Lee Grover Construction Company
Dba Lee Grover Construction
CAGE Code: 0D0N7
NCAGE Code: 0D0N7
Status: Active
Type: Commercial Supplier
Dun & Bradstreet (DUNS): 030703433
Summary
Lee Grover Construction Company, Dba Lee Grover Construction is an Active Commercial Supplier with the Cage Code 0D0N7 and is tracked by Dun & Bradstreet under DUNS Number 030703433..
Address
2102 S 11Th St
Saint Joseph MO 64503-2720
United States
Points of Contact
- Telephone:
- 8162797919
- Fax:
- 8162793664
Related Information
People who viewed this 'CAGE Code' also viewed...
American Electric Co Zenith Data Systems A-R Engineering Inc Gersonde Pin Leasing American Business Systems Wesley's Glass Inc Command Heating And Air Conditioning Bolin Auto-Truck Parts Co Whirlpool Corp Soakaholic/Coeval Inc Haul-A-Way Trash Service Snorkel Economy United Pharmacal Co Mo Inc Bendix Corp The Hydraulics Div Tire Pro Inc Zwartec Envision Tech, Inc. Manufacturers Rubber Supply Inc. Doran Co Llc The Scope Services Inc
Frequently Asked Questions (FAQ) for CAGE 0D0N7
- What is CAGE Code 0D0N7?
- 0D0N7 is the unique identifier used by NATO Organizations to reference the physical entity known as Lee Grover Construction Company Dba Lee Grover Construction located at 2102 S 11Th St, Saint Joseph MO 64503-2720, United States.
- Who is CAGE Code 0D0N7?
- 0D0N7 refers to Lee Grover Construction Company Dba Lee Grover Construction located at 2102 S 11Th St, Saint Joseph MO 64503-2720, United States.
- Where is CAGE Code 0D0N7 Located?
- CAGE Code 0D0N7 is located in Saint Joseph, MO, USA.
Contracting History for CAGE 0D0N7 Most Recent 25 Records
- W50S7G23F0009
- Bldg 19 Roof Replacement
- 28 Sep 2023
- Bldg 19 Roof Replacement
- W7nj Uspfo Activity Moang 139
- Department Of Defense (Dod)
- $276,265.00
- Department Of Defense (Dod)
- W50S7G22F0001
- Notice To Proceed Modification
- 15 Aug 2022
- Notice To Proceed Modification
- W7nj Uspfo Activity Moang 139
- Department Of Defense (Dod)
- $545,024.00
- Department Of Defense (Dod)
- W50S7G22F0001
- Building 1 Remodel And Upgrades Pop Extension
- 29 Mar 2023
- Building 1 Remodel And Upgrades Pop Extension
- W7nj Uspfo Activity Moang 139
- Department Of Defense (Dod)
- $576,760.88
- Department Of Defense (Dod)
- W50S7G22F0001
- Various Changes Due To Rfi's
- 25 Nov 2022
- Various Changes Due To Rfi's
- W7nj Uspfo Activity Moang 139
- Department Of Defense (Dod)
- $576,760.88
- Department Of Defense (Dod)
- W50S7G22F0001
- Building 1 Remodel And Upgrades
- 24 Jun 2022
- Building 1 Remodel And Upgrades
- W7nj Uspfo Activity Moang 139
- Department Of Defense (Dod)
- $576,760.88
- Department Of Defense (Dod)
- W50S7G21F0003
- Inclusion Of Eo14042 For Repair Building 51 Relocate Eoc
- 5 Dec 2021
- Inclusion Of Eo14042 For Repair Building 51 Relocate Eoc
- W7nj Uspfo Activity Moang 139
- Department Of Defense (Dod)
- $790,911.00
- Department Of Defense (Dod)
- W50S7G21F0003
- Provide The Necessary, Personnel, Equipment, Transportation, And Materials Required To Remodel Various Sections Of Building 51 To Include An Emergency Operations Center (Eoc), Multiple Offices, Two Small Restrooms And Common Areas.
- 22 Sep 2021
- Provide The Necessary, Personnel, Equipment, Transportation, And Materials Required To Remodel Various Sections Of Building 51 To Include An Emergency Operations Center (Eoc), Multiple Offices, Two Small Restrooms And Common Areas.
