 0.40%. 3. Locate The Existing 4" Sewer Service From The Eod Building (Item #4 On Drawing C303a Phase Ii Keynotes) And Extend To The J To K 6" Sewer Service. 4. Remove Manholes And Cleanouts To Inverts. Remove Or Fill Sewer Main From I To G With Flowable Concrete. After Completion Of The Changed Work, The Demolition Of Pump Station 292 Can Proceed.
- 27 Mar 2017
- Per The Responses To Requests For Information 370 And 371, The Contractor Shall Provide All Material, Labor, Equipment, And Incidental Related Work To Perform The Following: 1. Locate The Four 4" Sewer Services From The Eod Addition (Item #5 On Drawing C302a Phase Ii Keynotes). Connect Services To The K To L 8" Sewer Main. 2. Remove Existing Manhole C (Demolition Keynote #1 On Drawing C302a). After The Removal Of Manhole C, Extend Existing B To C 8" Sewer Main To Existing Manhole K At A Minimum Slope Of 0.40%. 3. Locate The Existing 4" Sewer Service From The Eod Building (Item #4 On Drawing C303a Phase Ii Keynotes) And Extend To The J To K 6" Sewer Service. 4. Remove Manholes And Cleanouts To Inverts. Remove Or Fill Sewer Main From I To G With Flowable Concrete. After Completion Of The Changed Work, The Demolition Of Pump Station 292 Can Proceed.
- Naval Fac Engineering Cmd Mid Lant
- Department Of Defense (Dod)
- $82,296,373.74
- Department Of Defense (Dod)
- 0007
- Igf::Ot::Igf Delete Requirement To Provide And Install Two New Light Poles, And Re-Use Two Existing Light Poles In The Ammo Supply Point Area Of Mcb Camp Lejeune.
- 3 Feb 2017
- Igf::Ot::Igf Delete Requirement To Provide And Install Two New Light Poles, And Re-Use Two Existing Light Poles In The Ammo Supply Point Area Of Mcb Camp Lejeune.
- Naval Fac Engineering Cmd Mid Lant
- Department Of Defense (Dod)
- $114,821.00
- Department Of Defense (Dod)
- N4008518F4383
- Igf::Ot::Igf Task Order Award - Road Repairs Sr10&Un300
- 15 Dec 2017
- Igf::Ot::Igf Task Order Award - Road Repairs Sr10&Un300
- Naval Fac Engineering Cmd Mid Lant
- Department Of Defense (Dod)
- $2,493,333.00
- Department Of Defense (Dod)
- N4008511C4030
- Per The Response To Rfi 368, Provide And Install An Air Release Valve At Cogdel's Creek Pump Station #2.
- 3 Feb 2017
- Per The Response To Rfi 368, Provide And Install An Air Release Valve At Cogdel's Creek Pump Station #2.
- Naval Fac Engineering Cmd Mid Lant
- Department Of Defense (Dod)
- $82,296,373.74
- Department Of Defense (Dod)
- N4008511C4030
- The Contractor Shall Provide All Materials, Labor, Equipment, And Incidental Related Work To Repair The Water Damage To The Telecommunications Infrastructure Located At The Intersection Of Birch Street And Holcomb Boulevard. The Scope Includes, But Is Not Limited To, The Following: Remove And Replace Damaged Section Of Concrete Ductbank And Replace Damaged Sections Of Empty Conduit. Repair Existing Conduit Sections With Existing Cables. Install Approximately 1500 Pair Awg Communication Cable In Repaired Ductbank Conduits. Backfill Appropriately For Ductbank Support And Fine Grade Disturbed Area To Include Seeding And Stabilization.
- 28 Mar 2017
- The Contractor Shall Provide All Materials, Labor, Equipment, And Incidental Related Work To Repair The Water Damage To The Telecommunications Infrastructure Located At The Intersection Of Birch Street And Holcomb Boulevard. The Scope Includes, But Is Not Limited To, The Following: Remove And Replace Damaged Section Of Concrete Ductbank And Replace Damaged Sections Of Empty Conduit. Repair Existing Conduit Sections With Existing Cables. Install Approximately 1500 Pair Awg Communication Cable In Repaired Ductbank Conduits. Backfill Appropriately For Ductbank Support And Fine Grade Disturbed Area To Include Seeding And Stabilization.
- Naval Fac Engineering Cmd Mid Lant
- Department Of Defense (Dod)
- $82,296,373.74
- Department Of Defense (Dod)
- HSCG2717P3JLG44
- Deliver&Pour 30 Yds Of Concrete
- 17 May 2017
- Deliver&Pour 30 Yds Of Concrete
- Base Portsmouth(00027)
- Department Of Homeland Security (Dhs)
- $0.00
- Department Of Homeland Security (Dhs)