- W7nj Uspfo Activity Moang 139
- Department Of Defense (Dod)
- $794,094.81
- Department Of Defense (Dod)
- W50S7G21F0003
- Notice To Proceed Modification
- 5 Nov 2021
- Notice To Proceed Modification
- W7nj Uspfo Activity Moang 139
- Department Of Defense (Dod)
- $790,911.00
- Department Of Defense (Dod)
- W50S7G21F0003
- Building 51 In Scope Changes 02
- 13 Jun 2022
- Building 51 In Scope Changes 02
- W7nj Uspfo Activity Moang 139
- Department Of Defense (Dod)
- $794,094.81
- Department Of Defense (Dod)
- W50S7G21F0003
- Various In-Scope Changes
- 21 Mar 2022
- Various In-Scope Changes
- W7nj Uspfo Activity Moang 139
- Department Of Defense (Dod)
- $794,094.81
- Department Of Defense (Dod)
- W50S7G21F0003
- Exercise Option
- 28 Sep 2021
- Exercise Option
- W7nj Uspfo Activity Moang 139
- Department Of Defense (Dod)
- $790,911.00
- Department Of Defense (Dod)
- W50S7G21F0001
- Project No. Ulyb162003 Repair Bldg. 26
- 20 Apr 2021
- Project No. Ulyb162003 Repair Bldg. 26
- W7nj Uspfo Activity Moang 139
- Department Of Defense (Dod)
- $1,000,733.00
- Department Of Defense (Dod)
- W50S7G21F0001
- Clin 0001: Project No. Ulyb162003 Repair Bldg. 26 Clin 0002: Equipment Pad & Drainpipe Clin 1001: Option 1 Electrical Work Clin 2001: Option 2 Repair Automatic Entry Doors
- 26 Mar 2021
- Clin 0001: Project No. Ulyb162003 Repair Bldg. 26 Clin 0002: Equipment Pad & Drainpipe Clin 1001: Option 1 Electrical Work Clin 2001: Option 2 Repair Automatic Entry Doors
- W7nj Uspfo Activity Moang 139
- Department Of Defense (Dod)
- $1,018,549.75
- Department Of Defense (Dod)
- W50S7G21F0001
- Project No. Ulyb162003 Repair Bldg. 26
- 14 Dec 2021
- Project No. Ulyb162003 Repair Bldg. 26
- W7nj Uspfo Activity Moang 139
- Department Of Defense (Dod)
- $1,018,549.75
- Department Of Defense (Dod)
- W50S7G21F0001
- Project No. Ulyb162003 Repair Bldg. 26 Change Order #1
- 26 Oct 2021
- Project No. Ulyb162003 Repair Bldg. 26 Change Order #1
- W7nj Uspfo Activity Moang 139
- Department Of Defense (Dod)
- $1,018,549.75
- Department Of Defense (Dod)
- W50S7G21F0001
- Project No. Ulyb162003 Repair Bldg. 26
- 1 Mar 2022
- Project No. Ulyb162003 Repair Bldg. 26
- W7nj Uspfo Activity Moang 139
- Department Of Defense (Dod)
- $1,018,549.75
- Department Of Defense (Dod)
- W50S7G20C0002
- Fire Alarm System Repair For Buildings 1 And 3
- 28 Aug 2020
- Fire Alarm System Repair For Buildings 1 And 3
- W7nj Uspfo Activity Moang 139
- Department Of Defense (Dod)
- $140,104.00
- Department Of Defense (Dod)
- W50S7G20C0001
- Period Of Performance Extension
- 30 Jun 2023
- Period Of Performance Extension
- W7nj Uspfo Activity Moang 139
- Department Of Defense (Dod)
- $6,380,736.41
- Department Of Defense (Dod)
- W50S7G20C0001
- Const C-130 Simulator Facility Change Order 5 - Design/Construction Changes
- 17 Jun 2022
- Const C-130 Simulator Facility Change Order 5 - Design/Construction Changes
- W7nj Uspfo Activity Moang 139
- Department Of Defense (Dod)
- $6,337,077.17
- Department Of Defense (Dod)
- W50S7G20C0001
- Corrections For Rfi
- 6 Jul 2023
- Corrections For Rfi
- W7nj Uspfo Activity Moang 139
- Department Of Defense (Dod)
- $6,380,736.41
- Department Of Defense (Dod)
- W50S7G20C0001
- E.O. 14042 For Const C-130 Simulator Facility
- 5 Dec 2021
- E.O. 14042 For Const C-130 Simulator Facility
- W7nj Uspfo Activity Moang 139
- Department Of Defense (Dod)
- $5,751,664.65
- Department Of Defense (Dod)
- W50S7G20C0001
- Prioritized Construction Changes Resulting From Design Modifications
- 23 Jul 2021
- Prioritized Construction Changes Resulting From Design Modifications
- W7nj Uspfo Activity Moang 139
- Department Of Defense (Dod)
- $5,653,014.65
- Department Of Defense (Dod)
- W50S7G20C0001
- Temporary Tenting And Heating Due To Winter Weather.
- 8 Jan 2022
- Temporary Tenting And Heating Due To Winter Weather.
- W7nj Uspfo Activity Moang 139
- Department Of Defense (Dod)
- $5,751,664.65
- Department Of Defense (Dod)
- W50S7G20C0001
- C-130 Flight Simulator Modification For Submittal Delays And Rfi Additional Costs
- 9 Sep 2022
- C-130 Flight Simulator Modification For Submittal Delays And Rfi Additional Costs
- W7nj Uspfo Activity Moang 139
- Department Of Defense (Dod)
- $6,337,077.17
- Department Of Defense (Dod)
- W50S7G20C0001
- Gravel And Stair Changes Modification
- 7 Jan 2023
- Gravel And Stair Changes Modification
- W7nj Uspfo Activity Moang 139
- Department Of Defense (Dod)
- $6,338,460.27
- Department Of Defense (Dod)